| 1 | Part-ASub-Station Material (Provided by contractor) |
| 2 | 33 KV line Isolator 400Amp |
| 3 | Structure for 33 KV line Isolator |
| 4 | 33 KV Bus-Isolator 400 Amp. |
| 5 | 33 Kv Fuse Set (Copper strip for 33 KV Line |
| 6 | 33 Kv Fuse Set Structure |
| 7 | 33 KV Lightening Arrestor (3Nos. in a set) |
| 8 | Structure for 33 KV Lightening Arrestor |
| 9 | 33 KV PT |
| 10 | 33 KV PT Structure |
| 11 | 33 KV CT Structure |
| 12 | 90lb, Rail pieces for T/F for transformer (44.64 Kg /Mtr) |
| 13 | ACSR Dog Conductor. |
| 14 | P.G. clamp for Dog conductor. |
| 15 | 11 KV INC, Switch Gear ‘VCB’ CTR-600/ 300/5A, 350MVA |
| 16 | 11 KV O/G, Switch Gear ‘VCB’ CTR-200/ 100/5A, 350MVA |
| 17 | 11 Kv bus coupler |
| 18 | 11 KV Cable boxes (Including Indoor and Outdoor C/J Kit) |
| 19 | Cu. Control Cable 2x2.5 mm2 |
| 20 | Cu. Control cable 4x2.5 mm2 |
| 21 | LT Pannel/ LT A Pannel (02 No Incoming +04 Outgoing) |
| 22 | T/F 250 KVA Comp. |
| 23 | 11 KV T.P. M.O. Switch with fixing clamps |
| 24 | 11 KV D/Pole structure on as per Schedule-II |
| 25 | Paint fo S/S Structure & equipments |
| 26 | 33 KV Polymer disc insulator with fitting |
| 27 | Rubber Mat |
| 28 | 33 kv Polymer pin insulator |
| 29 | 11 KV Fuse set with fixing clamps. |
| 30 | 33 KV Top Channel 125x65x3200 mm |
| 31 | LT 3.5x400 sqmm cable |
| 32 | 33 KV ‘VCB’ with structure with Single T/F Control Pannel and C.T.R. 200/100/1A with C.T. |
| 33 | 33 KV CT 400/200/1A |
| 34 | 33 KV VCB For main line with structure |
| 35 | 33 KV Single feeder Control pannel |
| 36 | 24 Volt Battery with inverter & cabinet |
| 37 | LT 3.5x400 sqmm cable |
| 38 | 33 KV Metering Part Materials provided by contractor |
| 39 | 33 KV ‘XLPE’ Cable 3x300 mm² D/C (as per site requirement) |
| 40 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor |
| 41 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Indoor |
| 42 | 11 KV DP Material Materials provided by contractor |
| 43 | S.T. Pole 9 M long. |
| 44 | M.S Angle cross bracing |
| 45 | Top Channel 100x50x2240mm |
| 46 | Clamps with nut bolt |
| 47 | extra support angle for cable support |
| 48 | clamp for extra angle |
| 49 | Number Plate with clamps. |
| 50 | Danger Board with Clamps. |
| 51 | Barbed wire. |
| 52 | Allumunium Paint. |
| 53 | Bolts, Nuts, & Washers. |
| 54 | Red Oxide Paint. |
| 55 | Stay complete (with Stay clamp and stay wire) |
| 56 | Earthing complete |
| 57 | Part -B – WORKSub-Station and 11 KV DP (Erection, grouting of following fabricated structures) |
| 58 | 33 KV Isolator structure |
| 59 | 33 KV L.A. structure |
| 60 | 33 KV fuse set structure |
| 61 | 33 KV CT Structure |
| 62 | 33 KV PT Structure |
| 63 | 33 KV VCB Structure |
| 64 | Erection, mounting and fitting of equipment on erected structures |
| 65 | 33 KV Line isolator complete |
| 66 | 33 KV Bus isolator complete |
| 67 | 33 KV L.A. (3 Nos.L.A. Per set) |
| 68 | 33 KV fuse set complete |
| 69 | 33 KV PT |
| 70 | 33 KV VCB |
| 71 | 33 KV CT |
| 72 | Construction of power transformer plinth for 05 MVA transformer of size 3.5 x 3.5 x 0.5 mtr or as per site requirement. including cost of all material as per requirement. |
| 73 | Transformer body earthing at two places including cost of G.I. strip, G.I. pipe and other earthing materials required. (delta type) |
