| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. |
| 2 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. |
| 3 | Beyond 30 cm girth up to and including 60 cm girth |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 5 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : |
| 7 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for : |
| 9 | Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.. |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 12 | Suspended floors, roofs, landings, balconies and access platform |
| 13 | Weather shade, Chajjas, corbels etc., including edges |
| 14 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 15 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 16 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). |
| 17 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : |
| 18 | Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 19 | Welding by gas or electric plant including transportation of plant at site etc. complete. |
| 20 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 21 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 22 | Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows all complete with : |
| 23 | 4.0 mm thick glass panes. |
| 24 | Easing, oiling and cleaning of collapsible gate grill etc by cleaning agent as per direction of Engineer-in-charge. |
| 25 | Easing of existing rolling shutter of any size by oiling, greasing etc i/c necessary repair by welding if required and make it workable as per direction of Engineer-in-charge. |
| 26 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. |
| 27 | 110 mm diameter |
| 28 | Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. |
| 29 | Single tee with door - 110x110x110 mm |
| 30 | Bend 87.5° -110 mm bend |
| 31 | Bend 87.5 degree-110 mm door bend. |
| 32 | PVC Cowl -100 mm dia |
| 33 | Providing and fixing MS clamp of 25x5 mm flat of leg size 150mm each with necessary screws to UPVC rain water pipes including priming coat and synthetic paint as per direction of Engineer-in-charge. |
| 34 | 110mm UPVC pipe |
| 35 | 160mm UPVC pipe |
| 36 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-Charge) of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /seIf tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 37 | Providing and mixing of liquid bonding materials of \"Sika Latex\" or equvallent @ 7.5 kg/100 sqm in 1st coat in cement slurry over new surface and another 2nd coat in same proportion and grading will be carried out when the slurry coat is green for proper bonding with grading concrete all complete as per direction of engineer in charge. |
| 38 | Providing and fixing on wall face unplasticised Rigid PVC pipes of Supreme or equivalent for Soil/Sewage line conforming to IS : 13592 Type B, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i)Single socketed pipes. |
| 39 | 110 mm diameter |
| 40 | Extra for providing and mixing liquid integral water proofing material conforming to IS :2645 of the approved brand such as LATEX POWER/SUPER LATEX or equivalent at the rate of 300 ml./50Kg bag of cement or in proportion as recommended by the manufacturer in cement slurry, mortar, concrete as required and as directed by the Engineer in - charge. (Note: Integral liquid water proofing material shall be added in the water needed for preparation of cement slurry, mortar, concrete as required. ) |
| 41 | 12 mm cement plaster of mix : |
| 42 | 1:4 (1 cement: 4 fine sand) |
| 43 | 15 mm cement plaster on the rough side of single or half brick wall of mix : |
| 44 | 1:4 (1 cement: 4 fine sand) |
| 45 | Neat cement punning |
| 46 | Extra for plastering exterior walls of height more than 10 m from ground level for every additional height of 3 m or part thereof. |
| 47 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
| 48 | New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) |
| 49 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : |
| 50 | Two or more coats on new work. |
| 51 | Lettering with black Japan paint of approved brand and manufacture |
| 52 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 53 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-harge. |
| 54 | With cement mortar 1:4 (1 cement : 4 fine sand). |
| 55 | Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer, 3 mm thick water proofing membrane, black finished reinforced with glass fibre matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the samemembrane manufactured of density at 25°C, 0.87 - 0.89 kg/litre and viscocity 70 - 160 cps. Over the primer coat the layer of membrane shall be laid using butane torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : Joint strength in longitudinal and transverse direction at 23°C as 350/300 N/5 cm. Tear strength in longitudinal and transverse direction as 60/80N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane : |
| 56 | 3 mm thick |
| 57 | Erection of single layer bamboo-scaffolding made of average 75 mm dia bamboos with adequate bracing, ties, ropes etc. for strong, stable and workable scaffolding for specified jobs like repair to plasters, structural repairing, dismantling of steel structure etc all internal repairing works including dismantling the scaffolding after the job is done and clearing the site complete as per the direction of the Engineer-in-charge. [Only one time measurement of Scaffolding to be measured for payment in a particular area for all type of repairing work] |
| 58 | Removing of existing damaged APP / tarfelt & dispose the unserviceable material by mechanical means, including loading, transporting, unloading, stacking to approved municipal dumping ground or as approved by Engineer-in-charge including all lifts and lowering. |
| 59 | Melting the bitumen of the joints by blow lamp and taking out the extra bitumen or refill the same as required and cleaning of roof neatly by wire brush, broom, close chipping etc making loose dust free for applying priming coat all complete as per direction of Engineer in charge. |
| 60 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 61 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 62 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 63 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. |
| 64 | In cement mortar |
| 65 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. |
| 66 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 67 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 68 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. : Internal work - Exposed on wall |
| 69 | 20 mm nominal outer dia .Pipes. |
| 70 | 25 mm nominal outer dia .Pipes. |
| 71 | 40 mm nominal outer dia. Pipes. |
| 72 | Providing and fixing CPVC ball valve of approved colour & design of make Supreme or equivalent as per direction of Engineer-in-charge. |
| 73 | 40 mm dia |
| 74 | Taking out and refixing of the UPVC/CPVC water supply line with necessary cutting, jointing with adhesive and placing in a proper position all complete as per direction of Engineer-in-charge |
| 75 | Grading roof for water proofing treatment with |
| 76 | Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) |
| 77 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge |
| 78 | 50 mm average thickness |
| 79 | 25 mm average thickness |
| 80 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge. |
| 81 | Bars upto 12 mm diameter |
| 82 | Bars above 12 mm diameter |
| 83 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect. |
| 84 | SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer |
| 85 | Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2). |
| 86 | 25 mm average thickness in 2 layers. |
| 87 | Providing, mixing and applying SBR polymer (of approved make @ minimum 2% by wt. of cement used) modified plain/reinforced cement concrete for structural members having minimum characteristic compressive strength [with ordinary portland cement, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria] with specified average thickness. Note: Rates shall be for finished surface area of concrete and shall include the cost of labour, concrete and appropriate approved Super- Plasticiser for rendering concrete as flowable and SBR polymer but shall exclude cost of reinforcement, bond coat, Shear Keys, centering and shuttering, strutting, propping etc. (Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding/ tapping with a blunt metal instrument) |
| 88 | 50mm thick in Grade M 25 with cement content not less than 330 kg per cum |
| 89 | Providing, erecting, maintaining and removing temporary protective screens made out of specified fabric with all necessary fixing arrangement to ensure that it remains in position for the work duration as required by the Engineer-in-charge. |
| 90 | Wooven PVC cloth |
| 91 | Providing and fixing Scaffolding net of required width made of high density Polyethylene UV stabilized knitted on warp knitting machines having density 100grams/sqm and shading coefficient minimum 75% around the construction site/ for vertical extension as per requirement including fastening/tying with uilding/scaffolding pipes or with any other fixtures etc. complete as per direction of Engineer-in-Charge. (One time payment shall be made for providing Scaffolding net from start of work till completion of work including shifting if any. The Scaffolding net shall be the property of the contractor on completion of the work |
| 92 | Credit value for dismantled unserviceable materials |
| 93 | Reinforcement/Steel materials |
| 94 | Brick |