| 1 | Cleaningshrubjungles,uprootingstumpsandsmallbushesandtreesbelow1.00mtrgirthincluding costofall labour, T&P,sundries,labour cessetc complete and as per direction of Engineer-in-Charge. |
| 2 | Earth work in hard soil or gravelly soil within 50m intial lead & 1.50 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and including cost ofall labour, T & P, sundries and labour cess etc complete and as per direction of Engineer-in-Charge. |
| 3 | Fillingfoundation& plinthwith sand, well watered & rammed including cost,conveyance, royalty, T&P, sundries, lead, lift, delift and labour cessetccomplete and as per direction of Engineer-in-Charge. |
| 4 | Cement concrete (1:3:6) with 40mmsize HGCB metal including cost, conveyance, royalty,lead, lift, delift, all labour, T&P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 5 | RCC work of M-20 grade with20mm size and down gradeblackhardgranitecrusherbrokenstonechipsincludinghoistingandlaying including cost, coveyance, royalty,T&P, sundries, alllead,lift, delift, labour, labour cess and curing etccomplete and as per direction of Engineer-in-Charge. |
| 6 | Rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including cost ofallmaterials complete including all labour, T&P, sundries, lead,lift,delift andlabourcess etc completeand as per direction of Engineer-in-Charge. |
| 7 | RCC foundation, plinth bandand footing bases of cloumns , mass concrete and precast RCC slab etc |
| 8 | Supplying, fitting and placing uncoated HYSD bar TATA Tiscon Fe-500D/ SAILISI bar Reinforcement complete as per drawing and technical specification including cost, conveyance ,all labour, T&P , sundries, labour cessetc complete and as per direction of Engineer-in-Charge. |
| 9 | Dismantlingandremovingcementconcreteandremovingthedebriswithin50.00mtrlead includingcost, coveyance, royalty, T&P, sundries, alllead,lift, delift, labour, labour cess and curing etccompleteand as per direction of Engineer-in-Charge. |
| 10 | Disposalofbuildingrubbish / malba / similarunserviceable,dismantledorwastematerialsorexcavatedearthetcbymechanicalmeans,includingloading,transporting, unloadingtoapprovedmunicipaldumpinggroundor asapprovedbyEngineer-in-chargewithin5.00 Kmawayfromtheworksiteincludingcostofalllabour, conveyance , T&P,sundries, lead, lift, delift,labour cessetc complete and as per direction of Engineer-in-Charge. |
| 11 | Liftingofpre-castedR.C.Cslabsfromcastingyardto worksiteandlayingthesame in positionincludingcostofalllabour , T&P,sundries, lead, lift, delift& labour cessetc complete and as per direction of Engineer-in-Charge. |
| 12 | Cement concrete (1:2:4)for P.C.Cworks with 12mm size HGCB chips including cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess and curing etc completeand as per direction of Engineer-in-Charge. |