|
| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Supply, installation, testing and commissioning Compressor for water Cooler. |
| 3 | Supplying, Refilling of refrigeration for water Cooler |
| 4 | Supplying, fixing and testing of Thermostart for Water Cooler |
| 5 | Supplying, fixing and testing of Condenser fan motor |
| 6 | Supplying, fixing and testing of Condenser fan blade. |
| 7 | Supplying, fixing and testing of compressor relay. |
| 8 | Supplying, fixing of RO pipe. |
| 9 | Supplying, fixing of drain pipe. |
| 10 | Supplying and fixing of water cooler foot. |
| 11 | Supplying and fixing of condenser coil of water cooler. |
| 12 | Supplying, fixing of Brass Push Cock Bib Tap |
| 13 | Supplying, fixing of Tap adapter connector |
| 14 | Charges of compressor base plate replacement, including 18-gauge MS plate, Angle, MS flat, Nut & bolt with two coat primer color. |
| 15 | Charges for SS welding work |
| 16 | Supply and fixing of copper pipe as per require size |
| 17 | Supply of SS 20-gauge SS plate |
| 18 | Supplying and fixing of Flot valve. |
| 19 | Supply and fixing of jubilee clamp. |
| 20 | Supplying, fixing and testing of capacitor. |
| 21 | Supplying, fixing of 16 amps Ele. Board and switch. |
| 22 | Supplying, fixing of electrical wire as per the required size. |