| 1 | RTWHS TANKA-जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. GKN-BSR-Jaswantpura-2024 Item No. #196B) |
| 2 | Add Extra on item 1.1 for lift more than 3 m. WRD BSR 2023 Ch v/11 |
| 3 | lhesUV dkaØhV uhao ;k Q\"kZ esa 40 fe- eh- ukeh; eki dh iRFkj fxÍh] lhesUV & jsr elkyk esa 1 lhesUV % 5 jsr % 10 fxÍh vuqikr eas feykdj Mkyuk rFkk dqVkbZ djuk] rjkbZ lesrA GKN-BSR-Jaswantpura-2024 Item No. 9A |
| 4 | lsaVfjx ,o \"kVfjx ¼ r[rk ,oa |
| 5 | सीमेंट कंक्रीट 1 सीमेंट : 3 बजरी : 6 पत्थर एग्रीगेट अनुपात में 20 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । GKN-BSR-Jaswantpura-2024 Item No. 170B |
| 6 | नींव तथा कुर्सी प्रथम श्रेणी ईंट की चिनाई सीमेन्ट -बजरी 1:6 मसाले में, मय बगल की झिरी बन्द करने तथा तराई सहित। GKN-BSR-Jaswantpura 2024 Item No. 20A |
| 7 | iRFkj ds fljny ¼fyVay½ dh vkiwfrZ dj] 1%4 lhesUV ctjh elkys es yxkukA100 ls 150 feeh eksVkbZ GKN-BSR-Jaswantpura-2024- Item No. 36B |
| 8 | Vkadks ds Åij ifV~V;ksa dh Nr Mkyuk] lhesaV elkyk 1%4 ls tksM+ Hkjuk dk;Z laiwfrZ lfgr] iw.kZ dk;Z 1.5 m to 2.4 m span - GKN-BSR-Jaswantpura-2024 Item No. 45B |
| 9 | Vkads ds Nr esa 50 eh- eh- eksVkbZ esa lhesaV dadzhV 1%2%4 feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZaV dh 12 eh- eh- eki dh fxV`Vh ds lkFk feykdj Mkyuk] dwVuk] nckuk rFkk rjkbZ vkfn lesrA GKN-BSR-Jaswantpura-2024 Item No. 14A |
| 10 | सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित ।GKN-BSR-Jaswantpura-2024 Item No. 16 |
| 11 | सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु) GKN-BSR-Jaswantpura-2024 Item No 76A |
| 12 | सीमेंट प्लास्टर दीवार पर 1:6 अनुपात में सीमेंट-बजरी मिलाकर जोड़ों को कुरेदने तथा 14 दिन तक नियमित तराईसमेत। 20 मिमी GKN-BSR-Jaswantpura-2024 Item No 77B |
| 13 | टांका ढक्कन2 ft X 2 Ft (Market Rate) |
| 14 | 110 मिमी व्यास के पी.वी.सी. पाईप का डालना मय अन्य आवश्यक सामग्री सहित l GKN-BSR-Jaswantpura-2024 Item No. 181 |
| 15 | लोहे की जाली (ग्रेटिंग) 125 मिमी व्यास की आपूर्ति करना तथा लगाना। GKN-BSR-Jaswantpura-2024 Item - 182 |
| 16 | इनामिल पेन्ट का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना। . GKN-BSR-2024-Jaswantpura-Item - #82A नये कार्य पर। |
| 17 | Lettering with black Japan paint of approved brand and manufacture. PWD BSR 2022 Item 12.62 |
| 18 | Pakka Check Dam-Jungle Clearance 30cm scrub removal.RDPR BSR-2024/IT-192 |
| 19 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. WDR BSR-2023 1B/CH-5 |
| 20 | Cement concrece (1:4:8) well mixed & laid in position complete including curing and finishing etc. Complete.RDPR BSR-2024/IT-170A |
| 21 | Stone kharanja in cement mortar (1:6) including curing etc. complete. RDPR BSR-2024/IT-149B |
| 22 | R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for foundation. RDPR BSR-2024/IT-166A |
| 23 | R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for superstructure.RDPR BSR-2024/IT-166A |
| 24 | Cement concrete(1:2:4) well mixed and laid in position complete including curing and finishing.RDPR BSR-2024/IT-13A |
| 25 | 25MM thick cement plaster in cement sand mortar (1:4) including racking of joints smooth finishing and curing of etc. Complete RDPR BSR-2024/IT-76A |
| 26 | Earth backfill by murrum/black cotton soil I/c loading, unloading and lead of 3 Km. WRD BSR-2023/ch-5-IT-13 |
| 27 | Dry stone pitching to D\S ofH.W.E. (L+R) RDPR BSR-2024/IT-167 |
| 28 | Tip Work at PCD head wall, RDPR BSR 2024/IT-79A |
