|
| 1 | Dismantling of flexible Pavements (Bituminous Course with granular course) including disposal of dismantled material up to lead of 1000 mtr. as per direction of E/I including all labour & machineries. |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom including disposal of excavated material up to lead of 1000 M. as per direction of E/I. including all labour & machineries. |
| 3 | Plain/Reinforced Cement Concrete M-15 in Open Foundation Complete as per Drawing and Technical Specification below facia panels. including all labour, material (Cement, Aggregate etc.) machineries, T&P etc. complete as per MORTH Specifications and as per direction of E/I |
| 4 | Construction of RE Wall including Pre-casting (Concreting) transportation & erection of RCC facia panels and accessories including providing design & drawings of reinforced earth structures including RCC coping beam on top with all labour, material (Steel, Cement, Admixture, Aggregate, Geogrid, EPDM Pad, Galvanized Connecting bar with steel etc.) all Complete works as per approved design & drawings, MORTH Specifications and relevant codes as per direction of E/I. |
| 5 | Construction of Embankment between R.E. Wall panels with fly ash including spreading, levelling & compaction in layers to achieve 95% proctor density including cost of Labour, sprinking of water and machineries complete as per MORTH specifications and relative codes and as per direction of E/I. |
| 6 | Construction of PCC below friction slabof M-15 Grade. including all labour, material (Cement, Aggregate etc.) machineries, T&P etc. complete as per MORTH Specifications and as per direction of E/I |
| 7 | Construction of RCC friction slab & Coping Beam M-35 Grade, including precasting (concreting), transportation and erection with all labour including reinforcement work, machineries, T&P, Centering/shuttering etc. Complete as per MORTH Specifications and as per direction of E/I. |
| 8 | Providing & fixing of HYSD steel in Friction Slab (Sub Structure) including consumables complete as drawing & technical specifications and as per direction of E/I. |
| 9 | Construction ofCrash barrier- M-40 Grade including precasting (concreting), transportation and erection with all labour including reinforcement work, machineries, T&P, Centering/shuttering etc. Complete as per MORTH Specifications and as per direction of E/I. |
| 10 | Supplying & fixing of polymeric product geocomposite in between R.E. Wall & filling material in accordance with clause 704.2.1 & clause 702.2.1 MoRT&H Vth revision 2013 and other relevant codes including all complete works with all leads and lifts, manpower and machinery, materials, etc. as directed by Engineer - In - Charge. |
| 11 | Construction of Granular Sub-Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 |
| 12 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam 250mm thick specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per directions of E/I. |
| 13 | Providing and laying dense Graded Bituminous Macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. |
| 14 | Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects |
| 15 | Providing and applying Primer Coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.75 kg/sqm using mechanical means. |
| 16 | Providing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. |