|
| 1 | Loading, carriage of following items from Store Centre, Gauriganj/Sultanpur to dump store including unloading and proper stacking (distance 0-70 km.) |
| 2 | STP/PCC pole |
| 3 | ACSR Weasel Conductor |
| 4 | ACSR Dog Conductor |
| 5 | AB cable |
| 6 | 11 KV Pin/Disk insulator |
| 7 | Stay complete |
| 8 | 11 KV Cross arm |
| 9 | Cable jointing kit indoor/outdoor all size |
| 10 | Cable jointing state through all size |
| 11 | Other Line Materials |
| 12 | Dragging of STP/PCC Pole from dump store to pit site. |
| 13 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement. Fabrication & erection of single pole support on PCC/STP pole support including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 14 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement. Fabrication & erection of double pole support on P.C.C./STP pole includingdigging of pit & fixing of all accessories and clampsas per RESPO norms. |
| 15 | Grouting of STP/PCC pole in ratio 1:4:8 with cement stone ballast, coarse sand and plinthing 300 mm above ground level as well as muffing of plinth. |
| 16 | Spreading, laying & stringing of ACSR weasel conductor for construction of 11 KV line as per RESPO norms. |
| 17 | Spreading, laying & stringing of ACSR Dog conductor for construction of 11 KV line as per RESPO norms. |
| 18 | Erection of stay as well as concreting as per RESPO norms. |
| 19 | Guarding of line as per RESPO norms. |
| 20 | Replacement of damaged/burned AB cable. |
| 21 | Resagging/Re-stringing of lose old conductor of HT/LT line alongwith opening & Binding of insulator/Re-stringing of line & its proper binding and jumpering. |
| 22 | Reconnection of disconnected wires of consumers. |
| 23 | Fixing & instalation of cable jointing kit indoor/outdoor all size. |
| 24 | Fixing & instalation of state through all size. |
| 25 | Providing and fixing of Holding Clamp for PCC/ST Pole (Cross Arm) |
| 26 | Providing and fixing of Holding Clamp for top channel (STP/PCC) |
| 27 | Providing and fixing of F Bracket |
| 28 | Providing and fixing LT shackle Insulator on PCC/ST Pole |
| 29 | Providing and fixing Stay Insulator on PCC/ST Pole |
| 30 | Tree cutting for clearance of 11 KV/33 KV/LT line. |