| 29 | Earth Work in rough (borrow Area) excavation for embankments in hand soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clouds, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 90 % of standard Proctor\"s density with initial lift of 1.5 m (Excluding charges for Compaction and watering) including loading and un-loading wherever required complete in all respect , Less 10% CP & for 90% Standard Proctor Density. WRD BSR-2023/ch-5-IT-16A Deduct 17B |
| 30 | Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) Less 10% CP. wrd BSR-2023/ch-5-IT-18A |
| 31 | Watering of Earth including cost of carriage of water when souce of water is upto 1km Less 10% CP. wrd BSR-2023/ch-5-IT-28A |
| 32 | Applying enamel paint in 3 layers to give even shade To create an even surface on new/old work.Jaswantpura RDPR BSR 2024-Item - #82A |
| 33 | Lettering with black Japan paint of approved brand and manufacture. PWD BSR 2022 Item 12.62 (Including Less 10% Contractor profit.) |
| 34 | Mini Percolation Tank-Clearing of forest, including cutting of heavy bushes and plants up to 30 cm height. |
| 35 | Earth Work in rough (borrow Area) excavation for embankments in hand soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clouds, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 90 % of standard Proctor\"s density with initial lift of 1.5 m (Excluding charges for Compaction and watering) including loading and un-loading wherever required complete in all respect , Less 10% CP & for 90% Standard Proctor Density. WRD BSR-2023/ch-5-IT-16A Deduct 17B |
| 36 | Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) Less 10% CP. wrd BSR-2023/ch-5-IT-18A |
| 37 | Watering of Earth including cost of carriage of water when souce of water is upto 1km Less 10% CP. wrd BSR-2023/ch-5-IT-28A |
| 38 | Single stone pitching 15 to 30 cm thick with all lifting & supply Included. (GKN 2024-25item 167) |
| 39 | Display board with painting and Letttering |
| 40 | NADI Deepening/Desilting- Clearing of forest, including cutting of heavy bushes and plants up to 30 cm height. BSR RD & PR 2024-25 ItemNo. 192 |
| 41 | Earth Work in rough (borrow Area) excavation for embankments in hand soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clouds, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 90 % of standard Proctor\"s density with initial lift of 1.5 m (Excluding charges for Compaction and watering) including loading and un-loading wherever required complete in all respect , Less 10% CP & for 90% Standard Proctor Density. WRD BSR-2023/ch-5-IT-16A Deduct 17B |
| 42 | Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) Less 10% CP. wrd BSR-2023/ch-5-IT-18A |
| 43 | Watering of Earth including cost of carriage of water when souce of water is upto 1km Less 10% CP. wrd BSR-2023/ch-5-IT-28A |
| 44 | Single stone pitching 15 to 30 cm thick with all lifting & supply Included. (GKN 2024-25item 167) |
| 45 | Display board with painting and Letttering |
| 46 | Sub Surface barrier-Clearing of forest, including general cutting of vegetation and bushes. RDPR BSR 2024 Item 191 |
| 47 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Less 10% CP. WRD BSR 2023 CH V/1 A |
| 48 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Less 10% CP. WRD BSR 2023 CH V/1 B |
| 49 | Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required. Less 10% CP. WRD BSR 2023 Ch v/11 Lift 1 |
| 50 | Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required. Less 10% CP. WRD BSR 2023 Ch v/11 Lift 2 |
| 51 | Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required.Less 10% CP. WRD BSR 2023 ch v/13 |
| 52 | Supplying, laying& spreading of LDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete. Less 10% CP.WRD BSR 2023 ch ix/39 |
