| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 03-05-2025 | Corrigendum | Other | 05-05-2025 |
| Sl. No. | Item Description |
| 1 | Construction of RCC H.L. Bridge In Araria Kursakanta RoadTo EVM Sikti Via Kamat Chowk Tola at Ch-0.850 Kms. |
| 2 | H.L. BRIDGE WORK |
| 3 | FOUNDATION |
| 4 | Excavation for Structures |
| 5 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 6 | i) Upto 3m depth |
| 7 | Providing and laying of PCC M15 levelling course 100mm thick below the pile cap. |
| 8 | II. PCC Grade M-15 (Levelling Course for Pile Cap) |
| 9 | R.C.C. grade M 35 in Pile Foundation complete as per Dwg & Tech Specification. |
| 10 | Pile Cap in RCC M-35 (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 11 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. |
| 12 | II. 1200 mm Dia(UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 13 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 14 | Providing Steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing |
| 15 | Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth |
| 16 | Providing and constructing One Span Service Road to reach island location from one pier location to another pier location including Royality for earth |
| 17 | Carrying out the Confirmatory Boring for Soil Investigation for foundation as per clause 2400 of MORT&H Specification. |
| 18 | Carrying Out Load Testonany pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap aftertest and cleaning the site and maintaining complete records of load |
| 19 | a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings |
| 20 | 1.2 m Dia Pile |
| 21 | b) Routine pile load test on pile for 1.5 times the design load specified in Drawings |
| 22 | 1.2 m Dia Pile (2% of piles in total). |
| 23 | c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings |
| 24 | 1.2 m Dia Pile (2% ofpiles in total) . |
| 25 | SUBSTRUCTURE |
| 26 | R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification |
| 27 | i) Upto 5m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 28 | ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 29 | R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification |
| 30 | ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 31 | Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 32 | Supplying,fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. |
| 33 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 34 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 |
| 35 | I) Sandy Material |
| 36 | Providing and laying filter media with granular crushedaggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 37 | SUPERSTRUCTURE |
| 38 | Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 |
| 39 | II. RCC M-30 (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 40 | Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202 |
| 41 | Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 |
| 42 | Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 |
| 43 | Drainage Spouts complete as per drawing and technical specifications Clause 1209 |
| 44 | P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211. |
| 45 | Reinforced Cement Concrete M-30 Grade Approach Slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 |
| 46 | Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm,complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.) |
| 47 | Providing & fixing 20 mm thick Compressible Fibre Board in expansion joint complete as per drawing & Technical Specification. |
| 48 | Providing and fixing in position 20 mm thick Premoulded jPJoint Filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm,covered with sealant complete as per drawing and technical specifications. |
| 49 | PROTECTION WORK |
| 50 | Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 |
| 51 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 52 | Miscellaneous Work |
| 53 | Providing & Applying 2 coats of water based cement paints to unplastered concrete surface after cleaning the surface of dirt,dust,oil,grease,effloresence and applying paint @ of 1 litre for 2 sqm |
| 54 | APPROCH ROAD |
| 55 | Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I |
| 56 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 57 | Construction of Subgrade And Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 58 | GSB (G-II) :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 59 | WBM Grading 2:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. |
| 60 | Wet Mix Maccadam:- Providing Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. |
| 61 | PRIME COAT:- Providing and applying primer coat with Bitumen emulsion (SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. |
| 62 | TACK COAT:- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared Granular surface cleaned with hydraulic broom as per technical specification clause 503. |
| 63 | Bituminous Macadam:- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. |
| 64 | TACK COAT:- Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 65 | Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. |
| 66 | Cement Concrete Pavement (PQC) :- Construction of un-reinforced, plain cement concrete pavement (M35 Grade) over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form paver, spread, compacted and finished in a continuous operation including provision of 0.5 x 0.5 panel, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing |
| 67 | Providing and Fixing \"Logo\" of Projectinformayory sign board with Logo as per MORD specifications and drawing.Three MS plates of1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges.The lower plate will be welded with MS angle ironframe of25mm x 25mm 5mm.The angle iron frame of the lower mostplate and flat iron frame of middle plate will be welded to 2 Nos.75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube.All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1. |
