| 1 | Earthwork in excavation in foundation trenches or drain in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading & stacking the spoil within a lead of 75m as directed. The item includes necessary trimming the sides of trenches. Levelling, dressing and ramming the bottom, bailing out of water as required complete.(a) Depth of excavation not exceeding 1500 mm. |
| 2 | Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work).a) With earth obtained from excavation of fundation. |
| 3 | b)With carried earth arranged by the contractor within a radius of 3 km. Including cost of carried earth. |
| 4 | Filling in foundation or plinth by fine sand in layers not exceeding 150mm as directed and consolidating same by thorough saturation with water ramming complete. Including the cost of supply of sand.( Payment to bemade on measurment of finished quantity ) |
| 5 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. |
| 6 | Hire charges for shuttring with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beam, columns, lintles curved or straight including fitting, fixing and striking out after completion of works.(In all floors): 25mm to 30mm thick wooden shuttering as per decision and direction of Engineer-In-Charge.a) 25mm to 30mm thick wooden shuttering without staging in foundation. |
| 7 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety]. (a) 1:3:6 proportion |
| 8 | Ordinary cement concrete ( mix 1:1.5:3 ) with graded stone chips ( nominal 20 mm size) excluding shuttering and reinforcement. If any, : Pakur Variety. (Rate Analysis) |
| 9 | Reinforcement for reinforced work in all sorts of structures including distribution bars, stirrups, binders etc intial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every inersection, complete as per drawing and direction.(Rate Analysis).(i) JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL(a) For works in foundation, basement and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steeel.: For works in foundation, basement and upto roof of ground floor upto 4mtr. |
| 10 | Brickwork with 1st class brick in Cement mortar 1:6.In foundation and plinth. |
| 11 | 125 mm thick brickwork with 1st class bricks in cement mortar (4:1) : In ground floor |
| 12 | Plaster to wall, floor etc with sand and cement morter (1:6) including rounding off or champhering corners as directed and racking out joints or roughing of concrete surface including throating, nosing and drip course where necessary (In all floors). b)With 6:1 cement morter. (i) 20 mm thick plaster in Ground Floor. |
| 13 | Neat cement punning in wall /dado, window sills, floor drains etc. in all floors about 1.5mm thick. |
| 14 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer\"s specification and as per direction of the EIC. In Ground Floor:a) One Coat. |
| 15 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer\"s specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.In Ground floor (Two Coat) |
| 16 | M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (ii) Grill weighing above 16 Kg./sq.mtr and above. |
| 17 | Extra for work in grill gate: For hanging and locking arrangements including supply of materials and labour complete. |
| 18 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 19 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :With super gloss (hi-gloss)iv) Two coats ( with any shade except white). |
| 20 | Clearing compound premises of shurbs, plants, jungles 10.0 etc. by cutting and removing as directed (Specific permission of Engineerin- Charge prior to execution will be necessary). |
| 21 | Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick paymentwithout damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVCfitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of |
| 22 | cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C.N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line.ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list.iii)No part payment at any stage on account of supply of materials shall be entertained.iv)Payment will be made on actual consumption of materials.v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list.vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so.vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item.viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill.(A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves. |
| 23 | (b) 90 mm(OD) |
| 24 | Emergency horizontal road crossing by Augor-boring including boring charge, pipe laying and jointing, making baricates, lighting arrangement etc. all complete as per direction of E.I.C. For 0 mm dia. to 200 mm dia pipes. |
| 25 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand |
| 26 | Ordinary Cement concrete (mix 4:2:1) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. |
| 27 | Hire charges for shuttring with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beam, columns, lintles curved or straight including fitting, fixing and striking out after completion of works.(In all floors): 25mm to 30mm thick wooden shuttering as per decision and direction of Engineer-In-Charge.a) 25mm to 30mm thick wooden shuttering without staging in foundation. |
| 28 | Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal/Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge . |
| 29 | Rectification or repairing of existing FHTC connection from C.I./D.I./UPVC/HDPE/G.I./A.C. distribution pipeline with labour cost for cutting trench (1m X 0.9m X 1.2m) carefully without damaging the existing distribution pipe line, (in case of damaged if any pipe line during eexecution, necessary damaged should be repairing by the agency in his own cost) removing carefully old damage / good condition saddle piece, brass/gunmetal and refitting saddle pice and ferrule and all accessories, after connection work filling the trenches by earth all labour work are complete (Excluding all necessary Materials) as per direction of EIC. |
| 30 | Collection of house hold details at PRESCRIBED FORMAT THROUGH Mobile App and hard copy including Geo-reference as directed by E.I.C and submission of the same to P.H.E dte in soft copy . |
| 31 | Provision for extra supply and laying of 15 mm NB PVC schedule 80)/20 mm OD HDPE (PE 100, PN 16) pipe with all necessary specials 1.00 meter bellow the ground level including cutting trenches in all sorts of soil and filling up trenches as per direction of the E.I.C. |
| 32 | Making Village Road (Avg. 3M width) crossing by Horizontal auger borng for accomodation of laying of avarage 3(three) nos. 15 mm dia pipes for FHTC or as per direction of Engineer-In-Charge. |
| 33 | Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately)A) For Exposed Work.(i) 15 mm dia. medium quality. |
| 34 | Providing FHTC from the existing CI/DI/uPVC/HDPE/GI/AC distribution pipeline by installing 10 mm NB Gun-metal Ferrule conforming to IS 2692:1989 with latest amendments on the said pipeline with supply, fitting & fixing of all other accessories like saddle piece of required size to fit the existing distribution pipe line, specials, nut & bolts, rubber sheet, washers etc and supply & laying of 15 mm NB PVC (schedule 80)/20 mm OD HDPE (PE100, PN16) pipe (average 15m length) with all necessary specials 1.0 metre below the ground connecting the ferrule including cutting trenches in all sorts of soil and filling up trenches as per direction of the Engineer- in Charge and upto a point just inside the premises of the household or as directed by EIC. Supply and installation of a 15mm dia. alloy iron Bib Cock (tested to 21 Kg/cm²) above 1.0 Mtr. from ground, an alloy Stop Cock of 15 mm dia. with brass spindle (tested to 21 Kg/cm²) to be fitted in a position as directed by E.I.C. G.I. pipe of TATA make (medium duly) of 2 metre length with all necessary specials to continue from the end of the HDPE/PVC pipe and upto 1.0 m above ground within the premises of household.Note:-1. PVC pipe shall of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with G.I. Pipes as per IS:1239 (Part-I)2.Payment of Supply & laying of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials 1.0 metre below the ground will be made on actual measurement basis. The rate of this item is Rs. 117/- per metre.3) Materials to be supplied as per approved vendor list of PHED.( Corrigendum no-2 WBPHED SChedule of RateJuly 2019 SOR of FHTC20/01/2022/O/oCEPWQM(DPHE) |
| 35 | a) Up to 10 m length |
| 36 | b) Above 10 m upto 20 m Length |
| 37 | Add Includng GST @18% |
| 38 | Add Includng CESS @1% |