| 74 | Laying of 11 KV “XLPE” cable 3 x 70/185/300 mm2 including digging of pits of size 0.5 x 0.5 mtr. covering of cable with sand and 1st class bricks around and top of the cable or laying in cable trench and covering with brick and sand as per site requirement. |
| 75 | Providing and rising of cable with GI Pipe 50mm dia 3mtr long for cable safety. |
| 76 | Providing and erection of Special pipe earthing for cable protection. |
| 77 | Neutral earthing of 5 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 30’ long and other earthing materials. (delta type) |
| 78 | Providing & grouting of Neutral stand with clamp. |
| 79 | Writing name on S/S Building 11 KV Switchgear panels & all equipments insatalled in control room & switchyard. |
| 80 | Providing & Grouting of cable stand and fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of jumpers. |
| 81 | Dismantling of old existing T/F and indoor equipment |
| 82 | Jointing charges of 11 KV “XLPE” C/J kit 3 x185/300 mm2 indoor/outdoor. |
| 83 | Installation and connection of 250KVA T/F with accessories |
| 84 | Erection & grouting of ST pole 11 m for making D/P to rising of cable with complete work and related fitting provided by contractor. |
| 85 | Providing and fixing of TPMO and Fuse set for 11 KV D/P. |
| 86 | Laying from switchyard to control room for 33 KV panel, CT, VCB, 5 MVA t/F by digging trench and making connection complete. (As per site requirement laying of cable though cable trench if available with covering brick and sand. |
| 87 | 2 x 2.5 mm2 |
| 88 | 4 x 2.5 mm2 |
| 89 | Providing and Installation of Outdor Earthing for including both T/F (Eartmat, Delta) as per UPPCL Norms. |
| 90 | Providing and Installation of Indor Earthing as per UPPCL Norms. |
| 91 | Providing and making of cable trench as per site requirement and UPPCL Norms. |
| 92 | Painting of erected structure in switchyard. |
| 93 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
| 94 | Installation of Bus Coupler with complete earthing complete work. |
| 95 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar. |
| 96 | Wiring and connection of 33 KV VCB complete |
| 97 | Wiring and connection of 33 KV CT complete |
| 98 | Wiring and connection of 33 KV PT complete |
| 99 | Installation of 33 KV control panel for “VCB” with complete earthing with installation of battery and battery charger in control room and making connection. (complete CR pannel) |
| 100 | Concreting of Stay |
| 101 | Laying of LT Cable 3.5x400 sqmm |
| 102 | 33 KV Metering and line |
| 103 | Replacement of Existing Pin Insulator. |
| 104 | Replacement of Existing Disc insulator with fitting. |
| 105 | Shifting, loading, carriage from store centre Gorakhpur to Baranagar Pump cannal and installation of 33 KV PPMC, CT/PT Unit and TVM. |
| 106 | Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor & Indoor. |
| 107 | Laying of 33 KV 3x300 mm² ‘XLPE’ cable(D/C) by digging pit & making trench in Proper size (1M depth x1M wide) below ground level by fixing bricks(4½˝) on both side of trench wall and 9˝ brick work at the centre of the trench along the cable. Fixing brick slab on top after filling sand around both the cable including cost of bricks and sand. |
| 108 | Providing of GI Pipe and Labour charges for inserting of GI Pipe, Rising of 33 KV cable and jumpering complete work. |
| 109 | Providing and installation of Special Pipe earthing for 33 KV Jointing Kit. (complete materials with work) |