|
| 1 | providing and laying 100 mm dia pipeline at joshiwada w no 13 |
| 2 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Lift 0 to 1.5 M (Bd-A-1/259) MJP SSR 2023-24 Pg No.37/1) |
| 3 | Excavation for foundation / pipe trenches inhard murum including removing theexcavated material upto road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Lift 0 to 1.5 M (Bd-A-2/259) MJP SSR 2023-24 Pg No. 37/2) |
| 4 | Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259). (Lift 0 to 1.5 M (Bd-A-5/259) MJP SSR 2023-24 Pg No.38/6) |
| 5 | Providing and laying in trenches 100 mm dia. heavy grade having embossed as ISI Mark galvanised iron pipes of 14.74 Kilogram/metre necessary fitting remaking good the demolished portion with filling trenches and with primer of anti-corrosive oil paint , 2 coats complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. (PWD SSR 2023-24 Pg No. 1487/43.16) [100 mm dia] |
| 6 | Providing erecting Cast Steel/ Spheroidal Graphite (S.G) Iron D/F Sluice Valves / Butterfly Valves with jointing to pipe work (including all hardware and packing) water works quality, having non-rising spindle with hand wheel and without bypass arrangement, spindle of stainless steel as per requirement, inspection charges, transportation upto departmental store, unloading, stacking, excluding GST levied by GOI & GOM in all respect etc. excluding C. C. foundation / structural steel support. For Rating Class 150 (Working Pressure 20 kg/cm2 and Test Pressure 30 kg/cm2) sluice valve. (MJP SSR 2023-24 Pg No. 152/11Aa ii) [100 mm dia] |
| 7 | Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.) (MJP SSR 2023-24 Pg No. 148/4 ivvi) [100 mm dia] |
| 8 | Supply of C. I. Mechanical Compression Flanged / Socket Tailpiece (Popularly known as I TMFlanged / Socket Tailpiece) suitable for making flanged connection with the plain barrel of C. I. Spun Pipes ( as per - IS - 1536 /2001) and D. I. Pipes ( as perIS: 8329 / 2000).The Tailpiec to be supplied complete with sealing rubber gasket of S.B.R, C.I. Follower Glands and M.S. Nut Bolts.The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS:1538 /1993. The rates are inclusive of cost of material, freight charges, loading, transportation and unloading at departemental store, excluding GST levied by Gol and GoM in all respect, etc. complete as directed. (MJP SSR 2023-24 Pg No. 161/1 ii iv) [100 mm dia] |
| 9 | Supply of C. I. Mechanical Compression Collar Coupling suitable forC. I. Spun Pipes ( as per - IS - 1536 /2001) and complete with sealing rubber gasket of SBR,.C.I. follower Glands and M.S. nut Bolts.The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS:1538 /1993. (MJP SSR 2023-24 Pg No. 161/2 ii iv) [100 mm dia] |
| 10 | Supply of C. I. Mechanical Joint Double Socket 900 (11/4’’) Bends as dimensionally described in Table-14 of IS-13382/ 1992 complete with sealing rubber gasket of SBR (dimensionally described in IS-12820/1989) with cast iron follower gland and mild steel nut bolts coated or otherwise protected from rusting and suitable for C. I. pipes. (MJP SSR 2023-24 Pg No. 161/3 iiiv) [100 mm dia] |
| 11 | Supply ofCI Mechanical joint Double Socket 450 (11/8’’) Bends as dimensionally described inTable -15 of IS - 13382/ 1992 complete with sealing rubber gasket of S.B.R. (dimensionally described in IS-12820/1989) with cast iron follower gland mild steel nut bolts coated or otherwise protected from rusting and suitable for C. I. pipes. (MJP SSR 2023-24Pg No.162/4 iiiv) [100 mm dia] |
| 12 | Supply of CI Mechanical joint All Socket Tees as dimensionally described in Table -18 of IS - 13382/1992 complete with sealing rubber gasket of S.B.R. (dimensionally described in IS- 12820/1989) with cast iron follower gland and mild steel nut bolts coated all otherwise protected from rusting & suitable for c.i. pipes (MJP SSR 2023-24Pg No.163/7) [200*200*100] |
| 13 | Making cross connection to existing distribution main of any type including excavation, breaking and removing existing pipes, lowering, laying of specials and pipes in their position, refilling, closing the water supply in that area, dewatering and restarting the water supply, etc. complete as directed by Engineer-in-charge for following diameters of existing pipeline, irrespective of diameter of branch line (the number of joints involved will be paid separately depending upon the nature of joints and required pipes, valves and specials will be supplied free of cost at stores). (MJP SSR 2023-24Pg No.58/10 v) [iii) 200 mm dia] |
| 14 | Cutting and champhering of pipes of following diameters including cost of all materials and labour involved, etc. complete as directed by Engineer-in-charge (for all class of pipes). (MJP SSR 2023-24Pg No.156/20 a ii) [100 mm dia] |
| 15 | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) Spec. No. - Bd E /1 Page. (MJP SSR 2023-24Pg No.47/1b) |
| 16 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. (MJP SSR 2023-24Pg No.40/15) |
| 17 | Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A-9/261) (MJP SSR 2023-24Pg No.45/14) |
| 18 | Carporation area 5% |
| 19 | GST 18% |