| 1 | 1)Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. |
| 2 | 2)Supplying 80mm trap metalat the road side for metal including conveying an stacking etc. complete (50 meter intial lead (excluding royalty) by breaking boulders(hand broken)Add10%Hilly areaS.E.Circular No.1 R.A. |
| 3 | 3) Supplying 40mm trap metalat the road side for metal including conveying an stacking etc. complete (50 meter intial lead (excluding royalty) by breaking boulders(hand broken)Add10%Hilly areaS.E.Circular No.1 R.A. |
| 4 | 4)Supplying soft murum at the road site, including conveying and stacking complete. |
| 5 | 5) Spreading over size40/50/60/80mm laterite/trap metal including sectioning complete 55.00 Add10% |
| 6 | 6) Spreading hard murum/ soft murrum/ gravel or kankar for side width complete. |
| 7 | 7) Compacting the size metal(200 mm loose) layer 2.0 to 7.00 mtwidth with static roller, including necessary labour, materials including necessary labour, materials and artificial watering etc complete. |
| 8 | 8) Compacting the size metal(100 mm loose) layer 2.0 to 7.00 mtwidth with static roller, including necessary labour, materials including necessary labour, materials and artificial watering etc complete. |
| 9 | 9) Providing and constructing 50 mm. thick ModifiedPenetration Macadam (MPM)road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 100% crusher broken metal with conical crusher plantheating and spraying thebitumen of specified grade @ 1.75 kg/sqm, spreading 12mm.size chips compacting withstatic roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506etc. complete.Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) (Without tackcoat) |
| 10 | 10) Providing 20m thick premix bituminous carpet including supplying all materials, preparing and cleaning the base, heating bitumen applying tack coat at specified rate, Mixing hot bitumen and chips, laying the carpet layer and compacting etc comp. by bulk asphalt, (cold mix with prior approval) |
| 11 | 11) Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified gradepreparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 12 | 12)Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 450 mm diameter in proper line, level and slope etc. complete. |
| 13 | 14)Providing and fixing name board of size 1.00 metre x 1.08 metre of M.S. sheet and 25x25x6 mm M.S. angle including fixing in ground, painting and lettering etc. complete. |