| 1 | Supply Of Material by the Contractor |
| 2 | Stone Pad 300x300x75 mm |
| 3 | Top Channel |
| 4 | Dropper Channel |
| 5 | M.S. TF Base angle 75x75x6x2028 mm |
| 6 | M.S. T-off Channel with clamp |
| 7 | Clamps with bolt & nut |
| 8 | Danger board with clamp |
| 9 | Barbed Wire |
| 10 | Nut, Bolt & washer |
| 11 | Number Plate |
| 12 | F-Bracket |
| 13 | E-Bracket with nut & Bolt |
| 14 | Aluminium Binding Wire |
| 15 | Red oxide Paint |
| 16 | Aluminium Paint |
| 17 | Cross Bracing of size 65x65x6 2700 mmLong with 4 Clamp |
| 18 | PG Clamp |
| 19 | I Hook |
| 20 | Suspension Clamp |
| 21 | Dead & Clamp |
| 22 | STP Pole/PCC Pole clamp with nut & bolt |
| 23 | Distribution Box |
| 24 | Clamp for Distribution box |
| 25 | LT Insulator piearcing clamp |
| 26 | LT Insulator piearcing connector |
| 27 | Guarding Angle |
| 28 | Guarding Angle clamp |
| 29 | GI Wire6 SWG |
| 30 | GI Wire8 SWG |
| 31 | Fuse Set |
| 32 | LT XPLE Cable 1x120 Sqmm |
| 33 | Safe Carriage of following/ any other material from Electricity Store Center Soron/Etah/Aligarh to pit site of work from the Kaccha & Pakka Road including loading & unloading at the respective ends including the cost of arrangement of labour, T&P etc. which required for Topper completion of work. |
| 34 | ACSR Weasel Conductor |
| 35 | ACSR Rabbit Conductor |
| 36 | ST Pole 11 Metre |
| 37 | P.C.C. Pole 8.5 Metre |
| 38 | Earthingcomplete |
| 39 | Stay Set Complete with concreating |
| 40 | 11 KV Disc Insulator |
| 41 | 11 KV Disc Fiffting |
| 42 | 11 KV Pin Insulator |
| 43 | 11 KV Pin with nut |
| 44 | 11 KV TPMO |
| 45 | 11 KV V Type Cross Arm with Clamp |
| 46 | Erection of Material |
| 47 | Erecetion/Installation of Fuse Set |
| 48 | Erection/Installation Of 11 KV TPMO |
| 49 | Erection of single support including complete H.T/L.T fittings S.T. Pole 11 Mtr. SP-55 including Earthing, Grouting & Muffing of pole. |
| 50 | Erection ofDouble support including complete H.T/L.T fittings S.T. Pole 11 Mtr. SP-55 including Earthing, Grouting & Muffing of pole. |
| 51 | Erection of Section Pole support including complete H.T/L.T fittings PCC Pole 8.5 Mtr. including Earthing, Grouting & Muffing of pole. |
| 52 | Erection of single support including complete H.T/L.T fittings PCC Pole 8.5 Mtr. including Earthing, Grouting & Muffing of pole. |
| 53 | Fixing Of Danger board with clamp |
| 54 | Erection of stay set complete including the work of nuzzling etc. |
| 55 | Laying sagging stringing, binding and jumpering ACSR Weasel onductor |
| 56 | Fixing ofBarbed Wire |
| 57 | Painting of ST Pole with red oxide & ailunimum paintas per RESPO norms |
| 58 | Laying sagging stringing, binding and jumpering ACSR Rabit conductor |
| 59 | Laying & fixing of G.I. Wire 06 SWG |
| 60 | Laying & fixing of G.I. Wire 08 SWG |
| 61 | Laying of1x120 Sqmm LT XLPE Cable in all respect. |
| 62 | Fixing of Guarding Angle with Clamp |
| 63 | Fixing of Dropper Channel |
| 64 | Fixing of Distribution Box in all respect. |
| 65 | Shifting of 25 KVA T/F |
| 66 | Shifting of 63 KVA T/F |
| 67 | Installation of Cross Bracing of size 65x65x6 2700 mmLong with 4 Clamp |
| 68 | Charges for Dismantling Work:- Work includes dismantling from recieved back material on site carriage and cartage of same materails from site/location tostore centre place as per instruction of JE/SDO/EE concerned. |
| 69 | ACSR Weasel Conductor |
| 70 | ST Pole 11 Metre |
| 71 | Iron Scrape |
| 72 | LT AB Cable Scrape |