|
| 1 | Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq.ft. |
| 2 | Vimanam/Gopuram upto 15\"-00\" ht |
| 3 | Vimanam/ Gopuram upto 25\"-00\" ht |
| 4 | Vimanam/Gopuram upto 50-00\" ht |
| 5 | Providing Two legged Scaffolding using 15cm Dia blue Gum post or Best quality Bamboo / casurina post of 4m overall length (3m ht + 0.5m Projection +0.50m into the Ground), 3.50 -6.00m and 6.00 to 8.50 the Distance between the Two rows being 1.25m and the spacing of post being 2m ht both upto 18.00m ht etc., complete complying as per standard specification |
| 6 | Initial Height upto 3.50m |
| 7 | For height 3.50-6.00m |
| 8 | Labour charge for dismantling the existing damaged weathering course from the sannathi including removing all debris from the site of work etc., all complete complying with standard specification. |
| 9 | Labour charge for dismantling the existing damaged lime concrete from the sannathi including removing all debris from the site of work etc., all complete complying with standard specification. |
| 10 | Labour charge for removing the existing stone slabs, pavukkal, thoon and uthiram from the praharam including stacking it for later use etc., all complete complying with standard specification. |
| 11 | Cut stone slabs |
| 12 | Pavukkal |
| 13 | Thoon & Uthiram |
| 14 | Labour charge for removing the existing damaged Brick work from the Madapalli and removing all debris from the site of work inclusive cost and convayance charge etc., all complete complying with standard specification. |
| 15 | Brick masonry in lime mortar wall above 3m |
| 16 | Brick masonry in lime mortar wall upto 3m |
| 17 | Labour charge for removing the existing damaged cement flooring from the praharam and removing all debris from the site of work inclusive cost and convayance charge etc., all complete complying with standard specification. |
| 18 | Labour charge for removing the existing damaged plain cement concrete from the praharam and removing all debris from the site of work inclusive cost and convayance charge etc., all complete complying with standard specification. |
| 19 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. |
| 20 | Supplying and filling in foundation and basement with filling sand in layers of 150mm thickness well watered rammed and consolidated complying with relevant std specification including cost of supplying filling Sand. |
| 21 | Lime concrete 1:4:8 (one part of lime four part of sand and eight part of HBG jelly) for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc., complete in respects complying with relevant Std, Specification and as directed by the Dept, Officers. |
| 22 | Random Rubble masonry work in lime mortar 1:2 (one part of lime and two part of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respects complying with relevant standard Specifications. |
| 23 | Cleaning the stone surfaces by water washing the stone elements like wall, thoon, bothiyal and pavukkal etc., including cost of material and labour charges etc,. [DATA-M] |
| 24 | Labour charges for Pointing the Cut stone masonary work with lime mortar 1:1.5 (one part of lime and one point five part of sand) excluding cost of cut stone but including all labour charges, scaffolding etc.. complete with standard specifications. |
| 25 | Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With lime mortar 1:1.5 (one part of limet and one point five part of sand) etc all complete complying with standard specification. |
| 26 | Refixing the removed cut stone slabs, thoon, uthiram, bothiyal and pavukkal from the praharam exclusing cost of slab but including single line dressing etc., all complete complying with standard specification. |
| 27 | Cut stone slabs |
| 28 | Thoon, bothiyal, uthiuram & Pavukkal |
| 29 | Labour charge for removing the existing damaged lime plaster from the wall srfaces including removing all debris from the site of work. |
| 30 | Scrapping the decayed lime plaster from the surface of vimanam and gopuram, carefully including isolated bricks or brick work without damageding the vari vargams, racking out the joints cleaning the surface with water, including all working in height, hire charges for special tools, brushes complete superficial area including all folds-100sft. |
| 31 | Brick work in lime mortar 1:2 (one part of lime and two part of sand) using second class ground moulded Chamber bricks size 9\" x 43/8\" x 23/4\" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specification. |
| 32 | Brick arch work (flat, semi-cirvcular or segmental) in lime mortar 1:2 using second class ground moulded Chamber bricks size 9\" x 43/8\" x 23/4\" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specification. |
| 33 | Providing Vargapoochu over the corewalls of Vimanams/Gopurams, with lime mortar 1:1.5 (one part of lime and one point five part of sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with lime mortar 1:1.5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. |
| 34 | Vimanam/gopuram of ht. Up to 25\"0\" excluding Kalkaram |
| 35 | Vimanam/gopuram of ht. Up to 50\"0\" excluding Kalkaram |
| 36 | Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications. |
| 37 | Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 20mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications. |
| 38 | Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10sqm. |
| 39 | Supplying and fixing of Flush door shutter using Teak wood frame of size 127mm x 76mm and Door shutters Single leaf in position using 35mm thick solid core Flush shutters with teak play on both sides with teak wood lipping alround including cost and labour for fixing the hold fasts and furniture fittings etc., complete as directed by the departmental officers complying with standard specification. |
| 40 | Varnishing the new wood work with two coats of Varnish of good quality and color over one coat of primer over new wood work include costs of all materials, brushes charges etc, complete complying with standard specifications. |
| 41 | Supplying and fixing mild steel grill Gate including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications. |
| 42 | Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in all floor etc, complete complying with standard specifications. |
| 43 | Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications. |
| 44 | Finishing the top of roof with one course of machine pressed tiles 20cmx 20cmx20mm of approved quality laid in lime mortar 1:1.5 (one part of lime and one point five part of sand), 12mm thick mixed with water proofing compound 2percent by weight of cement used etc, complete with standard specifications. |
| 45 | Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in lime mortar 1:1.5 (one part of lime and one point five part of sand) finishing the same with lime mortar 1:1.5 bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing lime mortar 1:1.5 Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder) |
| 46 | Sudhai size above 1\"0\" up to 2\" 6\" |
| 47 | Sudhai size above 2\" 6\" up to 3\" 6\" |
| 48 | Sudhai size above 3\" 6\" up to 4\" 6\" |
| 49 | Sub total |
| 50 | GST |