Name of Work: REJUVENATION OF DEVARAYANERI OORANI IN THIRUNEDUNGULAMPANCHAYAT in Thiruverumbur Block
Sl. No.
Item Description
1
REJUVENATION OF DEVARAYANERI OORANI IN THIRUNEDUNGULAMPANCHAYAT. Clearing the juliflora jungle without uprooting
2
Earth work in all soils except hard rock requiring blastingand conveying for formation of bund with lead of 0 to 100metre deploying earth moving machinery and tippersincluding benching, formation of bunds, breaking clods,sectioning etc., complete
3
Baby Pond- AS Per Sub Estimate Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
4
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
5
Cement Concrete 1:3:6 (One Cement, ThreeM.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, ThreeM.Sand and Six hard broken stone jelly).Dummy columns should be at least 1 metre height)
6
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
7
Provision for Name Board
8
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.