Supply Of Materials For Construction Of Nrml Shed In Housanur Village Tp Guledagudda. - Pvc Pipe Of 10Kg/Cum,90 Mm (Nrlmhousanur001),Rcc Cap 1000 Mm Dia, 100 Mm Thick (Nrlmhousanur001),Transportation Charges Of Materials Beyond 5 Km At 10 Percentage (Nrlmhousanur001),Labour Charges For Handingerrection Of Rcc Rings Etc. At 5 Percentage (Nrlmhousanur001),Fabrication Charges. (Nrlmhousanur001),Cost Of 6.5Mm M.S. Coil (Nrlmhousanur001),Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2 Percentage On Material (Nrlmhousanur001),A 100Mm S Or P Trap (Nrlmhousanur001),Indian Type Water Closet Of Size 580 Mm Of Specified Make With Footrests (Nrlmhousanur001),Handling Loading And Unloading 3 Percentage On Material (Nrlmhousanur001),Labour Charges For Lifting And Placing In Position And Making Connection At 7 Percentage On Material (Nrlmhousanur001),Polyenthylene Water Storage Tank Of Specified Capacity L (Nrlmhousanur001),Enamel Paint (Nrlmhousanur001),Add Brush, Putty, Sand Paper At 5 Percentage On Cost Of Paint (Nrlmhousanur001),Liquid Wood Filler (Nrlmhousanur001),Add Brush, Putty, Sand Paper At 2 Percentage On Cost Of Paint (Nrlmhousanur001),Water Proofing Cement Paint (Nrlmhousanur001),Add Brush, Putty, Sand Paper, Roller At 5Percentage On Cost Of Paint (Nrlmhousanur001),Plastic Emulsion Paint (Nrlmhousanur001),White Cement (Nrlmhousanur001),Ceramic Tiles 30 X 30 Cms (Nrlmhousanur001),Add Brush At 1Percentage On Cost Of Paint (Nrlmhousanur001),Enamel Metal Paint (Nrlmhousanur001),Painter Class I (Nrlmhousanur001),Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3 Percentage On Cost Of Paint (Nrlmhousanur001),Ready Mix Primer Paint (Ready Mix Red Lead Paint) (Nrlmhousanur001),Add Hom Of Welding And Grinding Machine At 4 Percentage On Material (Nrlmhousanur001),Welder Grade I (Nrlmhousanur001),Fitter Class I (Nrlmhousanur001),Ms Flat (Nrlmhousanur001),M.S Rods (Nrlmhousanur001),Unit Cost As Per The Specification (Nrlmhousanur001),Mathi/Nandi Wood Scantling (Nrlmhousanur001),Hom Of Machinaries For Planing (Nrlmhousanur001),Add Cutting And Other Wastage 5 Percentage (Nrlmhousanur001),Mathi/Nandi Wood Planks For Panels 25 Mm Thick (Nrlmhousanur001),Vitrified Tiles 600X600 Mm (Nrlmhousanur001),Add Providing And Removing Scaffolding At 3Percentage On Labour (Nrlmhousanur001),Solid Concrete Blocks (40X10x20 Cms)-4.00 N/Sqmm (Nrlmhousanur001),Add Handling , Loading And Unloading At 1Percentage On Material (Nrlmhousanur001),Solid Concrete Blocks (40 X 15 X 20 Cms)-4.00 N/Sqmm (Nrlmhousanur001),Jungle Wood Runners And Planks (Nrlmhousanur001),Casurina Poles 75 -100 Mm Dia (Nrlmhousanur001),Add Sundries Charges At 2 Percentage On Material (Nrlmhousanur001),Add Handling ,Loading And Unloading At 2Percentage On Material (Nrlmhousanur001),Casurina Poles 100 - 150 Mm (Nrlmhousanur001),Silver Oak Or Equivalent Planks 38 Mm Thick (Nrlmhousanur001),Add Watering Charges At 1 Percentage On Labour (Nrlmhousanur001),Add Sundries Charges At 1 Percentage On Labour (Nrlmhousanur001),Stone Chistler Class Ii (Nrlmhousanur001),Mason Class Ii (With Tools) (Nrlmhousanur001),Mason Class I (With Tools) (Nrlmhousanur001) H,Mixer (Concrete Small Used In Culvert) (Nrlmhousanur001),Boulders (Nrlmhousanur001) H,Bond Stone 20 X 20 X 45 Cm (Nrlmhousanur001),Size Stone 20 X 20 X 25 Cms (Nrlmhousanur001),Binding Wire (Nrlmhousanur001),Tmt Bars Fe 500 (Nrlmhousanur001),Hom Of Vibrator 0.71 Days (Nrlmhousanur001),Plasticizer / Super Plasticizer (Nrlmhousanur001),Granite/Trap Broken Metal 100 Mm And Downsize (Nrlmhousanur001),Add Watering Charges At 1 Percentage On Material(Nrlmhousanur001),Mixer (Concrete) - 1 Cum Capacity (Nrlmhousanur001),Portland Cement (Nrlmhousanur001),Coarse Sand (Zone Iii) (Nrlmhousanur001),Broken Stone Aggregate 12 Mm To 10 Mm Size (Nrlmhousanur001),Broken Stone Aggregate 20 Mm Size (Nrlmhousanur001),Broken Stone Aggregate 40 Mm Size (Nrlmhousanur001),Transportation/Loading And Unloading Of Material/Lifting Of Material Wastage/Unforeseen Charges/Miscellaneous Which Are Necessary During Execution.(Nrlmhousanur001),Add Sundries Charges At 1 % On Material (Nrlmhousanur001)