| 1 | Earth work excavation for foundation with all leads and lifts in all soils and sub-soils and to the required depth as may be directed except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layers of 150mm thick well consolidated, depositing the surplus earth in places shown and levelling the site with all leads and lifts etc. complete in all respects.. |
| 2 | .Supplying and filling in foundation in basement with filling sand in layars of 150mm thickness well watered rammed and consolidated complying with relevant std specification including cost of supplying filling sand. |
| 3 | Cement concrete 1:5:10 (One of cement five of sand and ten of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete in respects complying with relevant St |
| 4 | Random Rubble masonry work in LM 1:5 ( One of Lime and five of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respectscomplying with relevant standard Specifications. |
| 5 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) |
| 6 | Centering up to grade beam |
| 7 | Centering for beams and slabs for up to 3m ht. |
| 8 | Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers.The coarse and fine aggregates to be used should comply with the requirements of IS Standards.(No separate payment will be made by the Department for the excess usage of materials). |
| 9 | sub structure |
| 10 | Super sructure |
| 11 | Supplying, fabricating and placing in position Mild steel or Ribbed tor steel in all size for all RCC works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specifications.(The contratctor will have to make his own arrangements for the supply of MS plain rod / RTS rod and binding wire) |
| 12 | Brick work in limeMortor 1:2 ( One Lime Two Sand ) using country brick of size 83/4\"x41/4\"x23/4\" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. |
| 13 | Plastering with Lime mortar 1:1.5, (One Lime and One and a half Sand) 12mm thick including cost and conveyance of all materials and all labour charges,curing etc,complete complying with standard specifications. |
| 14 | Brick masonary LM1:2 using Stock bricks including all varivargams, mould sthambams mokopathrams,koodu, Nasi and all ornamental brick work complete,all pancharams Agarais, Karanakoodu, etc., forming corewalls of Rajagopuram / Vimanamcomplete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to requiredheights, curing and all extra for working in heights etc., complete 100 cft for Kalkaram . |
| 15 | kalkaram |
| 16 | Vimanam / gopuram of ht. Up to 15\" excluding Kalkaram. |
| 17 | Vimanam / gopuram of ht. Up to 25\" excluding Kalkaram. |
| 18 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1:5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plasteringwith Lime Mortor1:1:5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area.for kalkaram. |
| 19 | kalkaram |
| 20 | Vimanam / gopuram of ht. Up to 15\" excluding Kalkaram. |
| 21 | Vimanam / gopuram of ht. Up to 25\" excluding Kalkaram. |
| 22 | Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curingin all floors including brushes etc., complete as per specification. -10 m 2 |
| 23 | Supply of cut stone for carrying out Garbagraham , Arthamandapam, Mahamandapam and other temple structure up to 10 feet length Side wall, Pavukkal , Uthiram and all hire charegs for all tools and plants and clearing the site after completeion of work etc., complete. |
| 24 | Labour charges for New cut stoneChithiravanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants including dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 25 | Labour charges for new cut stone padma jegathi athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plantsincluding dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 26 | Labour charges forold cut stone padma jegathi athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants including dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete. |
| 27 | Labour charges for new cut stone Kandam Ubabeedam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants including dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 28 | Labour charges for new cut stone Kabothagam Ubabeedam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants includingdressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete. |
| 29 | Labour charges for newcut stone padma jegathi athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants includingdressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 30 | labour charges for old cut stone padma jegathi athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plantsincludingdressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 31 | Labour charges for cut stone padma jegathi athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants includingdressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 32 | Labour charges for cut stone Kumatahagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants includingdressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 33 | Labour charges forcut stone Pattiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants includingdressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 34 | Labour charges forcut stoneAswapatham Stambam vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants includingdressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 35 | Labour charges forcut stoneVedhiyal vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants including dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 36 | Labour charges forcut stone Kalvari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants including dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 37 | Labour charges forold cut stone Kalvari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants including dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete. |
| 38 | Labour charges forcut stoneKudam palagai excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants including dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 39 | Labour charges for new cut stoneUthiram Kampu Eluthagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants including dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 40 | labour charges forold cut stoneUthiram Kampu Eluthagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants including dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 41 | Labour charges forcut stoneKabothagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants including dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 42 | labour charges for old cut stoneKabothagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 43 | Labour charges for new cut stone Vyalavari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 44 | Labour charges for cut stone Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete. |
| 45 | Labour charges for old cut stone Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 46 | Labour charges for cut stone Nilaikkal (Nagapantham Kodikarukku and Karukku) excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 47 | Labour charges for cut stone Nasi Thalai excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 48 | Painting with multicolour (Panchavarnam)good water based exterior emulson paints complete for the Vinamans/Gopurams, including costand conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc,complete-which including all extra for foldings-100sft, superficial area. |
| 49 | For Vimanam / gopuram of ht. Up to 15\" excluding Kalkaram |
| 50 | For Vimanam / gopuram of ht. Up to 25\" excluding Kalkaram |
| 51 | Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Mortor1:1:5 etc complete. |
| 52 | Inner Praharam |
| 53 | Outer Praharam |
| 54 | Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications up to 7 ft height |
| 55 | Varnishing new and old wood work two coats of approved quality in all floorsthe rate includescost of all materials, brushes, Scaffolding charges etc.. Complete |
| 56 | Scaffolding charges for Vimanans andgopurams with casurina posts coconut or plamtrees wherever necessaryfor main, form work and providing with Not flamable coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work1 sq,ft. |
| 57 | Vimanam /Gopuram upto 25\"-0\" Height |
| 58 | Vimanam /Gopuram upto 15\"-0\" Height |
| 59 | Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor 1:3 finishing the same with Lime Mortor 1:3 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder) |
| 60 | Sudhai size above1\" 0\" upto 2\" 6\" |
| 61 | Sudhai size above2\" 6\" upto 3\" 6\" |
| 62 | Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications. |
| 63 | Finishing the top of roof with one course of machine pressed tiles 23cmx 23cmx20mm of approved quality laid in ;LM 1:3,12mm thick mixed with water proofing compound 2% by weight of cement usedetc, complete with standard specifications. |
| 64 | Providing Water wash and appropriate methodology to restore the originalities of the existing Granite structures inclusive of necessary scaffolding charges, conveyance and all hire charegs for all tools and plants and clearing the site after completeion of work etc., complete. |
| 65 | Pointing the cut stone joints with Lime Mortor 1:1.5 20 mm deep using red and yellow oxide and including cost of special tiles such brush and watering, curing etc complete, as per standard specifications. |
| 66 | sub total |
| 67 | GST 18% |