| 1 | Dismantlingbrick work or stone work in lime or cement morter including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 50 meters . |
| 2 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 3 | Earth work in excavation in foundation in ordinary soil including 1.5 m lift and 30 m lead all labour T&P |
| 4 | Earth filing in ordinary soil including cartdge earth up 14 Km. |
| 5 | Supply & Laying of Base concrete in 1:5:10 cement : Coarse Sand : Stone Ballast 40mm including labour & material complete. |
| 6 | Providing & laying G.S.B.including supply of all material, labour T&P etc complete. |
| 7 | M150 class brick work in 1:4 cement and coarse sand in foundation including labour & material complete. |
| 8 | R.C.Cwork providing and laying in position specified grade of reinforcement concrete slab,including the cost of centring, shuttering, finishing but excluding reinforcement with 1:1.5:3 cement : coarse sand : stone grit.. |
| 9 | Brick work in 230 mm thick wall in superstructure with 1:4 cement : coarse sand mortar.wall, coloumn |
| 10 | Cement concreteWork in 1:1.5:3 with Cement, C/Sand & 20mm gauge stone grite including supply of all labour & material completion ofthework. |
| 11 | 15 mm cement plaster at wall with cement mortar (1:4) cement and coarse sand of single coat or internal plastering up to floor level to slab level wall plaster |
| 12 | Finishing of wall with putty approved brand and manufacturing brand and req shade on undecorate wall ,including curing and cost of all material.inside, 15mm, plaster qty.same as item no.7 |
| 13 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 14 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture |
| 15 | Mild steel or iron work of small sizes and secctions such as holding down bolts \"hold fast, tierods , grating etc . Wrought to requred from including supply of steel and its wastage i/c cost of bolts , nuts if requred for and welding, grinding and making holes as required completion of work fabrication of holes doors ,chaukhat nosingM.S. grill & gate |
| 16 | Suppy and fixingCement Bench including all labour , material T& P etc. complete. |
| 17 | Providing& laying \"I\" Shaped precast interlocking tiles of thickness 80mm (Rubber Molded) including 25mm thick local sand base levelling and dressing of surface to required level and slope ,filling joints with local sand all complete work. |
| 18 | P/F sign board |