| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish at any lead outside the periphery of the area cleared. (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 2 | Trimmimg of tree branches of clearance 2.5m eithersidefrom the center of existing canal for movement of boat upto Lighthouse and removal of rubbish at any lead outside the periphery of the area cleared. (Along the stream channel sides towards Lighthouse) (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 3 | Dismantling & Repairs |
| 4 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground at any lead. (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 5 | Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement. 12 mm cement plaster (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 6 | Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers. (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 7 | Demolision/dismantling |
| 8 | Demolishing cement concrete manually/ by mechanical means including disposal of material at all lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 9 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material at all lead as per direction of Engineer-in-charge.In cement mortar (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 10 | Demolishing mud phaska in terracing and disposal of material at all lead. (This item includes removal of mud/soil, stones, CC blocks & loose materials etc.).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 11 | Re-use of debris/CC blocks |
| 12 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 13 | Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured): In cement mortar. (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 14 | Reusing of existing CC blocks laying into the jetty road as per directed places and direction of engineer in charge. The charges it includes of all labor, tools & plants, transportation, lead & lift and other charges etc. (No extra payment for CC Blocks).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 15 | Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete (300mm dia, 40mm thick). (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 16 | Item Deleted |
| 17 | Repairs of Jetty RoadEarth work in excavation by mechanical means (Hydraulic excavator) / MANUAL MEANS in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, at all lead. All kinds of soil. (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 18 | Supplying and stacking at site. |
| 19 | Supplying and stacking of hard stone (for stone pitching) 22.5 cm thick at site.(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 20 | Supplying and stacking at site. 90 mm to 45 mm size stone aggregate.(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 21 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity OR by equivalent manual arrangement in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density (This item is inside filling below top slab).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 22 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift upto1.5 m. All kinds of soil. (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 23 | Providing and laying of concrete works |
| 24 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 25 | Providing and fixing up to floor five level factory made precast cement concrete solid block including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete : 1:1½:3 (1 Cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) OR M-30 Grade with min cement content of 350 Kg/M3 with admixtures. (Precast CC solid blocks as per required sizes). (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 26 | Providing, transporting, hoisting and fixing above plinth level up to floor five level factory made precast reinforced cement concrete in slabs, including setting in cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering and finishing with neat cement punning on exposed surfaces but, excluding the cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone- III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources ). Extra for providing and mixing water proofing material in cement plaster/RCC work in proportion recommended by the manufacturers OR M-30 Grade with min cement content of 350 Kg/M3 with admixtures - The precast slabs shall be of size 1.20m x 0.60m x 0.10m (as per instruction of Engineer I/C) and factory made. (The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 27 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 28 | Centering and shuttering including strutting, propping etc. and removal of form work for : |
| 29 | Foundations, footings, bases for columns.(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 30 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (At damaged portions of jetty Road).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 31 | Extra rates for quantities of works, executed in or under water and/or liquid mud, including pumping out water as required extra due to slow progress and De-watering: 20% of the rate of the item (per \"M\" Depth) (20% rate of the item. The extra % in rate is applicable in respect of each item but limited to quantities of work executed in difficult condition.)Note :- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these difficult conditions. The unit, namely, metre depth, to be considered for payment, shall be the depth measured from the sub soil water level up to the centre of gravity of the qty executed in difficult conditions. The depth shall be reckoned correct to 0.10 m, 0.05 m or more shall be taken as0.10 m and less than 0.05 m ignored. |
| 32 | For earthwork excavation (Rate From Item No.8).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 33 | Extra for laying stone/brick/Cement Concrete work in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc., complete. (NOTE:-The quantity will be calculated by multiplying the depth measured from sub-soil water level upto the centre of gravity of stone work under sub-water with the quantity of stone/brick/Cement Concrete work in cum executed under the sub-soil water. The depth of centre of gravity shall be reckoned correct to 0.1m 0.05m or more shall be taken as 0.1m and less than 0.05m ignored). |
| 34 | For Dewatering for dry stone packing work in foundation and Stone masonry wall.(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 35 | Dewatering for cement concrete PCC or RCC work. (No extra payment shall be made for placing reinforcement or centering & shuttering under sub-soil water conditions.).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 36 | Filling of excavated earth |
| 37 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. (Back filling of excavated earth).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 38 | Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-Charge. ( Levelling of excavated earth).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 39 | Supplying and applying pre tested and approved water based concrete curing compound to concrete/ masonry surface, all as per manufacturer’s specification and direction of Engineer-in-charge. Non pigmented wet curing compound.(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 40 | Construction of Coffer Dam |
| 41 | Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2 mm in coffer dam, in required thickness, for all leads& lifts, all complete as per direction of Engineer -in-charge. (This item forsand bags for total coffer dam work including repetitional emptying & filling of sand bags are also considered and no extra payment will be made).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 42 | Providing,supplying Tapix Multipurpose Sand Bags • 14\" x 26\" • Lightweight and Compact • Quality Woven Polypropylene • Up to 1600 of UV Protection (Bundle of 100)all as directed and as per standard specifications and direction of engineer in-charge. The charges it including of all materials, labour, tools & plants, transportation, loading & unloading lead & lift etc. (This item for entire jetty roadforcoffer dam work and no extra payment will be made.).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 43 | Providing,supplying and laying of TUFFPAULIN 100FT X 100FT 200 GSM Black Pond Liner Super Heavy Duty Tarpaulin Tirpal Tadpatri Tharpai Thadika, Reinforced Eyelets, UV Resistant, Waterproof, 6 Layer MLCL 3D Rib Technology-1 No. all as directed and as per standard specifications and direction of engineer in-charge. The charges it including of all materials, labour, tools & plants, transportation, loading & unloading, lead & liftetc. (This item for entire jetty roadforcoffer dam work and no extra payment will be made.).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 44 | Shifting of sand bags,layingfor making another coffer dam all as directed and as per standard specifications and direction of engineer in-charge. The charges it including of all materials, labour, tools & plants, transportation, loading & unloading lead & Lift etc. (Shifting of sand bags one time will only considered for side by side culverts).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 45 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ±2%), Zinc+ 10% Al alloy+PVC coated, Mesh wire diameter 2.7/3.7mm (ID/OD),mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, all complete as per directions of Engineer- in charge. (Use Granite stones).(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |
| 46 | Cleaning of existing RCC drain pipes for removal of silty soil, required excavation at entrance &exit of RCC pipe for making clear flow of water during the high & Low tide of water. All as directed and as per standard specifications and direction of engineer in-charge.(The item rate is inclusive of boat charges for transportation of all construction materials, water, labour, tools & plants, genset and machineries considering all other hardships due to loading & unloading of men, material and machine, applicable taxes, GST etc.) |