Supply And Installation Of Ms Frame With Chain Link Mesh And Front View Glass For Display Area Of Small Indian Civet Enclosure Inside Nandankanan Zoological Park , Supplying Mild Steel Work In Built Up Tubular (Round, Square Or Rectangular Hollow Tubes &Flat , Angleetc.) (Tata ) As Perapprovedquality Andspecified Includingallnecessarycost, Conveyance , Royaltiesofallmaterials . As Per Finalapproveddrawingbythedepartment . Instructionoftheengineer -Incharge. , Supplyingfittingsmaterials (M.S Baseplateand Anchorebolt,U Turns Buckleclampforstructureshedincludingallnecessarycost, Conveyance , Royalties Ofmaterials. Instructionoftheengineer -Incharge. , Hoisting, Fixingstructureshed , Joists Placing In Positionm.S Work Wrought And Put In Pole And Record Racksincludingallscaffoldingcomplete Etc.Instructionoftheengineerin - Charge . (Labour Only) , Chargesforbendingstructureworkdigitalbendingmachineofmspipe100mm Abovedia . Asperapproveddesigned Includingallcompleteinstructionof Theengineerin - Charge. , Supplying, Fittingandfixingofgalvanizedsteelcorewire(Tata)Ofsize20mmhotdippedgalvanized / Stainlesssteeltheexhibitareaasperapprovedquality, Specification Andincluding Cost Ofmaterials, Taxes, Labour, T&P Etc. Required For The Work All Complete Inallrespectas Per Direction Of The Engineer In Charge . , Painting Two Coats To Mildsteel Work With Approvedepoxycoatingof Approved Colour, Shade Over A Coat Ofprimerwithm.Sealputtyincluding Sand Papering, The Surface, Cost, Conveyances, Taxes Of All Materials And Cost Of All Labour,Labour Cess Withscaffolding T&P Etc, Complete As Per Specification & Direction Ofengineer-In-Charge. , Supplying&Fixing12mmthick.Toughenedbendglassfillingsilica Betweentwoglasspanelsincluding Fixingandinstallationfinalfittings Ofglasssupportclips, Screws Etc. Includingallmaterialsandlabourtaxes & Royalty, Transportationloading&Unloading , Aspercompleteinallrespect. Instructionbytheengineerin- Charge . , Supplyingandfixingofg.I.Chainlinkmesh (Tata)Ofsize ( 1 X1 X10 Gauge)To Cover Theexhibitareaincluding Cost Ofmaterials,Withlabour Cost , T&P Etc. Required For The Work All Complete Inallrespectas Per Direction Of The Engineer In Charge . , Painting Two Coats Over A Coat Of Primer With Approved Paint Oniron Work After Scrapping, Sand Papering The Surface And Cleaning With Surf And Soda Etc. With Cost, Conveyance, Taxes Of All Materials And Cost Of All Labour, T&P, Brushes, Workers Welfare Cess Etc. Complete As Per Approved Specification Anddirection Of The Engineer -In- Charge.