| 1 | Earth Work in cutting in ordinary soil including dressing and ramming of bottom and disposal of surplus excavated earthas directed by Engg.-In-Ch.SI no.253, pound |
| 2 | Oring, providing and installing bored cast-in-situ reinforced cement concrete piles 300 mmdia of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap). |
| 3 | Extra over item No.23.3 for providing additional bulb in under specified 400 mm dia(only qantity of extra bulb ar to be paid) |
| 4 | Earth Work Excavation for foundations in (silty,garbege, panni) soil including dressing and ramming of bottom and disposal of surplus excavated earthas directed by Engg.-In-Ch.SI NO 256, Wall, piller, boxing,drain |
| 5 | Providing and laying Cement concrete 1:4:8 mix (1 cement, f/sand, graded brick aggregate 40 mm) including supply of all materials. Labour and T&P etc.required for proper completion of the work .si 275,Wall, piller, boxing,drain,stair |
| 6 | M-150 class Brick work over base concreate in Cement Mortar 1:3 including all material, labour, T&P etc. complete in all respect. SI no.307, boxing, wall, drain |
| 7 | Pro & laying 25 mm thick D.P.C work is 1:2:4 cement, c/sand, s/grite with composil powder etc all completSI NO 361, room |
| 8 | Pro & Laying of C.C. work with 1:2:4 cement, coarse sand and 20 mm guage approved stone grite over drain etc all complet.si (279b) |
| 9 | R.C.C. work with cement approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:2:4 in for column footing excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and t & P etc. required for proper completion of the work. Binding wire cost being included in the item, shade pillerSI NO 288 |
| 10 | R.C.C. work with cement approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:1.5:3 in for columnexcluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and t & P etc. required for proper completion of the work. Binding wire cost being included in the item, shade pillerSI NO 287 |
| 11 | R.C.C. work with cement approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:2:4 in lighter beams excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and t & P etc. required for proper completion of the work. , Plinth beem SI NO 285, stair, wall |
| 12 | R.C.C. work with 1:2:4 cement, coarse sand and 20 mm guage approved stone grit to cover the crossing over drain etc all complet.SI NO.284, drain cover |
| 13 | M.S. Iron work for R.C.C. cover with cutting and bindining etc all complet.SI NO 604, raft, column, beam, salab, 12mmdia, 8 mm dia |
| 14 | Class-150 brick work in 1 : 3 cement and coarse sandmortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. S.I.309 b, Less:-Piller |
| 15 | 15 mm thick Plaster with 1:3 mix (cement& C/sand mortor)etc all complet . SI 583, drain, piller |
| 16 | Construction of Fobara with strucher,pump,electrification and other alied work etc all complet. |
| 17 | Mild steel or iron work of heavy size and sections such as trusses, built up gates, door frames etc.wrought to required shape as necessary for bending etc. including supply of steel and its wastage including cost of bolts, nuts if required, welding, grinding and making holes as required for completion of work, For Gate, gril angil fram, top of sitting roof |
| 18 | P/A of white cement based putty of average thickness 1 mm of approved brand and manufacture over plaster wall surface i/c supply of all material , labour and t&p etc.requiredfor proper completion. S.I NO 13.8, S.I. 13.8 |
| 19 | Finishing walls with water proof cement paint of approved make and quality on new work with three coats to give an even shade i/c supply of all material , labour and t&p etc.requiredfor proper completion of work. , S.I.13.47.1 |
| 20 | Painting 1st coat over priming coat on steelsuperior synthetic enamelto give an even shade and including cleaning the surface with one coat Priming coat withcost of all materials labour tools and plants etc. required for proper completion of the work. , SI NO 641+642 |
| 21 | S/L/R/C of G.S.B .stone grite with consolidation of dust and water etc all complet. |
| 22 | P/L 80 mm paver Interlocking tiels rabber molded including fine sand coussning and making camber in Road etc all complet. |
| 23 | P/Fixing in postion chain linked steel wire fabric made of 4 mm dia G.I.wire of requared with meshin ironpost asetc all complet.DSR 16.70.1 |
| 24 | outer wall |
| 25 | Head loading of material (30 m each chain)3 chain etc all complet |
| 26 | Disposal of earth up to 4.0 km distance loding and unloding charge including etc all complet. |
| 27 | Earth work levlling, dersing in making side slop arroung the pound with loding and unloding charge including etc all complet. |
| 28 | S/F of Submerseble Pump 1.5 H.P. with 110 mm dia boring with instalation of water storeg tank complet soler System fitting etc all complet |
| 29 | S/F of Modified steel/Rcc with marbal floor longBench with cartage and fixingetc all complet |