|
| 1 | Earth work in excavation for all type of road structure such as retaining walls ,breast walls, culverts, drains and parapets etcetera in all type of classification of soil comprising of ordinary soil . ordinaryrock, hard rock, chiseling/ wedging outof rock(where blasting is prohibited ) as per drawings and M.O.R.D technical specification clause 305-1 and as per direction of the Engineer-in- Charge including setting out, construction of shoring and bracing removal of stumps and other deleterious materials and disposal of materials upto any leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm(one hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water ( surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per the direction of the Engineer-in- Charge including carriage of materials within all leads and lifts and other incidentals. The rates are inclusive octroi , royality , Malkana, toll tax,GSTor other taxes imposed by the Government. |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form work forLintels, beams, plinthbeams, girders, bressumers and cantileversincluding entire carriage of material in all leads and lifts . Therates are inclusive of octroi, royalitymalkana ,toll tax, GST or other taxes imposed by the Government. |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work forSuspended floors, roofs, landings, balconies and access platformincluding entire carriage of material in all leads and lifts . Therates are inclusive of octroi, royalitymalkana ,toll tax, GST or other taxes imposed by the Government |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work forEdges of slabs and breaks in floors and walls under 20 cm (twenty centimetre) wide including entire carriage of material in all leads and lifts . Therates are inclusive of octroi, royalitymalkana ,toll tax, GSTor other taxes imposed by the Government. |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.including entire carriage of material in all leads and lifts . Therates are inclusive of octroi, royalitymalkana ,toll tax, GST or other taxes imposed by the Government. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:4:8 ( onecement : fourcoarse sand: Eight graded stoneaggregate) 40 mm (forty millimetre ) nominal size all work up to plinth leve including entire carriage of material in all leads and lifts . Therates are inclusive of octroi, royalitymalkana ,toll tax, GST or other taxes imposed by the Government. |
| 7 | Providingand laying mechanically mixed and vibrated cement concrete nominal mix1:3:6 (one cement :three Sand :six graded crushed stone aggregate 20mm (twenty millimetrenominal size)on ground or under water and curing completeincluding pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying underwater complete for all heights and depths including cost ofform workfor plain concrete in drain andchannel etc. open foundations complete as per drawing and technical specificationclause 802,803, 1202 &1203including carriage of material within all leads and lifts and other incidentals . The rates areinclusive octroi , royality , Malkana, toll tax, GST or other taxes imposed by the Government . |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth levelup to all floorlevel, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 ( one cement : one and halfcoarse sand : threegraded stone aggregate 20 mm(twenty millimetre)nominal size).In foundation footing bases of columns and the like and mass concrete including entire carriage of material in all leads and lifts . Therates are inclusive of octroi, royalitymalkana ,toll tax, GST or other taxes imposed by the Government . |
| 9 | Steel reinforcement for R.C.C. work made ofTata/Tiscon /Sailincluding straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more including entire carriage of material in all leads and lifts . Therates are inclusive of octroi, royalitymalkana ,toll tax, GSTor other taxes imposed by the Government. |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 (seven point five)inCement mortar 1:6 (one cement :six coarse sand)in foundation andplinth including entire carriage of material in all leads and lifts . Therates are inclusive of octroi, royalitymalkana ,toll tax, GST or other taxes imposed by the Government. |