|
| 1 | Providing and supplyingHydracrane 08 to 15 MT capacityfor the prunning of trees,collection and transportation of scrap items,garden waste, from various location inside BARC Trombay, Mumbai as instructed by Engineer Incharge. (Refer technical specifications for terms & conditions .) |
| 2 | Providing, supplying \"JCB\" loader cum excavator including operator and helper executing the work like excavation, grading, levelling, debris cleaning and other works at various location inside BARC Trombay, Mumbai all as directed by Engineer Incharge as and when required.(Refer technical specifications for terms & conditions .) |
| 3 | Providing and supplying of Dumperfor the collection and transportation of scrap items,garden waste, debris, garbage at various location inside BARC Trombay, Mumbai as instructed by Engineer Incharge. (Refer technical specifications for Terms & Conditions .) |
| 4 | Supplying man power along with necessary pans, spades, shovels, punjas, ropes, small spacial spades, rain coats etc, minimum two labours per day and maximum any number of labour as and when decided by Project Engineer to work for eight hours per day to carryout the cleaning work, loading work etc as directed by Project Engineer. |
| 5 | Providing & supplying of Pick-up Van / Utility Van for various areas for the requirements arising from time to time inside and outside BARC. The Pick-up Van / Utility Van of five seaters capacity with the back side provision for transporting/ shifting of various horticulture maintenance materials, machinaries and tools etc. and for other works including Driver as assigned and directed by Engineer-in-Charge. (8Hrs. a day or 60 km max as per certification of Engineer-in-Charge).(Refer technical specifications for terms & conditions .) |
| 6 | Providing,supplying suitable Boom Lift of proper/required capacity for fixing/installation of Aluminium Louvers/MS Structural Framework including Operator and Helper complete as directed by the Engineer-in-Charge (1 day equal to working 8 hrs. Excluding all breaks).Boom lift should reach Height of Approx.27.00 m. (Refer technical specifications for terms & conditions .) |
| 7 | Providing safety Personnel Protective Equipments (PPEs) for engineers, supervisors and workers including transportation, delivery, storage in good condition ,maintaining issue records etc. as instructed by Engineer in-charge. |
| 8 | Safety Helmet as per IS 2925 : 1984 (Reaffirmed 2000) or EN 397 CE marked approved including helmet refill with sweat band, chin strap for carrying load on head in construction works with Cotton Head band Model (ISI and DGMS approved). |
| 9 | Safety jackets - reflective jacket with fluroscent colour( green, yellow, orange) ,made of 110 gsm 100% Cotton Fabric. |
| 10 | Safety shoe (pair)-as per IS:15298 Part 2 or EN 345 |
| 11 | Hand Gloves (pair)- with 2 Thread Poly-cotton premium quality cotton as per IS:4770–1991 (Reaffirmed 2001) |
| 12 | Supplying of Sign Danger/ safety/Caution Tape Roll of 100m Length. |