Fume Hood Servicing including servicing, greasing and oiling of pulleys,checking all the electrical wirings and switches, repair the electrical problems, replacing of electrical defective accessories where ever is required. Checking of air flow dampers and tube lights, re aligning hinges, caliberating air flow, etc.
2
Replacement of damaged blower and motor, servicing including replacement of bearing and motor fan, housing and re fitting of blower fitting on the motor shaft, fixing of new blower with housing, if required, replacement of nut and bolts of motor and blower housing all complete as directed(blower and housing to be provided by the Institute)
3
Rewinding of burnt motor including dismantling and re assembling exhaust blower and housing after rewinding the motor with replacement of bearing and necessary nuts & bolts
4
Rewinding/ repair of water circultaing pump, ball bearing, minor repair of pump water, connection and operational working by providing and fixing the DP switch, mechanical seal assembly and pump impeller asembly (magnetic type) all complete
5
Repair of damaged/ loose ducting joints, drilling and re fixing with self threaded screws, fibre sheet coationg with adhessive, ovewrlapping including welding where ever is required
6
Scrubber tank cleaning and minor repair of water lines, scrubber tank, gasket replacement and required nut and bolts changing. Minor repair of FRP coatings.
7
Providing and fixing 10 mm dia SS 304 grade rope in Fume Hood by dismatling the old one, by cutting exhaust duct, dislocation of fume hood and repositioning of fume hood, clamping, etc
8
Providing and fixing pulley in Fume Hood by dismatling the old one. Each fume hood have 6-8 pulleys
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.