| 1 | Carriage of material by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish: Lead 1 KM. |
| 2 | Earth workinexcavationbymechanicalmeans(Hydraulic excavator)/manualmeansinfoundationtrenchesordrains(not exceeding 1.5 m in width or 10sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out theexcavatedsoilanddisposalofsurplusexcavatedsoilas directed, within a lead of 50 m All kinds of soil. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6(1Cement:3coarsesand:6gradedstone aggregate 20 mm nominal size). |
| 5 | REINFORCED CEMENT CONCRETE WORK IN RAFTS, FOOTING, BASES OF COLOUMNS ETC AND MASS CONCRETE EXCLUDING COST OF CENTERING, SHUTTERING AND REINFORCEMENT ALL WORK UPTO PLINTH LEVEL 1:2:4 ( 1 CEMENT :2 COARSE SAND :4 GRADED STONE AGGREGATE 20 MM NOMINAL SIZE. (CEMENT TO BE ISSUED FREE OF COST BY COMPANY). |
| 6 | Centeringandshutteringincludingstrutting,proppingetc.and removal of form for : Foundations,footings,basesofcolumns,etc.for mass concrete. |
| 7 | Centeringandshutteringincludingstrutting,proppingetc.and removal of form for : Walls(anythickness)includingattachedpilasters, buttresses, plinth and string courses etc. |
| 8 | CENTERING AND SHUTTERING INCLUDING STRUTTING, PROPPING ETC. AND REMOVAL OF FORM WORK FOR: COLUMNS, PILLARS, PIERS, ABUTMENTS, POSTS AND STRUTS |
| 9 | ENCASING ROLLED STEEL SECTIONS, IN BEAMS AND COLUMNS, WITH CEMENT CONCRETE 1:2:4 ( 1 CEMENT : 2 COARSE SAND : 4STONE AGGREGATE 12.5 MM NOMINAL SIZE) INCLUDING CENTERING AND SHUTTERING COMPLETE BUT EXCLUDING COST OF REINFORCEMENT. |
| 10 | ReinforcementforR.C.C. workincludingstraightening,cutting, bending, placing in position and binding all complete. Cold twisted bars |
| 11 | BrickworkwithF.P.S.bricksofclassdesignation75in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 12 | BrickworkwithF.P.S.bricksofclassdesignation75in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 13 | Half brick masonry with F.P.S. bricks of class designation 75 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand) |
| 14 | Randomrubblemasonrywithhard stone in foundationand plinthincludinglevelling up withcementconcrete1:6:12(1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 15 | Cement concrete flooring1:2:4 (1 cement : 2 coarse sand :4graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete.40mm thick with 20mm nominal size stone aggregate. |
| 16 | PROVIDINGAND FIXING GLASSSTRIPS INJOINTSOFTERRAZO/CEMENTCONCRETE FLOORS.40 MM WIDE AND 4 MM THICK |
| 17 | 12 mm cement plaster of mix: 1:6 (1 cement: 6 fine sand) |
| 18 | 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) |
| 19 | Demolishingcementconcretemanually/bymechanicalmeans including disposal of material within 50 meters lead as per direction of Engineer - in - charge.1:3:6 or richer mix |
| 20 | Demolishing R.C.C.work manually/bymechanicalmeansincluding stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer - in- charge. |
| 21 | Demolishingbrickworkmanually/bymechanicalmeansincluding stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. In cement mortar |
| 22 | Demolishingstonerubblemasonrymanually/bymechanicalmeans including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar |
| 23 | Dismantlingoldplasterorskirtingrakingoutjointsandcleaningthe surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. |