| 68 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as perdrawings and Technical Specification Clause 801 |
| 69 | 900 mm equilateral & triangle |
| 70 | 900 mm side octagon |
| 71 | 900 mm x 300 mm,Hazard Marker |
| 72 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. |
| 73 | Type - A, \"W\" : Metal Beam Crash Barrier:-Providing and erecting a \"W\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 |
| 74 | DIVERSION |
| 75 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 76 | Granular Sub-base with Well Graded Material (Table 400.1) Grading I -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 77 | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row (1000 MM DIA HPC) |
| 78 | MISCELLANEOUS |
| 79 | Dismantling of Existing Structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC Work/RCC) |
| 80 | Dismantling of Existing Pavement Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately |
| 81 | 1% LABOUR CESS |
| 82 | SEIGNOIRAGE FEE |
| 83 | 18% GST |
| 84 | Total Cost for 1st Year Maintenance Work |
| 85 | Total Cost for 2nd Year Maintenance Works |
| 86 | Total Cost for 3rd Year Maintenance Works |
| 87 | Total Cost for 4th Year Maintenance Works |
| 88 | Total Cost for 5th Year Maintenance Works |
| 89 | 1% LABOUR CESS |
| 90 | SEIGNOIRAGE FEE |
| 91 | 18% GST |
| 92 | Construction of RCC H.L. Bridge in Rani ChowkTo Badholi via Satghara Path at Ch-0.660 Kms. |
| 93 | H.L. BRIDGE WORK |
| 94 | FOUNDATION |
| 95 | Excavation for Structures |
| 96 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 97 | i) Upto 3m depth |
| 98 | Providing and laying of PCC M15 levelling course 100mm thick below the pile cap. |
| 99 | II. PCC Grade M-15 (Levelling Course for Pile Cap) |
| 100 | R.C.C. grade M 35 in Pile Foundation complete as per Dwg & Tech Specification. |
| 101 | Pile Cap in RCC M-35 (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 102 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. |
| 103 | II. 1200 mm Dia(UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 104 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 105 | Providing Steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing |
| 106 | Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth |
| 107 | Providing and constructing One Span Service Road to reach island location from one pier location to another pier location including Royality for earth |
| 108 | Carrying out the Confirmatory Boring for Soil Investigation for foundation as per clause 2400 of MORT&H Specification. |
| 109 | Carrying Out Load Testonany pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap aftertest and cleaning the site and maintaining complete records of load |
| 110 | a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings |
| 111 | 1.2 m Dia Pile |
| 112 | b) Routine pile load test on pile for 1.5 times the design load specified in Drawings |
| 113 | 1.2 m Dia Pile (2% of piles in total). |
| 114 | c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings |
| 115 | 1.2 m Dia Pile (2% ofpiles in total) . |
| 116 | SUBSTRUCTURE |
| 117 | R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification |
| 118 | i) Upto 5m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 119 | ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 120 | R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification |
| 121 | ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 122 | Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 123 | Supplying,fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. |
| 124 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 125 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 |
| 126 | I) Sandy Material |
| 127 | Providing and laying filter media with granular crushedaggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 128 | SUPERSTRUCTURE |
| 129 | Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 |
| 130 | II. RCC M-30 (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 131 | Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202 |
| 132 | Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 |
| 133 | Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 |
| 134 | Drainage Spouts complete as per drawing and technical specifications Clause 1209 |
| 135 | P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211. |
| 136 | Reinforced Cement Concrete M-30 Grade Approach Slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 |
| 137 | Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm,complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.) |
| 138 | Providing & fixing 20 mm thick Compressible Fibre Board in expansion joint complete as per drawing & Technical Specification. |
| 139 | Providing and fixing in position 20 mm thick Premoulded jPJoint Filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm,covered with sealant complete as per drawing and technical specifications. |
| 140 | PROTECTION WORK |
| 141 | Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 |
| 142 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 143 | Providing and laying Flooring Laid Over Cement Concrete Bedding complete as per drawing and technical specification Clause 1303 |
| 144 | Miscellaneous Work |
| 145 | Providing & Applying 2 coats of water based cement paints to unplastered concrete surface after cleaning the surface of dirt,dust,oil,grease,effloresence and applying paint @ of 1 litre for 2 sqm |
| 146 | APPROCH ROAD |
| 147 | Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I |
