| 1 | Survey Work & Jungle cutting for survey of pond |
| 2 | Site cleaning & Dag balling of site & making of approach road |
| 3 | Earth work in Excavation in(Mar, Ranker and Kankar mixed dry soil) in digging or in embankment including lead up to 30 m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechanical compation. ID SOR 4.04 (0.00 to 1.5 mtr.) above G.L. ( machine /mannual by any means) ) |
| 4 | Earth work in Excavation in(Mar, Ranker and Kankar mixed dry soil) in digging or in embankment including lead up to 30 m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechanical compation. ID SOR 4.04 (from 1.5 mtr. to beyond 3.0 mtr.) ( machine /mannual by any means) ) |
| 5 | Removal of slush (excluding cost of dewatering) from the bed of nala/pond. SOR 4.17 |
| 6 | Earth work in Excavation in Saturated soil (excluding cost of dewatering) mar kabar and rankar soil in foundation of wall, pier, abutment etc with disposal with in 30 mtr lead and 1.50 mtr lift. ID SOR 4.08 (0.00 mtr. to 1.5mtr.) ( machine /mannual by any means ) |
| 7 | Earth work in Excavation in Saturated soil (excluding cost of dewatering) mar kabar and rankar soil in foundation of wall, pier, abutment etc with disposal with in 30 mtr lead and 1.50 mtr lift. ID SOR 4.08 (from 1.5mtr. to beyond 3mtr.) (machine /mannual by any means ) |
| 8 | Earth work in excavation in mar kabar and rankar soil in foundationof wall,pier,abutment etc with disposal with in 30 mtr lead and 1.50 mtr lift.ID SOR 4.14 b ( 0.0mtr to 1.5 mtr). |
| 9 | Sand filling for foundation of Inlet,Outlet,Ramp,Ghat. |
| 10 | C.C.in 1:3:6 Cement, Sand and 25 to 50 mm Stone ballast including the cost of materials labours and etc. required for proper completion of work.(Inlet,Outlet,Ramp,Ghat.) |
| 11 | R.C.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work.(Inlet,Outlet,Ramp,Ghat.) |
| 12 | SUPPLY& FIXING OF 1000mm NP3 HUME PIPE WITH COLLAR (Inlet |
| 13 | C.C.in 1:2:4 Cement, Sand and 10 to 20 mm gritincluding the cost of materials labours and etc.to required for proper completion of work.(Inlet,Outlet,Ramp,Ghat.) |
| 14 | Plaster work in1:3 c/s mortar 20 mm thick on stone masonery work |
| 15 | Dry stone boulder filling in D/S & U/S in one chamber of each (Inlet,Outlet.) |
| 16 | Dewatering during the work before excavation of slush/saturarated soil by 8 HP Diesel pumping set. |
| 17 | Supply & fixing of citizens information board at the site.(C.I.B.) |