| 1 | Making Bandha with Diversion of Water ……….. Complete. |
| 2 | Dewatering form nala using pump set ………. Complete. |
| 3 | Dismantling reinforced cement concrete reinforced brick work including stacking of dismantled materials as directed by engineer-In-Charge within a distance of 60 meters (200 feet).. (PWD SOR 2022-23, Chepter-17, ItemNo.694 |
| 4 | Providing and layingcement concrete in 1:6:12 (1 cement : 6 coarse sand :12 graded stone aggregate 40mm nominal size) including supply of all materials, labour and T&P etc. required for completion of work and curing complete. including cost of form work in Foundation and floors.(PWD SOR 2022-23 Chapter No-05 Item No. 273 spec. No. 5.4.1 |
| 5 | Class-150 (Non Modular) brick work in 1:4 Cement and Finesand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (Fine sand not less than in 1.25 FM) (PWD SOR 2022-23 Chapter No-06 Item No. 6.1 A spec. No. 6.1.1 A) |
| 6 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)(PWD SOR 2022-23, Chepter-5,Item No. 5.1 ) |
| 7 | Reinforced cement concrete work in walls (any thickness),including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominalsize) up to plinth level |
| 8 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)(PWDSOR 2022-23 Chapter No-05 Item No. 5.1spec. No. 5.1.3) |
| 9 | Proving and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work.(PWD SOR 2022-23 Chapter No-05 Item No. 4.1 spec. No. 4.1.3) |
| 10 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (Sl No. 504) |
| 11 | M.SSpeciefication Board including painting & writing |
| 12 | P/F of Inogration Granite stone including writing and |
| 13 | Add 18 % G.S.T |