| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 4 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 5 | Plaster on new surface on walls in cement sand mortar 1:4 including rackingofjointsetc. complete fine finish : 20mm thick . |
| 6 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, making of lines or groove etc complete but excluding the cost of nosing of steps etc. complete : 75mmthickwith20mmthicknominalsizeaggregate. |
| 7 | Providing and laying damp-proof course with cement concrete grade M-150 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification : 50mm thick. |
| 8 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 m lead With cement mortar 1 :4 ( 1 cement : 4 coarse sand) |
| 9 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: In cement mortar. |
| 10 | Finishing with neat cement (punning). |
| 11 | Construction of Open SurfaceDrain with 112mm thick brick masonry in CM 1:4,110mm thick base concrete 1:5:10, 37mm thick M-15 grade C.C. flooring ,12mm 1:4 cement plaster on all exposed faces of walls including top surface excavation & disposal of earth complete as per approved design/drawing: 250mm drain,300mm Av. depth |
| 12 | Carriage of Earth, Sand, Lime, Morrum manure or sludge, Building Rubbish etc. includingloading and unloading upto 5 km. lead inclusive of stacking if required |
| 13 | Providingandfixingrigid PVC pipe [IS:4985 mark] class II [4 Kg/cm2] appproved quality/make including jointing the pipe with solvent cement , rubber ring & lubricant, 110mm. dia. |