| 1 | Providing FHTC from the existing CI/DI/uPVC/HDPE/GI/AC distribution pipeline by installing 10 mm NB Gun-metal Ferrule conforming to IS 2692:1989 with latest amendments on the said pipeline with supply, fitting & fixing of all other accessories like saddle piece of required size to fit the existing distribution pipe line, specials, nut & bolts, rubber sheet, washers etc and supply & laying of 15 mm NB PVC (schedule 80)/20 mm OD HDPE (PE100, PN16) pipe (average 15m length) with all necessary specials 1.0 metre below the ground connecting the ferrule including cutting trenches in all sorts of soil and filling up trenches as per direction of the Engineer- in Charge and upto a point just inside the premises of the household or as directed by EIC. Supply and installation of a 15mm dia. alloy iron Bib Cock (tested to 21 Kg/cm²) above 1.0 Mtr. from ground, an alloy Stop Cock of 15 mm dia. with brass spindle (tested to 21 Kg/cm²) to be fitted in a position as directed by E.I.C. G.I. pipe of TATA make (medium duly) of 2 metre length with all necessary specials to continue from the end of the HDPE/PVC pipe and upto 1.0 m above ground within the premises of household.Note:-1. PVC pipe shall of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with G.I. Pipes as per IS:1239 (Part-I)2.Payment of Supply & laying of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials 1.0 metre below the ground will be made on actual measurement basis. The rate of this item is Rs. 117/- per metre.3) Materials to be supplied as per approved vendor list of PHED.( Corrigendum no-2 WBPHED SChedule of RateJuly 2019 SOR of FHTC20/01/2022/O/oCEPWQM(DPHE) |
| 2 | a) Up to 10 m length |
| 3 | b) Above 10 m upto 20 m Length |
| 4 | Collection of house hold details at PRESCRIBED FORMAT THROUGH Mobile App and hard copy including Geo-reference as directed by E.I.C and submission of the same to P.H.E dte in soft copy . |
| 5 | Provision for extra supply and laying of 15 mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials 1.0 meter below the ground including cutting trenches in all sorts of soil and filling up trenches as per direction of the E.I.C., beyond 15mtr length as consider in item no.1 |
| 6 | Making villageroad(Average 3m width)crossing by horizontalAugor-boringfor accomodation of laying of avarage 3(three) nos15 mm dia. G.I. pipes for FHTC oras per direction of EIC. |
| 7 | Labour charges for horizontal auger boring including boring changes pipe laying & jointing making baricade lighting arrangement etc all complete as per direction of EIC for 80 mm dia to 200 mm dia. |
| 8 | Dismantling all type of plain cement concrete work stacking serviceable materials of site and removing rubbish as directed within a lead of 75 mtr for laying all dia pipe in ground floor upto 150 mm thick |
| 9 | Ordinary Cement Concrete(mix4 : 2 :1) with graded stone chips (20 mm. nominal size) excluding shuttering and reinforcement, if any, in ground floor, as per IS codes. |
| 10 | Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately)A) For Exposed Work(i) 15 mm dia. medium quality |
| 11 | Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick pavementwithout damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe , specials and valves including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVCfitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of . |
| 12 | N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii) No part payment at any stage on account of supply of materials shall be entertained. iv) Payment will be made on actual consumption of materials. v) UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list.vi) Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so.vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii) All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list.vi)Submission of completion drawing of pipe line showing all specials,valves, etc with final bill is mandatory.(Cost of drawing will be paid seperately).vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and deduction for such work will be made accordingly.viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. |
| 13 | (i) Laying of pipe line including cost of pipe & fittings /fitting but excluding cost of valves. |
| 14 | a) 90 mm O.D Dia |
| 15 | Construction of different dia Sluice valve /Air valve /Washout chamber indifferent sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in RCC cover slab with necessary opening for operation of valve all complete including cost of labour & materials as per Departmental Dwg. [Reinforcement type:- Other manufactuerers not specified] |
| 16 | i) 80 mm to 150 mm dia pipe |
| 17 | Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) with carried earth arranged by the contractor within radious 3km including cost carried. |
| 18 | Supply and delivery of CIDF sluice valve (Special type) PW-1.00 of different dia make with CI double flanged non rusting spindle sluice valves conforming to IS 14846 -2000 with latest emended having body dome/ bonnet and cover of C.I.Gr-F.G 210mtr. spindle of IS-6603 G.R12/Gr-13 non-magnetic, nuts seat rings are of Gunonetal as per IS:318 LTB-2 flanges and drilled to IS:1538 Part IV & VI valves are suitable for max. working pressure of 10kg/cm2(seat test) and body tested to 15kg/cm2.N.B: The above item should be procured from the reputed manufactures as per deptt. approvedvender list. |
| 19 | a) 100 mm dia |
| 20 | Making flange joint to DI/CI pipes, specials and valves where necessary with supply of required rubber insertion and nut bolts, washers etc. of approved quality and type all complete as per specification and direction of EIC (Nut and bolts shall be of TATA/GKW rate) |
| 21 | a) 100 mm dia |
| 22 | Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3 , if contractor used water from deptt. source). |
| 23 | a) 90 mm O.D Dia |
| 24 | Carriage of different type of departmental pipes from Divisional/Sub-divisional store to the work site by truck including loading, unloading, stacking etc. including cost of fuel, lubricant and also cost of driver, helper etc. and all other taxes and charges as applicable as per direction of EIC.a) Above 20 KM to 30 KM |
| 25 | Boundary Wall at HW & 2nd TW Site=165 M+72M |
| 26 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. |
| 27 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.a) with earth obtainedfrom excavation of foundation. 1/5 th of Vol. of excavated Earth. |
| 28 | Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work). |
| 29 | a)With carried earth arranged by the contractor within a radius of 3 km. Including cost of carried earth. |
| 30 | Filling in foundation or plinth by fine sand in layers not exceeding 150mm as directed and consolidating same by thorough saturation with water ramming complete. Including the cost of supply of sand.( Payment to bemade on measurment of finished quantity ) |
| 31 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. |
| 32 | Hire charges for shuttring with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beam, columns, lintles curved or straight including fitting, fixing and striking out after completion of works.(In all floors): a)25mm to 30mm thick wooden shuttering as per decision and direction of Engineer-In-Charge.a) 25mm to 30mm thick wooden shuttering without staging in foundation. |
| 33 | Ordinary Cement concrete (mix 1:2:4)with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement. If any, : Pakur Variety. |
| 34 | Ordinary cement concrete ( mix 1:1.5:3 ) with graded stone chips ( nominal 20 mm size) excluding shuttering and reinforcement. If any, : Pakur Variety. (Rate Analysis) |
| 35 | Reinforcement for reinforced work in all sorts of structures including distribution bars, stirrups, binders etc intial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every inersection, complete as per drawing and direction.(Rate Analysis).(i) JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL(a) For works in foundation, basement and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steeel.: For works in foundation, basement and upto roof of ground floor upto 4mtr. |
| 36 | (i) Tor Steel /Mild Steel Bars. II. JSW/JSPL/ SHYAM/SRMB/BMASL/ELECTROSTEEL/SSL Considering Steel required 1.20% of R.C.C work. |
| 37 | Brickwork with 1st class brick in Cement mortar 1:6.In foundation and plinth. |
| 38 | a) In foundation and Plinth : |
| 39 | 125 mm thick brickwork with 1st class bricks in cement mortar (4:1) : In ground floor |
| 40 | Plaster to wall, floor etc with sand and cement morter (1:6) including rounding off or champhering corners as directed and racking out joints or roughing of concrete surface including throating, nosing and drip course where necessary (In all floors). b)With 6:1 cement morter. (i) 20 mm thick plaster in Ground Floor. |
| 41 | b)With 6:1 cement morter.(i) 20 mm thick plaster in Ground Floor. |
| 42 | Neat cement punning in wall /dado, window sills, floor drains etc. in all floors about 1.5mm thick. |
| 43 | M.S. gate of Jail type as per approved design made of strong M.S. frame work, intermediate stiffeners and round / square bars or angles. M.S. sheet (not less than 14 gauge) gussets, cleats etc. including necessary riveting, bolting, welding, locking and hanging arrangements, fitting and fixing complete as per direction of the Engineer-in -charge.(A) In Ground floor. Weight considered 26 kg/ Sq.M |
| 44 | For jail type door including supply fitting and fixing in position complete as per approved drawing. |
| 45 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer\"s specification and as per direction of the EIC. In Ground Floor:a) One Coat. |
| 46 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer\"s specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.In Ground floor (Two Coat)a) Normal Acrylic Emulsion. |
| 47 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 48 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :With super gloss (hi-gloss): on steel or other metal surface.(a) With other than hi-gloss of approved quality- (i) Two coats (with any shade except white) |
| 49 | Approach Road |
| 50 | Box cutting or filling in Road embankment in all sorts of soil including spreading the soils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.: Depth up to 150 mm. |
| 51 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. |
| 52 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 53 | Hire charges for shuttring with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beam, columns, lintles curved or straight including fitting, fixing and striking out after completion of works.(In all floors): 25mm to 30mm thick wooden shuttering as per decision and direction of Engineer-In-Charge.a) 25mm to 30mm thick wooden shuttering without staging in foundation |
| 54 | Ordinary cement concrete ( mix 1:1.5:3 ) with graded stone chips ( nominal 20 mm size) excluding shuttering and reinforcement. If any, : Pakur Variety. (Rate Analysis) |
| 55 | Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work): With carried earth arranged by the contractor within a radius of 3 km. Including cost of carried earth. |
| 56 | Add GST 18.00 % |
| 57 | Add Labour Welfair Cess 1% |