| 1 | Strengthening the Road fromGandhi Nagar Ist Street Road in Gundur Panchayat Km 0/0-0/250Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road landincluding uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. |
| 2 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A |
| 3 | Picking the existing BT Surface including all charges etc complete., |
| 4 | Construction of granular sub-base by providing close graded Material, mixing in a mechanicalmixplant at OMC, carriageof mixedMaterial toworksite, spreadingin uniformlayerswithmotorgraderonpreparedsurfaceandcompactingwithvibratory Soil Compactor to achieve the desired density, complete as per clause 401 |
| 5 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 6 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 7 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., |
| 8 | Providing and laying Bituminious concrete to 25/30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP etc., |
| 9 | Providing and Laying gravel soling to compacted thick including cost and conveyance of gravel from approved sources to works site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. |
| 10 | Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface including all charges etc complete., |
| 11 | Provision for Road Marker/ Road stud with lens Reflector including all charges etc complete., |
| 12 | Provision for HM Stone |
| 13 | Provision for Sign Board |
| 14 | Provision for Name Board cum Citizen Board etc., |
| 15 | Renewal BT to the Road fromAyyampatty to Anbalayam Road in Gundur Panchayat Km 0/0-0/520(R 573) Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road landincluding uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. |
| 16 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A |
| 17 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat |
| 18 | Providing and laying Bituminious concrete to 25/30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP etc., |
| 19 | Providing and Laying gravel soling to compacted thick including cost and conveyance of gravel from approved sources to works site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. |
| 20 | Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface including all charges etc complete., |
| 21 | Provision for Road Marker/ Road stud with lens Reflector including all charges etc complete., |
| 22 | Provision for HM Stone |
| 23 | Provision for Sign Board |
| 24 | Provision for Name Board cum Citizen Board etc., |
| 25 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |