Drinking Water Supply and Sanitation Government Departments Closing in 4 days TDR #48850138

Additional Laying Of Pipe Line For Improvement Of Fhtc Functionality By Different Dia Upvc Pipe And Providing Fhtc For Pannapur Piped Water Supply Scheme At Habibpur Block In The District Of Malda Under Malda Division, P.H.E.Dte.

Issued by Government Departments · malda, West Bengal
Tender Value
18.22 Lakhs
Estimated cost
Bid Submission
27 Jul 2026
4 days left
EMD
36460
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
malda → West Bengal
EMD Exemption
Available
Quantity
Not Available

Project Description

Additional Laying Of Pipe Line For Improvement Of Fhtc Functionality By Different Dia Upvc Pipe And Providing Fhtc For Pannapur Piped Water Supply Scheme At Habibpur Block In The District Of Malda Under Malda Division, P.H.E.Dte.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 11-Jul-2025 CORRIGENDUM-V Date 31-Jul-2025
2 26-Jun-2025 CORRIGENDUM-IV Date 12-Jul-2025
3 18-Jun-2025 CORRIGENDUM-III Date 30-Jun-2025
4 28-Jul-2025 CORRIGENDUM-VI Date 18-Aug-2025
5 24-Dec-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XII Date 27-Jan-2026
6 17-Oct-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-X Date 21-Nov-2025
7 24-Nov-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XI Date 24-Dec-2025
8 21-May-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 Date 02-Jun-2025
9 31-May-2025 Corrigendum_II Date 16-Jun-2025
10 25-Aug-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM-VIII Date 10-Sep-2025
11 18-Aug-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-VII Date 23-Aug-2025
12 09-Sep-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-IX Date 29-Oct-2025
13 23-Mar-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XV Date 25-Apr-2026
14 20-Jan-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XIII Date 25-Feb-2026
15 24-Feb-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XIV Date 25-Mar-2026
16 24-Apr-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XVI Date 25-May-2026
17 23-Mar-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XV Date 25-Apr-2026
18 24-Dec-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XII Date 27-Jan-2026
19 24-Nov-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XI Date 24-Dec-2025
20 24-Feb-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XIV Date 25-Mar-2026
21 20-Jan-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XIII Date 25-Feb-2026
22 18-Aug-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-VII Date 23-Aug-2025
23 28-Jul-2025 CORRIGENDUM-VI Date 18-Aug-2025
24 11-Jul-2025 CORRIGENDUM-V Date 31-Jul-2025
25 17-Oct-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-X Date 21-Nov-2025
26 09-Sep-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-IX Date 29-Oct-2025
27 25-Aug-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM-VIII Date 10-Sep-2025
28 26-Jun-2025 CORRIGENDUM-IV Date 12-Jul-2025
29 18-Jun-2025 CORRIGENDUM-III Date 30-Jun-2025
30 31-May-2025 Corrigendum_II Date 16-Jun-2025
31 21-May-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 Date 02-Jun-2025
32 24-Apr-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XVI Date 25-May-2026
33 23-Mar-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XV Date 25-Apr-2026
34 24-Feb-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XIV Date 25-Mar-2026
35 20-Jan-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XIII Date 25-Feb-2026
36 24-Dec-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XII Date 27-Jan-2026
37 24-Nov-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XI Date 24-Dec-2025
38 17-Oct-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-X Date 21-Nov-2025
39 09-Sep-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-IX Date 29-Oct-2025
40 25-Aug-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM-VIII Date 10-Sep-2025
41 18-Aug-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-VII Date 23-Aug-2025
42 28-Jul-2025 CORRIGENDUM-VI Date 18-Aug-2025
43 11-Jul-2025 CORRIGENDUM-V Date 31-Jul-2025
44 26-Jun-2025 CORRIGENDUM-IV Date 12-Jul-2025
45 18-Jun-2025 CORRIGENDUM-III Date 30-Jun-2025
46 31-May-2025 Corrigendum_II Date 16-Jun-2025
47 21-May-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 Date 02-Jun-2025
48 20-May-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XVII Date 30-Jun-2026
49 20-May-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XVIII_ Date 30-Jun-2026
50 20-May-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XVII Date 30-Jun-2026
51 24-Apr-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XVI Date 25-May-2026
52 23-Mar-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XV Date 25-Apr-2026
53 24-Feb-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XIV Date 25-Mar-2026
54 23-Jun-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XVIII Date 27-Jul-2026
55 09-Sep-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-IX Date 29-Oct-2025
56 25-Aug-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM-VIII Date 10-Sep-2025
57 18-Aug-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-VII Date 23-Aug-2025
58 28-Jul-2025 CORRIGENDUM-VI Date 18-Aug-2025
59 11-Jul-2025 CORRIGENDUM-V Date 31-Jul-2025
60 20-Jan-2026 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XIII Date 25-Feb-2026
61 24-Dec-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XII Date 27-Jan-2026
62 24-Nov-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-XI Date 24-Dec-2025
63 17-Oct-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 CORRIGENDUM/ADDENDUM-X Date 21-Nov-2025
64 26-Jun-2025 CORRIGENDUM-IV Date 12-Jul-2025
65 18-Jun-2025 CORRIGENDUM-III Date 30-Jun-2025
66 31-May-2025 Corrigendum_II Date 16-Jun-2025
67 21-May-2025 WBPHED/EE/MD/NIeT_05 of 2025-2026, Sl.No.14 Date 02-Jun-2025

BOQ

Name of Work: -Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe & providing FHTCfor PANNAPUR pipedWater Supply Scheme at Habibpur Block in the District of Malda underMalda Division, P.H.E.Dte.
Sl. No. Item Description
1Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining anaverage depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C.
2N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii) No part payment at any stage on account of supply of materials shall be entertained. iv) Payment will be made on actual consumption of materials. v) UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list.vi) Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so.vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii) All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill.
3(i) Laying of pipe line including cost of pipe & fittings /fitting but excluding cost of valves.
4a) 90 mm (OD)
5b) 110 mm (OD)
6c) 125 mm (OD)
7d)140 mm (OD)
8e) 160 mm (OD)
9g)180 mm (OD)
10h) 200 mm (OD)
11Construction of different dia Sluice valve /Air valve /Washout chamber indifferent sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in RCC cover slab with necessary opening for operation of valve all complete including cost of labour & materials as per Departmental Dwg. [Reinforcement type:- Other manufactuerers not specified]
12a) 80 mm to 150 mm dia pipe
13b) 200 mm (OD)
14Labour charges for horizontal auger boring including boring charges pipe laying and jointing main barricading lighting arrangement etc. all complete as per direction of EIC for 80 mm dia to 200 mm dia.
15Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) with carried earth arranged by the contractor within radious 3 K.M. including cost carried.
16Supply and delivery of CIDF sluice valve (Special type) PW-1.00 of different dia make with CI double flanged non rusting spindle sluice valves conforming to IS 14846 -2000 with latest emended having body dome/ bonnet and cover of C.I.Gr-F.G 210mtr. spindle of IS-6603 G.R 12/Gr-13 non-magnetic, nuts seat rings are of Gunonetal as per IS:318 LTB-2 flanges and drilled to IS:1538 Part IV & VI valves are suitable for max. working pressure of 10kg/cm2(seat test) and body tested to 15kg/cm2.N.B: The above item should be procured from the reputed manufactures as per deptt. approvedvender list
17a) 100 mm dia
18b) 150 mm (OD)
19c) 200 mm (OD)
20Making flange joint to DI/CI pipes, specials and valves where necessary with supply of required rubber insertion and nut bolts, washers etc. of approved quality and type all complete as per specification and direction of EIC (Nut and bolts shall be of TATA/GKW rate)
21a) 100 mm dia
22b) 150 mm (OD)
23c) 200 mm (OD)
24Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3 , if contractor used water from deptt. source).
25a) 90 mm dia
26b) 110 mm (OD)
27c) 125 mm (OD)
28d)140 mm (OD)
29e) 160 mm (OD)
30g)180 mm (OD)
31h) 200 mm (OD)
32Ordinary Cement Concrete(mix4 : 2 :1) with graded stone chips (20 mm. nominal size) excluding shuttering and reinforcement, if any, in ground floor, as per IS codes.
33Dismantling all type of plain cement concrete works, stacking serviceable materials of site and removing rubbish as directed within a lead of 75mtr. for laying all dia pipe line in ground floor,a) upto 150mm thick.
34Rectification or repairing of existing FHTC connection from C.I./D.I./UPVC/HDPE /G.I./A.C. distribution pipeline with labour cost for cutting trench (1m X 0.9m X 1.2m) carefully without damaging the existing distribution pipe line, (in case of damaged if any pipe line during eexecution, necessary damaged should be repairing by the agency in his own cost) removing carefully old damage / good condition saddle piece, brass/gunmetal and refitting saddle pice and ferrule and all accessories, after connection work filling the trenches by earth all labour work are complete (Excluding all necessary Materials) as per direction of EIC.
35Supplying, fitting, & fixing alloy iron with brassspindle Bib cock/ Stop cock of approved brand and make, spray painted and tested to 21 Kg per Sq.cm. (i) 15 mm. dia.
36Providing FHTC from the existing CI/DI/uPVC/HDPE/GI/AC distribution pipeline by installing 10 mm NB Gun-metal Ferrule conforming to IS 2692:1989 with latest amendments on the said pipeline with supply, fitting & fixing of all other accessories like saddle piece of required size to fit the existing distribution pipe line, specials, nut & bolts, rubber sheet, washers etc and supply & laying of 15 mm NB PVC (schedule 80)/20 mm OD HDPE (PE100, PN16) pipe (average 15m length) with all necessary specials 1.0 metre below the ground connecting the ferrule including cutting trenches in all sorts of soil and filling up trenches as per direction of the Engineer- in Charge and upto a point just inside the premises of the household or as directed by EIC. Supply and installation of a 15mm dia. alloy iron Bib Cock (tested to 21 Kg/cm²) above 1.0 Mtr. from ground, an alloy Stop Cock of 15 mm dia. with brass spindle (tested to 21 Kg/cm²) to be fitted in a position as directed by E.I.C. G.I. pipe of TATA make (medium duly) of 2 metre length with all necessary specials to continue from the end of the HDPE/PVC pipe and upto 1.0 m above ground within the premises of household.Note:-1. PVC pipe shall of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with G.I. Pipes as per IS:1239 (Part-I)2.Payment of Supply & laying of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials 1.0 metre below the ground will be made on actual measurement basis. The rate of this item is Rs. 117/- per metre.3) Materials to be supplied as per approved vendor list of PHED. Providing FHTC from the existing CI/DI/uPVC/HDPE/GI/AC distribution pipeline by installing 10 mm NB Gun-metal Ferrule conforming to IS 2692:1989 with latest amendments on the said pipeline with supply, fitting & fixing of all other accessories like saddle piece of required size to fit the existing distribution pipe line, specials, nut & bolts, rubber sheet, washers etc and supply & laying of 15 mm NB PVC (schedule 80)/20 mm OD HDPE (PE100, PN16) pipe (average 15m length) with all necessary specials 1.0 metre below the ground connecting the ferrule including cutting trenches in all sorts of soil and filling up trenches as per direction of the Engineer- in Charge and upto a point just inside the premises of the household or as directed by EIC. Supply and installation of a 15mm dia. alloy iron Bib Cock (tested to 21 Kg/cm²) above 1.0 Mtr. from ground, an alloy Stop Cock of 15 mm dia. with brass spindle (tested to 21 Kg/cm²) to be fitted in a position as directed by E.I.C. G.I. pipe of TATA make (medium duly) of 2 metre length with all necessary specials to continue from the end of the HDPE/PVC pipe and upto 1.0 m above ground within the premises of household.Note:-1. PVC pipe shall of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with G.I. Pipes as per IS:1239 (Part-I)2.Payment of Supply & laying of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials 1.0 metre below the ground will be made on actual measurement basis. The rate of this item is Rs. 117/- per metre.3) Materials to be supplied as per approved vendor list of PHED.
37a) Up to 10 m length
38b) Above 10 m upto 20 m Length
39Collection of house hold details at PRESCRIBED FORMAT THROUGH Mobile App and hard copy including Geo-reference as directed by E.I.C and submission of the same to P.H.E dte in soft copy .
40Provision for extra supply and laying of 15 mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials 1.0 meter below the ground including cutting trenches in all sorts of soil and filling up trenches as per direction of the E.I.C., beyond 15mtr length as consider in item no.1
41Making villageroad(Average 3m width)crossing by horizontalAugor-boringfor accomodation of laying of avarage 3(three) nos15 mm dia. G.I. pipes for FHTC oras per direction of EIC.
42Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately)A) For Exposed Work(i) 15 mm dia. medium quality
43Submission of complete detailed drawing of distribution system, rising main etc. after execution of work showing position of different types of valves, fittings/specials sluice valve chamber with location, node to node wise in the sanctioned drawing as completion drawing of the water supply scheme as per direction and satisfaction of EIC. The list of dia wise fitting/specials, different pipes ;of valve used in the rising main should be shown in the completion drawing (not separate) with verified by JE & AE in-charge of the scheme. The above drawing will be submitted in 5 copies.
44Carriage of different type of departmental pipes from Divisional/Sub-divisional store to the work site by truck including loading, unloading, stacking etc. including cost of fuel, lubricant and also cost of driver, helper etc. and all other taxes and charges as applicable as per direction of EICa) Above 20 KM to 30 KM
45Add GST 18.00 %
46Add Labour Welfair Cess 1%

AI Tender Summary

OUR REF NO 48850138
AUTHORITY Government Departments
TENDER VALUE 18.22 Lakhs
LAST DATE 27-07-2026
Authority
Authority Name Public Health Engineering Department
Work Description Additional Laying Of Pipe Line For Improvement Of Fhtc Functionality By Different Dia Upvc Pipe And Providing Fhtc For Pannapur Piped Water Supply Scheme At Habibpur Block In The District Of Malda Under Malda Division, P.H.E.Dte.
Basic Detail
Tender No WBPHED/EE/MD/NIeT_05 of 2025-2026
Bidding Type Tender
Location
City malda
State West Bengal
Key Dates
Publish Date 23 Jun 2026
Submission Date 27 Jul 2026
Open Date 29 Jul 2026
Finance
Tender Value 18.22 Lakhs
Tender Fee Ref. Documents
EMD 36460
Exemption Available
Document List
f95b3ce4-dd88-462f-b038-700ee29cfd04.html
BOQ_1868308.xls
Tendernotice_4.pdf
Tendernotice_1.pdf
Tendernotice_2.pdf
Tendernotice_3.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 31, 2025
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 12, 2025
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 30, 2025
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 18, 2025
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 27, 2026
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 21, 2025
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 24, 2025
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 02, 2025
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 16, 2025
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 10, 2025
18:00 IST

Corrigendum-10 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 23, 2025
18:00 IST

Corrigendum-11 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 29, 2025
18:00 IST

Corrigendum-12 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 25, 2026
18:00 IST

Corrigendum-13 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 25, 2026
18:00 IST

Corrigendum-14 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-15 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 25, 2026
18:00 IST

Corrigendum-16 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 25, 2026
18:00 IST

Corrigendum-17 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 27, 2026
18:00 IST

Corrigendum-18 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 24, 2025
18:00 IST

Corrigendum-19 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-20 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 25, 2026
18:00 IST

Corrigendum-21 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 23, 2025
18:00 IST

Corrigendum-22 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 18, 2025
18:00 IST

Corrigendum-23 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 31, 2025
18:00 IST

Corrigendum-24 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 21, 2025
18:00 IST

Corrigendum-25 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 29, 2025
18:00 IST

Corrigendum-26 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 10, 2025
18:00 IST

Corrigendum-27 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 12, 2025
18:00 IST

Corrigendum-28 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 30, 2025
18:00 IST

Corrigendum-29 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 16, 2025
18:00 IST

Corrigendum-30 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 02, 2025
18:00 IST

Corrigendum-31 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 25, 2026
18:00 IST

Corrigendum-32 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 25, 2026
18:00 IST

Corrigendum-33 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-34 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 25, 2026
18:00 IST

Corrigendum-35 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 27, 2026
18:00 IST

Corrigendum-36 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 24, 2025
18:00 IST

Corrigendum-37 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 21, 2025
18:00 IST

Corrigendum-38 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 29, 2025
18:00 IST

Corrigendum-39 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 10, 2025
18:00 IST

Corrigendum-40 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 23, 2025
18:00 IST

Corrigendum-41 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 18, 2025
18:00 IST

Corrigendum-42 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 31, 2025
18:00 IST

Corrigendum-43 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 12, 2025
18:00 IST

Corrigendum-44 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 30, 2025
18:00 IST

Corrigendum-45 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 16, 2025
18:00 IST

Corrigendum-46 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 02, 2025
18:00 IST

Corrigendum-47 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 30, 2026
18:00 IST

Corrigendum-48 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 30, 2026
18:00 IST

Corrigendum-49 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 30, 2026
18:00 IST

Corrigendum-50 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 25, 2026
18:00 IST

Corrigendum-51 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 25, 2026
18:00 IST

Corrigendum-52 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-53 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 27, 2026
18:00 IST

Corrigendum-54 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 4 days
Oct 29, 2025
18:00 IST

Corrigendum-55 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 10, 2025
18:00 IST

Corrigendum-56 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 23, 2025
18:00 IST

Corrigendum-57 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 18, 2025
18:00 IST

Corrigendum-58 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 31, 2025
18:00 IST

Corrigendum-59 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 25, 2026
18:00 IST

Corrigendum-60 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 27, 2026
18:00 IST

Corrigendum-61 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 24, 2025
18:00 IST

Corrigendum-62 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 21, 2025
18:00 IST

Corrigendum-63 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 12, 2025
18:00 IST

Corrigendum-64 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 30, 2025
18:00 IST

Corrigendum-65 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 16, 2025
18:00 IST

Corrigendum-66 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 02, 2025
18:00 IST

Corrigendum-67 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 27, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days
Jul 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
html

f95b3ce4-dd88-462f-b038-700ee29cfd04.html

xls

BOQ_1868308.xls

pdf

Tendernotice_4.pdf

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

pdf

Tendernotice_3.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders