Name / Description:ROUTINES ON INDUSTRIAL WASHING MACHINE, DRIER AND DRIER TUMBLER ON INS JAMUNA
Sl. No.
Item Description
1
VESSEL : INS JAMUNAWO.NO:22040DL NOS : : 20288,89,90,30058,59,26..ROUTINES ON WASHING MACHINE, DRIER AND DRIER TUMBLER
2
LAUNDRY DRIER:CARRY OUT SR ROUTINES ON LAUNDRY DRIER. DRIER PERFORMANCE IS SUBOPTIMAL, OVERHAULING OF DRIER TO BE UNDERTAKEN. DEFECTIVE PARTS TO BE RENEWED. REMOVE OUTER CHAMBER AND RENEW ALL JOINTS.
3
LAUNDRY WASHING MACHINE:CARRY OUT SR ROUTINES ON LAUNDRY WASHING MACHINE. WASHING MACHINE PERFORMANCE IS SUBOPTIMAL, OVER HAULING OF WASHING MACHINE TO BE UNDERTAKEN. DEFECTIVE PARTS TO BE RENEWED. REMOVE OUTER CHAMBER AND RENEW ALL JOINTS. SATISFACTORY TRIALS TO BE SHOWN TO SHIP STAFF.
4
LAUNDRYDRIER TUMBLER:CARRY OUT SR ROUTINES ON LAUNDRY DRIER TUMBLER. DRIER TUMBLER PERFORMANCE IS SUBOPTIMAL, OVER HAULING OF DRIER TUMBLER TO BE UNDERTAKEN. DEFECTIVE PARTS TO BE RENEWED. REMOVE OUTER CHAMBER AND RENEW ALL JOINTS. SATISFACTORY TRIALS TO BE SHOWN TO SHIP STAFF.
5
INDUSTRIAL WASHING MACHINE: ALIGNMENT AND SERVICEABILITY CHECKS OF MOTOR AND CONTROL CIRCUIT (MICROCONTROLLER CARD) OF WASHING MACHINE IS REQUIRED TO BE CARRIED OUT VIEW SUBOPTIMAL PERFORMANCE (10 HP MOTOR). SATISFACTORY TRIALS TO BE SHOWN TO SHIP STAFF.
6
DRYING TUMBLER:HEATING ELEMENT(5 KΩ) OF DRYING TUMBLER DAMAGED AND SHOWING LOW RESISTANCE. REPLACEMENT OF HEATING ELEMENT AND SERVICEABILITY CHECKS IS REQUIRED TO BE CARRIED OUT. WORK INCLUDES REMOVAL OF OLD ELEMENT AND FITMENT OF NEW ELEMENT. SATISFACTORY TRIALS TO BE SHOWN TO SHIP STAFF.
7
DRY TUMBLER MOTOR:CARRY OUT CALIBRATION OF OVERLOAD RELAY (OLR)/ THERMAL PROTECTION (TP) RELAY OF STARTER. SATISFACTORY TRIALS TO BE SHOWN TO SHIP STAFF.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.