| 53 | Display Board With Paiting and Lettering |
| 54 | Farm Pond डागबेलिंग करना 5 सेमी. से 7.5 सेमी. गहराई तक GKN-BSR-2024-- Jaswantpura-Item- #6(ब) |
| 55 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य नरम मिट्टी ((in Hard Soil) GKN-BSR-2024-Jaswantpura-Item- #196(B) |
| 56 | 500 माइक्रान की hdpe जिओ मेम्ब्रेन BIS 15351/2015 शीट की आपूर्ति (जी एस टी सहित ) (उधानिकी विभाग के परिपत्र संख्या 39-134 दिनांक 20-04-2023) |
| 57 | Laying, welding and testing of 1mm HDPE Liner (WRD BSR 2023 CH-V Item No.44) Including Less 10% Contractor profit. |
| 58 | 150cm ऊंचाई की फेंसिंग लोहे का पोस्ट35X35X5mm के 3मी.दूरी से व 30cm जमीन में सीमेंट कंक्रीट 1:3:6(.30X.30X.60m) कोर्नर व प्रत्येक 10वां पोस्ट को 35X35X5mm लोहे के पोस्ट से सपोर्ट करना, साथ में 4 लाईनों में काला कांटेदारतार, 2 पोस्ट के बीच जीआई. स्टेपल तार से बांधना व फिट करना सहित | विश्लेषण27 मी. लम्बाई फेंसिंग तक के लिए,मिट्टी खुदाई कार्य सहित(कंक्रीट 0.54 घमी.) GKN-BSR-2024- Bhinmal-Item- #195(ब) |
| 59 | ग्रिल/गेट आदि में लौहे का कार्य जिसमें सपाट कोनिया, टी तथा नाळीदार (चेनल), को काटना, चढ़ाना तथा लगाना आदि। GKN-BSR-2024-Bhinmal-Item- #63 |
| 60 | इनामिल पेन्ट का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना। . GKN-BSR-2024-Bhinmal-Item - #82A नये कार्य पर। |
| 61 | Lettering with black Japan paint of approved brand and manufacture. PWD BSR 2022 Item 12.62 (Including Less 10% Contractor profit.) |
| 62 | Khadin - Jungle Clerance removal of Scrubs and rutsItem 191 |
| 63 | Earth Work in rough (borrow Area) excavation for embankments in hand soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clouds, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 90 % of standard Proctor\"s density with initial lift of 1.5 m (Excluding charges for Compaction and watering) including loading and un-loading wherever required complete in all respect , Less 10% CP & for 90% Standard Proctor Density WRD BSR-2023/ch-5-IT-16A Deduct 17B |
| 64 | Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) Less 10% CP WRD BSR-2023/ch-5-IT-18A |
| 65 | Watering of Earth including cost of carriage of water when souce of water is upto 1km Less 10% CP WRD BSR-2023/ch-5-IT-28A |
| 66 | ts-lh-ch- e\"khu VsªDVj e; Ldszij }kjk feV~Vh [kqnkbZ dk;Z] [kksnh gqbZ feV~Vh ds Mxyksa dks rksMus (Breaking of clods) ?kkl ,oa dadj iRFkj dks vyx djuk (Sorting of Grass &pebbles) ,oa c.M dk lsD\"ku ¼dkV {ks=Qy esa½ izksQkbZy la/kkfjr djuk e; p |
| 67 | lhesUV dkaØhV uhao ;k Q\"kZ esa 40 fe- eh- ukeh; eki dh iRFkj fxÍh] lhesUV & jsr elkyk esa 1 lhesUV % 5 jsr % 10 fxÍh vuqikr eas feykdj Mkyuk rFkk dqVkbZ djuk] rjkbZ lesrA GKN-BSR-Jaswantpura-2024 Item No. 9A |
| 68 | R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for foundation. RDPR BSR-2024/IT-166A |
| 69 | R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for superstructure.RDPR BSR-2024/IT-166A |
| 70 | Cement concrete(1:2:4) well mixed and laid in position complete including curing and finishing.RDPR BSR-2024/IT-13A |
| 71 | Cement plaster in cement mortor (1:4) 25 mm GKN Item 76 A |
| 72 | 15 to 30 cm dressed Single Stone for Pitching with All lead and Lift , with Supply GKN Item 167 |
| 73 | Sunken Pond Jungle Clerance removal of Scrubs and rutsGKN BSR 2024 Item 191 |
| 74 | डागबेलिंग करना 5 सेमी. से 7.5 सेमी. गहराई तक GKN-BSR-2024-- Jaswantpura-Item- #6(ब) |
| 75 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य नरम मिट्टी ((in Hard Soil) GKN-BSR-2024-Jaswantpura-Item- #196(B) |
| 76 | Display board with painting and Letttering |