Name of Work: Rectification of alignment of PEB footings of Inspection shop extension shed by Jack mechanism, MidhaniNote: Contractor has to quote overall price viz price + taxes + GST + Cess. The accuracy shall be up to two decimals
Sl. No.
Item Description
1
Consultancy service includes comprehensive engineering support and supervision for the successful shifting of misaligned footings using a hydraulic jack system Scope includes site assessment, technical supervision and final report with alignment drawing.
2
Earth work in surface excavation exceeding 30 cm in depth but not exceeding 1.5 m in width as well as 10sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5 m, as directed by Engineer-in-charge: All kinds of soil
3
Back filling the available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20cm in depth and consolidating each deposited layer by ramming and watering lead upto 50m and for all lift as per instructions of EIC.
4
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete , Concrete of M25 grade with minimum cement content of 330 kg /cum
5
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
6
a) Installation of Hydraulic jack system for footings Supply and installation of hydraulic jack (capacity > footing load MS base plates and supports for controlled shifting of footings and also includes dismantling of jack setup and site clearance after shifting and aligningb) Lateral shifting of Footing Controlled shifting to correct alignment in both directions using jack system, rollers and steel skidsc) Monitoring and Quality Assurance includes level monitoring during jacking, alignment checks with total station
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.