It is mandatory to submit rates for all items of pipeline repair work in the city in the financial year 2025-26. Rates should be submitted by including all taxes, diesel, petrol, transportation, repair, maintenance, transportation expenses, customs, toll tax, hydraulic fuel or other expenses. Apart from the presented rate, no other type of payment will be made by the body. Only GST will be paid separately at the prevailing rate at that time. Taxes will be deducted from the amount payable as per rules.; 1 Pipe line digging rate per meter2 1 meter wide, 1 meter deep, 1 meter long 3 inch3 1 meter wide, 1 meter deep, 1 meter long 4 inch4 1 meter wide, 1 meter deep, 1 meter long 6 inch5 1 meter wide, 1 meter deep, 1 meter long 8 inch6 1 meter wide, 1 meter deep, 1 meter long 10 inch7 PVC pipe line including pipe with fitting rate per meter8 1 meter wide, 1 meter deep, 1 meter long 3 inch9 1 meter wide, 1 meter deep, 1 meter long 4 inch10 1 meter wide, 1 meter deep, 1 meter long 6 inch11 1 meter wide, 1 meter deep, 1 meter long 8 inch12 1 meter wide, 1 meter deep, 1 meter long 10 inch13 PVC pipe Line digging and filling including gravel and CC rate per meter14 1 meter wide, 1 meter deep, 1 meter long, 3 inches15 1 meter wide, 1 meter deep, 1 meter long, 4 inches16 1 meter wide, 1 meter deep, 1 meter long, 6 inches17 1 meter wide, 1 meter deep, 1 meter long, 8 inches18 1 meter wide, 1 meter deep, 1 meter long, 10 inches19 PVC pipe line digging and filling including gravel and CC rate per meter20 1 meter wide, 1 meter deep, 1 meter long, 3 inches21 1 meter wide, 1 meter deep, 1 meter long, 4 inches22 1 meter wide, 1 meter deep, 1 meter long, 6 inches23 1 meter wide, 1 meter deep, 1 meter long, 8 inches24 1 meter wide, 1 meter deep, 1 meter long 10 inch25 HDPE pipe line with pipe with fitting rate per meter26 1 meter wide 1 meter deep, 1 meter long 3 inch27 1 meter wide 1 meter deep, 1 meter long 4 inch28 1 meter wide 1 meter deep, 1 meter long 6 inch29 1 meter wide 1 meter deep, 1 meter long 8 inch30 1 meter wide 1 meter deep, 1 meter long 10 inch31 HDPE Pipe line excavation and filling rate per meter including gravel32 1 meter wide 1 meter deep, 1 meter long 3 inch33 1 meter wide 1 meter deep, 1 meter long 4 inch34 1 meter wide 1 meter deep, 1 meter long 6 inch35 1 meter wide 1 meter deep, 1 meter long 8 inch36 1 meter wide 1 meter deep, 1 meter long 10 inch37 HDPE Pipe line excavation and filling including gravel and CC rate per meter38 1 meter wide, 1 meter deep, 1 meter long, 3 inches39 1 meter wide, 1 meter deep, 1 meter long, 4 inches40 1 meter wide, 1 meter deep, 1 meter long, 6 inches41 1 meter wide, 1 meter deep, 1 meter long, 8 inches42 1 meter wide, 1 meter deep, 1 meter long, 10 inches43 C.I. pipe line including pipe with fitting rate per meter44 1 meter wide, 1 meter deep, 1 meter long, 3 inches45 1 meter wide, 1 meter deep, 1 meter long, 4 inches46 1 meter wide, 1 meter deep, 1 meter long, 6 inches47 1 meter wide, 1 meter deep, 1 meter long, 8 inches48 1 meter wide, 1 meter deep, 1 meter long 10 inch49 C.I. pipe line rate per meter including excavation and filling of gravel50 1 meter wide 1 meter deep, 1 meter long 3 inch51 1 meter wide 1 meter deep, 1 meter long 4 inch52 1 meter wide 1 meter deep, 1 meter long 6 inch53 1 meter wide 1 meter deep, 1 meter long 8 inch54 1 meter wide 1 meter deep, 1 meter long 10 inch55 C.I. Pipe line excavation and filling including gravel and CC rate per meter56 1 meter wide, 1 meter deep, 1 meter long, 3 inches57 1 meter wide, 1 meter deep, 1 meter long, 4 inches58 1 meter wide, 1 meter deep, 1 meter long, 6 inches59 1 meter wide, 1 meter deep, 1 meter long, 8 inches60 1 meter wide, 1 meter deep, 1 meter long, 10 inches61 GI pipe line including pipe with fitting rate per meter62 1 meter wide, 1 meter deep, 1 meter long, 3 inches63 1 meter wide, 1 meter deep, 1 meter long, 4 inches64 1 meter wide, 1 meter deep, 1 meter long, 6 inches65 1 meter wide, 1 meter deep, 1 meter long, 8 inches66 1 meter wide, 1 meter deep, 1 meter long 10 inch67 G.I. Pipeline Excavation and Filling Rate per meter including gravel68 1 meter wide 1 meter deep, 1 meter long 3 inch69 1 meter wide 1 meter deep, 1 meter long 4 inch70 1 meter wide 1 meter deep, 1 meter long 6 inch71 1 meter wide 1 meter deep, 1 meter long 8 inch72 1 meter wide 1 meter deep, 1 meter long 10 inch73 G.I. Pipeline excavation and filling including gravel and CC rate per meter74 1 meter wide, 1 meter deep, 1 meter long, 3 inches75 1 meter wide, 1 meter deep, 1 meter long, 4 inches76 1 meter wide, 1 meter deep, 1 meter long, 6 inches77 1 meter wide, 1 meter deep, 1 meter long, 8 inches78 1 meter wide, 1 meter deep, 1 meter long, 10 inches