|
| 1 | Earth work in Excavation by mechanical means /manual meansin foundation trenches or drains excavates soil anddisposal of surplusexcavates soilas directed, within a lead of 50 m& lift up to1.5 m i/c all as per DAR No- 2.8.1 |
| 2 | P/Lin position inC.C specified grade excluding the cost of centering, shuttering ,finishing and reinforcement ( 1:6:12)with cement , coarse sand and 40mm gauge B/ ballast i/c all as per PWD(SCH)273 |
| 3 | Brick work wthi common burnt clay (non modular) bricks of class -150 in foundation and plinth with(1:4) cement and C/ sand mortar i/c allas per DAR No-6.1.1 |
| 4 | P/Lin position inC.C specified grade excluding the cost of centering, shuttering ,finishing and reinforcement ( 1:1.5:3)with cement , coarse sand and 20mm gauge stone ballast i/c all as per DAR No- 4.1.2 |
| 5 | Earth filling available excavated earth (excluding rock)in tranches, plinth,sides of foundation etc. in layars nat exceeding 20cm in depth , consolidating each deposited layer by ramming and watering,lead up to 50 m and lift upto 1.5 m i/call DAR No-2.25(a) |
| 6 | Provding andlaying of interloking concrete Block pavement having thikness 80mm as per drawings and techincalspecification Clause 1504(Excluslve G.S.B) |
| 7 | 25MM thick P.C.C. 1:2:4 with cement , coarse sand and 2cm gauge stone grit. as per SI No. 601 require for all complition of work. |
| 8 | 12 mm thick plaster of mix 1:4 (1 cement : 4 c/sand )i/c all as per DAR No-13.4.1 |
| 9 | R.C.C. work in wall (any thickness), i/cattached pilasters buttresses ,plinth and string courses , fillets, columns etcexcluding the cost of centering, shuttering ,finishing and reinforcement ( 1:1.5:3)with cement , coarse sand and 20mm gauge stone ballast i/c all as per DSR No- 5.2.2 |
| 10 | Centering, shuttering i/c strulting propper etc and removal of from forlintels, beam,plinth beamsetci/c all as per DSR No- 5.9.5 |
| 11 | Steelreinforced for R.C.C work to required shape of steel bars as necessary including bending, cuting ,placing in position i/c all complete the work - |
| 12 | Supply and fixing of information sign board including letter writing and painting etcfor compelition of work |
| 13 | Add 18% GST |