| 1 | CENTRALISED ITEMS:-11 KV CT-PT Pole Mounting Unit |
| 2 | 11 KV Electronic TVM Meter |
| 3 | 11 KV PPMC |
| 4 | 11 KV XLPE Cable 3X120 sq.mm |
| 5 | 11 KV XLPE Cable 3X70 sq.mm |
| 6 | I/D & O/D C/J Kits suitable for 3X70 sq mm XLPE CABLE |
| 7 | I/D & O/D C/J Kits suitable for 3X120 sq mm XLPE Cable |
| 8 | G.I. Pipe 6\" Dia |
| 9 | G.I. Pipe 4\" Dia |
| 10 | 11/0.4 KV 10 KVA Transformer |
| 11 | 11/0.4 KV 25 KVA Transformer |
| 12 | 11/0.4 KV 63 KVA Transformer |
| 13 | 11/0.4 KV 100 KVA Transformer |
| 14 | S.T Pole 11 mtr. long |
| 15 | PCC Pole 8.5 mtr. long |
| 16 | ACSR Weasel conductor |
| 17 | 11 KV Polymer Pin insulator with Pin |
| 18 | 11 KV Disc insultor with fitting 45KN (T&C Type) |
| 19 | 11 KV Dropper angle 100X50X2028 mm |
| 20 | 11 KV S/S Base Angle 75x75x6x2028 mm |
| 21 | 11 KV Top Channel 125x65x2040 mm |
| 22 | 11 KV V-Type Cross arm |
| 23 | Stay Set complete with 5 Kg wire |
| 24 | Earthing Complete 20x2500 mm 6 SWG |
| 25 | T-Off channel (125X65X1300) mm |
| 26 | Decentralised ItemsF-Bracket |
| 27 | Holding clamp with Nuts & Bolts |
| 28 | Al Lugs 70/150/240/400 sq mm |
| 29 | Nuts & Bolts of different sizes |
| 30 | TOP / TEE-OFFClamps |
| 31 | Grouting of Stay including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 32 | Cable Laying by HDD Method as per RESSPO standared. |
| 33 | Chemical earthing of Transformer (Body+Neutral) 60 Feet |
| 34 | Grouting of poles including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |