| 1 | (A) Safe loading & carriage including Loading-unloading & proper stacking of following store materials from ESC Tripula to site of work. |
| 2 | 8.5 Mtr Long PCC POLE |
| 3 | 11 Mtr Long ST POLE (SP-55 G.I.) |
| 4 | NEW 25 KVA T/F |
| 5 | LOOSE LINE MATERIAL ACSR WEASEL CONDUCTOR 2372 Mtr., S/S BASE ANGLE 41 No,G.I. WIRE 6 SWG 161 Kg., 11KV GI PIN WITH NUT 1 No,STAY WIRE 7/10 SWG 102.5 Kg,11 KV COMPOSITE POLYMER PIN INSULATOR 45 No,11 KV COMPOSITE POLYMER DIS INSULATOR 45 KN 51 No., 11 KV DISC FITTING 45 KN 46 No,11 KV TPMO 1 No,TOP CHANNEL 10 No,T-OFF CHANNEL 09 No., STAY COMPLETE (16X1800) 20 No,EARTHING COMPLETE 24 N0., DROPPER CHANNEL (100X50X5X2028) 02 No, M.S. DROPPER ANGLE 10 N0. 11 KV V-Type X-Arm13 No., 11KV XLPE CABLE 3*70 MM2 360 Mtr., 11KV XLPE CABLE 3*120 MM2140 Mtr., 11KV XLPE CABLE 3.5*150 MM2 10 Mtr., CABLE BOX I/D 11KV 3X70 XLPE 3 No., CABLE BOX O/D 11KV 3X70 XLPE11 No., CABLE BOX I/D 11KV 3X120 XLPE 4 No., CABLE BOX O/D 11KV 3X120 XLPE 04 N0., 11KV CT/PT Pole Mounted Unit 5/5Amp. 1 No., 11KV CT/PT Pole Mounted Unit 10/5Amp. 2 No., GUARDING ANGLE7 No., 11 KV PILFER PROOF METERING CUIBICAL CTR. 5/5A 01 No., 11 KV PILFER PROOF METERING CUIBICAL CTR. 10/5A 03 No., FUSE SET 11 KV 01 No. Etc. |
| 6 | ERRECTION |
| 7 | Errection of 8.5 Mtr long PCCPole including digging of Pits & fitting of accessories. |
| 8 | Errection of 11 Mtr long ST Pole including digging of Pits & fitting of accessories. |
| 9 | Earthing ofpoles as per RESSPO norms. |
| 10 | Grouting of Poles as per RESSPO norms with grouting materials. |
| 11 | Digging of pits, fixing nozzling& grouting of stay rods as per RESSPO norms including grouting materials. |
| 12 | 11 KV TVM Category |
| 13 | Laying, stringing & sagging of 3Ø3wire 11 kv HT lineby Weasal conductor including all associated works & making clearance of road with joints/jumpers & binding on insulators as required as per RESSPO norms. |
| 14 | Mounting/Installation of New 11 Pilfer Proof Metering Quibical Ratiowith cable Termination kit. CTR. 10/5A Complete in all respect as per RESSPO norms. |
| 15 | Mounting/Installation of New 11 Pilfer Proof Metering Quibical Ratiowith cable Termination kit. CTR. 5/5A Complete in all respect as per RESSPO norms. |
| 16 | Mounting/Errection of 11KV TPMO Set.Complete in all respect as per RESSPO norms |
| 17 | Mounting/Errection of 11KV fuse set. Complete in all respect as per RESSPO norms. |
| 18 | Laying of 11KV XLPE cable of size 3X120 mm2. complete in all respect as per RESSPO norms |
| 19 | Laying of 11KV XLPE cable of size 3X70 mm2. complete in all respect as per RESSPO norms |
| 20 | Laying of 11KV XLPE cable of size 3.5X150 mm2. complete in all respect as per RESSPO norms |
| 21 | Mounting of 25 KVA T/F transformer L-II 4 Star Alluminium Wound including all associated works as required. |
| 22 | Pipe Erathing |
| 23 | Pipe Erathing 40 Feet For Pilfer |
| 24 | Digging of 2x60 feet deep boring type neutral and body of distribution T/F at different places and welding ofG.I strip including the cost of M.S. pipe 1.25 Inch dia, 2*40 feet long and MS strip 25*3 mm of suitable length for connecting M.S pipe to neutral through proper welding or bolt and nut. All material, consumables and T&P will be privided by contractor. |
| 25 | Stringing and sagging of 2 wire of 6 SWG G.I. Wire for guarding and making lacing at 1 meter a part in all the spans . |
| 26 | O/D CJK Making Charges in all respect as per RESSPO norms |
| 27 | Filling of cable box I/D11 KV (3X70) sq mm. Complete in all respect. |
| 28 | Filling of cable box O/D11 KV (3X70) sq mm. Complete in all respect. |
| 29 | Filling of cable box I/D11 KV (3X120) sq mm. Complete in all respect. |
| 30 | Filling of cable box O/D11 KV (3X120) sq mm. Complete in all respect. |
| 31 | Mounting of Outdoor CT/PT combined unit CTR. 5/5A on pole. |
| 32 | Mounting of Outdoor CT/PT combined unit CTR. 10/5A on pole. |
| 33 | PROVIDED BY CONTRACTOR |
| 34 | NUT AND BOLT OFF SIZE |
| 35 | HOLDING CLAMP FOR ROUND POLE |
| 36 | HOLDING CLAMP FOR PCC POLE |
| 37 | STAY CLAMP5½\" |
| 38 | DANGER BOARD WITH CLAMP |
| 39 | AlluminiumLug 120 sqmm |
| 40 | LTMS CLAMP FOR PCC/STP |
| 41 | STONE PAD |
| 42 | GI PIPE 6\" DIA |
| 43 | F-CLAMP FOR PCC POLE |
| 44 | STAY INSULATOR |
| 45 | LOOP INSULATOR FOR STAY |