}

Providing Cup Lock Scaffolding Inside The Boiler For Attending Overhaul Works Of Boiler Pressure Parts At Unit-7/Stage-Iv During Annual Overhaul Period 2025-26., NTR-Andhra Pradesh

Andhra Pradesh Power Generation Corporation Limited has published Providing Cup Lock Scaffolding Inside The Boiler For Attending Overhaul Works Of Boiler Pressure Parts At Unit-7/Stage-Iv During Annual Overhaul Period 2025-26.. Submission Date for this Tender is 14-05-2025. Scaffolding Tenders in NTR Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

48874110
Providing Cup Lock Scaffolding Inside The Boiler For Attending Overhaul Works Of Boiler Pressure Parts At Unit-7/Stage-Iv During Annual Overhaul Period 2025-26.
Tender
Indian
Andhra Pradesh
Ntr
14-05-2025

Tender Details

Providing Cup Lock Scaffolding Inside The Boiler For Attending Overhaul Works Of Boiler Pressure Parts At Unit-7/Stage-Iv During Annual Overhaul Period 2025-26.

Key Value

Document Fees
Refer document
Tender Value
INR 24.10 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail