| 1 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. |
| 2 | Supplying to site empty cement polythene bags (capacity 50kg) in good conditionincludingstacking,incedentalchargesetc.allcomplete (capacity 50 kg). |
| 3 | Labour charges for filling empty cement gunny bag / polythene bag (capacity50kg)withallkindsofearth(wetordry),sandor agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. |
| 4 | Dumping in position earth / sand filled gunny / poly bags(capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 5 | Takingoutsluicegatedrawshuttergearing arrangements & pedestalincluding refittingthesamewith newnuts & bolts wherenecessary.(a) Up to 4 sqm.(i) Taking out and refitting the same. |
| 6 | Taking out Pedestal and refittingthe same with new nuts & bolts as necessary (nuts & bolts to be supplied by the contractor at his own cost) (a) Taking out and refitting the same. |
| 7 | Supplying, fitting, fixingMild Steel draw shutter with Mild Steel plate of thickness as specified by the Engineer-in-charge and other necessary Mild Steel sections for sluice including fabricating the same(as perdrawingandinstruction given by the Engineer- in-charge) excluding cost of Mild Steel guide channel, sill beam,gearing arrangement etc. but including painting with two coats of anticorrosive bituminous paint of approved make & brand over two coat of red lead primer and with necessary masonry work with all materials supply etc. completeatsite. |
| 8 | Supplying/ReplacingGunMetalBushforscrewgearing arrangementrequiredforhangingarrangementofdrawshutter andfitting & fixingwith the screwgearing arrangement for operating the draw shutter by taking out the old screwgearing arrangement andGun Metal bush etc. complete as per direction ofthe Engineer-in-charge.(The old materials to bereturned to Departmental Godown.) (a) 50 mm. dia |
| 9 | Brick work with 1st class bricks in cement mortar (1:4)(a) In foundation and plinth |
| 10 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mmnominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes |
| 11 | Reinforcement for reinforced concrete work in all sorts of structuresincluding distribution bars, stirrups, binders etc initial straightening andremoval of loose rust (if necessary), cutting to requisite length, hooking andbending to correct shape, placing in proper position and binding with 16gauge black annealed wire at every intersection, complete as per drawingand directiona) For works in foundation and upto roof of ground floor/upto 4 m(i) Tor steel/Mild SteelII. JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL |
| 12 | Hire and labour charges for shuttering with centering and necessary stagingupto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)a) 25 mm to 30 mm thick wooden shuttering as per decision & direction ofEngineer-In-Charge |
| 13 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](i) With 1:6 cement mortar(b) 20 mm thick plaster |
| 14 | Oiling,cleaning &greasingtheregulatorgate&gate parts includingguide channel, top runner, pedestal block, gear rods, wheel,fishplateetc.withsufficientlubricantasand when necessaryasdirectedby the Engineer-in-chargeincluding cost ofall materials to site complete. |