| 1 | Providing two legged scaffolding, for works upto various heights as specified using 13 to 15 cm. dia. casuarina props, the distance between the two rows being 1.25m. and the spacing of posts being 2m. in both the rows with two horizontal posts with 0.5m. overlap on either side and braces at 2m. c/c including longitudinal & transverse middle braces to stepup and providing a platform with country wood planks of 40 mm. thick & 1m. width, etc. including cost of all materials, labours, lead, lift, safety measures, etc. complete. a)For 6.50 mtr. Height |
| 2 | Dismantling the spalled / distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of alllabour, lead, lift etc., complete. |
| 3 | Removing the existing damaged felt and cleaning the surfacce free from oil, dust, dirt, grease etc., and transporting the debries with 1km lead away from the site and lowering fro the surface with water till the saturation for the entire area, rate including labour, lead lift etc., complete. |
| 4 | Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete |
| 5 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. |
| 6 | Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete. |
| 7 | Providing Micro concrete using Rendroc RG / equivalent to the distressed / spalled concrete pedestalas by applying one coat of Nitozinc / equivalent primer after thorough cleaning of rust in the reinforcement, fabricating and erecting slurry tight form work with plywood shutters with suitable supports which do not deform or leak due to pressure of micro concrete, mixed micro concrete should be placed continuously for an average thickness of 75mm, applying one coat of polymer modified acrylic emulsion (Nitobond AR /equivalent) on the finished surface as a curing membrane, applying DEKGUARD / equivalent primer by spraying to the concrete surface, and applying Two caot ofDEKGUARD/ EQIVALENT top coat to the concrete surface by brush or roller (coating shoud be done continuously without any break), rate including cost of all materials, labour, lead, lift, T&P\"s etc., complete. |
| 8 | Plastering with CM 1:3, 10mm thick including cost of all materials, labour, lead, lift etc., complete. |
| 9 | Providing PCC 1:11/2:3 screed concrete using OP/PP Cement with 6 - 10mm HBG metal (machine crushed) including cost of all materials, labour, T&P\"s leads, curing, etc., complete. |
| 10 | Chipping and cleaning the existing damaged plastered surface from walls rate including cost of all labour, lead, lift etc., complete. |
| 11 | Plastering with CM 1:5, 12mm thick including cost of all materials, labour, lead, lift etc., complete. |
| 12 | Brick work in CM 1:5 using fly ash bricks (230x110x70mm) including cost of all materials, labours, lead, lift, curing, etc. complete |
| 13 | Terrace flooring (weathering course) with one course of pressed tiles 200x200x20mm over CM 1:3, 20mm thk. mixed with crude oil 10% by weight of cement and pointing with the same oiled mortar over a bed of 80mm thick concrete broken brick jelly 20mm size in pure slaked lime with required slope over RCC roof slab including cost of all materials, labours, lead, lift, curing, etc. complete. |
| 14 | Removing the damaged gear box and side channel with gear rod upto top, greasing, replacing of new gear box, welding the gear wheel with gear rod alignment checking refixing in position over wall and removing of bottom \"T\" angle, bend removing and welding the broken plates, top cover removing dismantling the lath from the roller, removing the spring, removing shaft, reconditioning of the shaft and replacing the spring, cleaning the old grease strengthening if roller assembly and refixing in position loading the springs and overhauling the rolling shutter, gear box, roller, ball bearing etc., complete. |
| 15 | Supplying and fixing spare parts including cost of labour, materials etc., completea) Gear box assembly |
| 16 | Shutter bottom plate with stiffner angle |
| 17 | Shutter lath leaf |
| 18 | Shutter Spring (Heavy duty) |
| 19 | Providing two coats ofof ready mixed plastic emulsion (interior walls) of first quality paint andapproved colour over a prming coat including cost of all materials scaffloding charges thorough cleaning of surface, labours, lead, lift, curing, etc. complete. |
| 20 | Providing two coats with ready mixed plastic emulsion (exterior walls) of first class quality paint & approved colour over a priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours,lead, lift, curing, etc. complete |
| 21 | Supplying, fabricating and fixing in position of M.S. grill as directed by Engineer in charge rate including cost of all materials, hire charges for welding and cutting machine, welding rods including labour, lead, lift safety appliances etc., complete. |
| 22 | Painting the old iron works with two coats of best synthetic enamel paint of industrial quality Asian Paint or equivelant of approved colour with sand paper rate including cost of paint, brush, labour, lead, lift etc., complete. |
| 23 | Writing of letter painting in the Raw Water Pump House with two coat of enamel paint for background and writing letter of size 15cm bordering allround including cost of paint, labour, lead, lift, etc., complete. |
| 24 | Providing water proof treatment over the existing roof slab with polymeric asphalt membrane sheet(4kg/m2)constituting7layerswiththermo fusible HM HDFE film one at top and other of bottom layer of this polymeric mix 1 layer of fibre glass tissue, 2 layers of polymeric mix on the top and bottom of 90 microns HM HDPE film, cracks on roof slab to be filled with cement based filter, laying of PAM sheets over a coating of 90/15 hot blown bitumen with 100mm over lapsealed byLPGflame torchfurthercoatedwith oxides bitumen 90/15 and finally coated with aluminium coating and also extra attention should be given in roof / draincurveportionasperinstructionofsite Engineer including cost of all labour, lead, lift,T& P etc complete. |
| 25 | Supplying & fixing in position of 160mm dia. PVC pipe of 4 kg/cm2 pressure with PVC specials, clamps, bolts & nuts by replacing the existing damaged and broken cement rain water downfall pipes including cost of all materials, labours, lead, lift, etc. complete (water line) - Site work. |
| 26 | Providing one coat of white wash with white cement to the newly plastered area including cost of all materials, labour, lead, lift etc., complete. |