| 148 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 149 | Construction of Subgrade And Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 150 | GSB (G-II) :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 151 | WBM Grading 2:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. |
| 152 | Wet Mix Maccadam:- Providing Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. |
| 153 | PRIME COAT:- Providing and applying primer coat with Bitumen emulsion (SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. |
| 154 | TACK COAT:- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared Granular surface cleaned with hydraulic broom as per technical specification clause 503. |
| 155 | Bituminous Macadam:- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. |
| 156 | TACK COAT:- Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 157 | Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. |
| 158 | Providing and Fixing \"Logo\" of Projectinformayory sign board with Logo as per MORD specifications and drawing.Three MS plates of1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges.The lower plate will be welded with MS angle ironframe of25mm x 25mm 5mm.The angle iron frame of the lower mostplate and flat iron frame of middle plate will be welded to 2 Nos.75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube.All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1. |
| 159 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as perdrawings and Technical Specification Clause 801 |
| 160 | 900 mm equilateral & triangle |
| 161 | 900 mm side octagon |
| 162 | 900 mm x 300 mm,Hazard Marker |
| 163 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. |
| 164 | Type - A, \"W\" : Metal Beam Crash Barrier:-Providing and erecting a \"W\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 |
| 165 | DIVERSION |
| 166 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 167 | Granular Sub-base with Well Graded Material (Table 400.1) Grading I -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 168 | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row (1000 MM DIA HPC) |
| 169 | MISCELLANEOUS |
| 170 | Dismantling of Existing Structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC Work/RCC) |
| 171 | BOULDER PITCHING IN PROTECTION WORK |
| 172 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 173 | Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9Sand Filling |
| 174 | Providing and laying Boulder pitching on slopes with stone/ Boulder laid over prepared filter media as per drawing and technical specifications Clause 1302 (WIRE CARATED) |
| 175 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 176 | 1% LABOUR CESS |
| 177 | SEIGNOIRAGE FEE |
| 178 | 18% GST |
| 179 | Total Cost for 1st Year Maintenance Work |
| 180 | Total Cost for 2nd Year Maintenance Works |
| 181 | Total Cost for 3rd Year Maintenance Works |
| 182 | Total Cost for 4th Year Maintenance Works |
| 183 | Total Cost for 5th Year Maintenance Works |
| 184 | 1% LABOUR CESS |
| 185 | SEIGNOIRAGE FEE |
| 186 | 18% GST |
| 187 | Construction of RCC H.L. Bridge in PWD Sharanpur SouthTo Matnaja At Ch-0.300 Kms. |
| 188 | H.L. BRIDGE WORK |
| 189 | FOUNDATION |
| 190 | Excavation for Structures |
| 191 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 192 | i) Upto 3m depth |
| 193 | Providing and laying of PCC M15 levelling course 100mm thick below the pile cap. |
| 194 | II. PCC Grade M-15 (Levelling Course for Pile Cap) |
| 195 | R.C.C. grade M 35 in Pile Foundation complete as per Dwg & Tech Specification. |
| 196 | Pile Cap in RCC M-35 (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 197 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. |
| 198 | II. 1200 mm Dia(UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 199 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 200 | Providing Steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing |
| 201 | Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth |
| 202 | Providing and constructing One Span Service Road to reach island location from one pier location to another pier location including Royality for earth |
| 203 | Carrying out the Confirmatory Boring for Soil Investigation for foundation as per clause 2400 of MORT&H Specification. |
| 204 | Carrying Out Load Testonany pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap aftertest and cleaning the site and maintaining complete records of load |
| 205 | a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings |
| 206 | 1.2 m Dia Pile |
| 207 | b) Routine pile load test on pile for 1.5 times the design load specified in Drawings |
| 208 | 1.2 m Dia Pile (2% of piles in total). |
| 209 | c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings |
| 210 | 1.2 m Dia Pile (2% ofpiles in total) . |
| 211 | SUBSTRUCTURE |
| 212 | R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification |
| 213 | i) Upto 5m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 214 | ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 215 | R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification |
| 216 | ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 217 | Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 218 | Supplying,fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. |
| 219 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 220 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 |
| 221 | I) Sandy Material |
| 222 | Providing and laying filter media with granular crushedaggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 223 | SUPERSTRUCTURE |
| 224 | Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 |
| 225 | II. RCC M-30 (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 226 | Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202 |
| 227 | Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 |
| 228 | Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 |
| 229 | Drainage Spouts complete as per drawing and technical specifications Clause 1209 |
| 230 | P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211. |
| 231 | Reinforced Cement Concrete M-30 Grade Approach Slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 |
| 232 | Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm,complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.) |
| 233 | Providing & fixing 20 mm thick Compressible Fibre Board in expansion joint complete as per drawing & Technical Specification. |
| 234 | Providing and fixing in position 20 mm thick Premoulded jPJoint Filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm,covered with sealant complete as per drawing and technical specifications. |
| 235 | PROTECTION WORK |
| 236 | Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 |
| 237 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 238 | Miscellaneous Work |
| 239 | Providing & Applying 2 coats of water based cement paints to unplastered concrete surface after cleaning the surface of dirt,dust,oil,grease,effloresence and applying paint @ of 1 litre for 2 sqm |
| 240 | APPROCH ROAD |
| 241 | Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I |
| 242 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 243 | Construction of Subgrade And Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 244 | GSB (G-II) :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 245 | WBM Grading 2:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. |
| 246 | Wet Mix Maccadam:- Providing Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. |
| 247 | PRIME COAT:- Providing and applying primer coat with Bitumen emulsion (SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. |
| 248 | TACK COAT:- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared Granular surface cleaned with hydraulic broom as per technical specification clause 503. |
| 249 | Bituminous Macadam:- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. |
| 250 | TACK COAT:- Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 251 | Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. |
| 252 | Providing and Fixing \"Logo\" of Projectinformayory sign board with Logo as per MORD specifications and drawing.Three MS plates of1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges.The lower plate will be welded with MS angle ironframe of25mm x 25mm 5mm.The angle iron frame of the lower mostplate and flat iron frame of middle plate will be welded to 2 Nos.75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube.All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1. |
| 253 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as perdrawings and Technical Specification Clause 801 |
| 254 | 900 mm equilateral & triangle |
| 255 | 900 mm side octagon |
| 256 | 900 mm x 300 mm,Hazard Marker |
| 257 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. |
| 258 | Type - A, \"W\" : Metal Beam Crash Barrier:-Providing and erecting a \"W\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 |
| 259 | DIVERSION |
| 260 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 261 | Granular Sub-base with Well Graded Material (Table 400.1) Grading I -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 262 | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row (1000 MM DIA HPC) |
| 263 | MISCELLANEOUS |
| 264 | Dismantling of Existing Structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC Work/RCC) |
| 265 | BOULDER PITCHING IN PROTECTION WORK |
| 266 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 267 | Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9Sand Filling |
| 268 | Providing and laying Boulder pitching on slopes with stone/ Boulder laid over prepared filter media as per drawing and technical specifications Clause 1302 (WIRE CARATED) |
| 269 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 270 | 1% LABOUR CESS |
| 271 | SEIGNOIRAGE FEE |
| 272 | 18% GST |
| 273 | Total Cost for 1st Year Maintenance Work |
| 274 | Total Cost for 2nd Year Maintenance Works |
| 275 | Total Cost for 3rd Year Maintenance Works |
| 276 | Total Cost for 4th Year Maintenance Works |
| 277 | Total Cost for 5th Year Maintenance Works |
| 278 | 1% LABOUR CESS |
| 279 | SEIGNOIRAGE FEE |
| 280 | 18% GST |
| 281 | Construction of RCC H.L. Bridge In L055 - T02 To Bathurbari East (VR54) At Ch-1.000 Kms. |
| 282 | H.L. BRIDGE WORK |
| 283 | FOUNDATION |
| 284 | Excavation for Structures |
| 285 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 286 | i) Upto 3m depth |
| 287 | Providing and laying of PCC M15 levelling course 100mm thick below the pile cap. |
| 288 | II. PCC Grade M-15 (Levelling Course for Pile Cap) |
| 289 | R.C.C. grade M 35 in Pile Foundation complete as per Dwg & Tech Specification. |
| 290 | Pile Cap in RCC M-35 (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 291 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. |
| 292 | II. 1200 mm Dia(UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 293 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 294 | Providing Steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing |
| 295 | Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth |
| 296 | Providing and constructing One Span Service Road to reach island location from one pier location to another pier location including Royality for earth |
| 297 | Carrying out the Confirmatory Boring for Soil Investigation for foundation as per clause 2400 of MORT&H Specification. |
| 298 | Carrying Out Load Testonany pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap aftertest and cleaning the site and maintaining complete records of load |
| 299 | a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings |
| 300 | 1.2 m Dia Pile |
| 301 | b) Routine pile load test on pile for 1.5 times the design load specified in Drawings |
| 302 | 1.2 m Dia Pile (2% of piles in total). |
| 303 | c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings |
| 304 | 1.2 m Dia Pile (2% ofpiles in total) . |
| 305 | SUBSTRUCTURE |
| 306 | R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification |
| 307 | i) Upto 5m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 308 | ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 309 | R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification |
| 310 | ii) From 5m upto 10m height (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 311 | Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 312 | Supplying,fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. |
| 313 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 314 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 |
| 315 | I) Sandy Material |
| 316 | Providing and laying filter media with granular crushedaggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 317 | SUPERSTRUCTURE |
| 318 | Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 |
| 319 | II. RCC M-30 (UsingBatching Plant, Transit Mixer and Concrete Pump) |
| 320 | Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202 |
| 321 | Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 |
| 322 | Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 |
| 323 | Drainage Spouts complete as per drawing and technical specifications Clause 1209 |
| 324 | P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211. |
| 325 | Reinforced Cement Concrete M-30 Grade Approach Slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 |
| 326 | Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm,complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.) |
| 327 | Providing & fixing 20 mm thick Compressible Fibre Board in expansion joint complete as per drawing & Technical Specification. |
| 328 | Providing and fixing in position 20 mm thick Premoulded jPJoint Filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm,covered with sealant complete as per drawing and technical specifications. |
| 329 | PROTECTION WORK |
| 330 | Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 |
| 331 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 332 | Miscellaneous Work |
| 333 | Providing & Applying 2 coats of water based cement paints to unplastered concrete surface after cleaning the surface of dirt,dust,oil,grease,effloresence and applying paint @ of 1 litre for 2 sqm |
| 334 | APPROCH ROAD |
| 335 | Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I |
| 336 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 337 | Construction of Subgrade And Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 338 | GSB (G-II) :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 339 | WBM Grading 2:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. |
| 340 | Wet Mix Maccadam:- Providing Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. |
| 341 | PRIME COAT:- Providing and applying primer coat with Bitumen emulsion (SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. |
| 342 | TACK COAT:- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared Granular surface cleaned with hydraulic broom as per technical specification clause 503. |
| 343 | Bituminous Macadam:- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. |
| 344 | TACK COAT:- Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 345 | Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. |
| 346 | Providing and Fixing \"Logo\" of Projectinformayory sign board with Logo as per MORD specifications and drawing.Three MS plates of1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges.The lower plate will be welded with MS angle ironframe of25mm x 25mm 5mm.The angle iron frame of the lower mostplate and flat iron frame of middle plate will be welded to 2 Nos.75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube.All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1. |
| 347 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as perdrawings and Technical Specification Clause 801 |
| 348 | 900 mm equilateral & triangle |
| 349 | 900 mm side octagon |
| 350 | 900 mm x 300 mm,Hazard Marker |
| 351 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. |
| 352 | Type - A, \"W\" : Metal Beam Crash Barrier:-Providing and erecting a \"W\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 |
| 353 | DIVERSION |
| 354 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 355 | Granular Sub-base with Well Graded Material (Table 400.1) Grading I -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 356 | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row (1000 MM DIA HPC) |
| 357 | MISCELLANEOUS |
| 358 | Dismantling of Existing Structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC Work/RCC) |
| 359 | BOULDER PITCHING IN PROTECTION WORK |
| 360 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 361 | Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9Sand Filling |
| 362 | Providing and laying Boulder pitching on slopes with stone/ Boulder laid over prepared filter media as per drawing and technical specifications Clause 1302 (WIRE CARATED) |
| 363 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 364 | 1% LABOUR CESS |
| 365 | SEIGNOIRAGE FEE |
| 366 | 18% GST |
| 367 | Total Cost for 1st Year Maintenance Work |
| 368 | Total Cost for 2nd Year Maintenance Works |
| 369 | Total Cost for 3rd Year Maintenance Works |
| 370 | Total Cost for 4th Year Maintenance Works |
| 371 | Total Cost for 5th Year Maintenance Works |
| 372 | 1% LABOUR CESS |
| 373 | SEIGNOIRAGE FEE |
| 374 | 18% GST |