| 1 | Earth work in excavation by manual means in trenches for foundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 3 | Centering and shuttering including strutting propping etc and removal of form work for : reatining walls return walls , walls (any thickness) including attached pilasters , buttresses , plinth and string course fillets , kerbs and steps etc. |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 6 | Providing and laying damp-proofCourse 50 mm thickwith cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 7 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 8 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.2 mm thick |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 10 | Steel work welded in built up sections / framed work , including cutting , hoisting , fixing in position and applying a priming coat of applied steel primer using structural steel etc as required . In gratings , frames guard bar , ladder , railings , brackets , gates and similar works. |
| 11 | Carriage of material by Mechanical Transport & Head Load including loading / unloading and stacking at site com |
| 12 | carraige of stone aggregate below 40mm 35 km by MT & 700 mtr head load |
| 13 | Sand for an avearge distance of 35 km by MT & 700 mtr head load |
| 14 | Stones for an avg distance of 240 km by MT & 700 MTR by head load |
| 15 | Bricks for an average distance of 240 km by MT |