Supply Of Materials For The Construction Of Kitchen Shed At Govt. High School Hadikere Gp, Tarikere Taluk, Chikkamagaluru Dist - Broken Stone Aggregate 40 Mm Size(Hdkr),Broken Stone Aggregate 20 Mm Size(Hdkr),Broken Stone Aggregate 12 Mm To 10 Mm Size(Hdkr),Coarse Sand (Zone Iii)(Hdkr),Portland Cement(Hdkr),Mixer (Concrete) - 1 Cum Capacity(Hdkr),Add Watering Charges At 1 % On Material(Hdkr),Plasticizer / Super Plasticizer(Hdkr),Hom Of Vibrator 0.71 Days(Hdkr),Jungle Wood Runners And Planks(Hdkr),Silver Oak Or Equivalent Planks 38 Mm Thick(Hdkr),Casurina Poles 100 - 150 Mm(Hdkr),Add Handling , Loading And Unloading At 2% On Material(Hdkr),Casurina Poles 75 - 100 Mm Dia(Hdkr),Tmt Bars Fe 500(Hdkr),Binding Wire(Hdkr),Rubble Stones(Hdkr),Bond Stone 20 X 20 X 45 Cm(Hdkr),Mixer (Concrete Small Used In Culvert)(Hdkr),Add Watering Charges At 1 % On Labour(Hdkr),Burnt Bricks Class 35 (Non Modular)(Hdkr),Add Handling , Loading And Unloading At 1% On Material(Hdkr),Mathi/Nandi Wood Planks For Panels 25 Mm Thick(Hdkr),Add Cutting And Other Wastage 5%(Hdkr),Hom Of Machinaries For Planing(Hdkr),Mathi/Nandi Wood Scantling(Hdkr),M.S Rods(Hdkr),Ms Flat(Hdkr),Fitter Class I(Hdkr),Welder Grade I(Hdkr),Add Hom Of Welding And Grinding Machine At 4% On Material(Hdkr),Ready Mix Primer Paint (Ready Mix Red Lead Paint)(Hdkr),Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint(Hdkr),Painter Class I(Hdkr),Add Providing And Removing Scaffolding At 3% On Labour(Hdkr),Enamel Metal Paint(Hdkr),Add Brush At 1% On Cost Of Paint(Hdkr),Mason Class I (With Tools)(Hdkr),Powder Coated 60-70 Micron(Hdkr),Nylon Rollers(Hdkr),Rubber Beading For Shutters Beading(Hdkr),Pvc Beading(Hdkr),Alluminium Tower Bolt - 20 Cm(Hdkr),Alluminium Handles - 15 Mm(Hdkr),Cleat Angles(Hdkr),Chrominum Plated Screws(Hdkr),Thick Plain Glass 5.50 Mm(Hdkr),Fabricator(Hdkr),Add Hom Of Welding And Grinding Machine At 2% On Material(Hdkr),Dry Distemper(Hdkr),Whitening(Hdkr),Add Brush, Putty, Glue At 5% On Cost Of Paint(Hdkr),Water Proofing Cement Paint(Hdkr),Add Brush, Putty, Sand Paper, Roller At 1% On Cost Of Paint(Hdkr),Primer(Hdkr),Liquid Wood Filler(Hdkr),Add Brush, Putty, Sand Paper At 5% On Cost Of Paint(Hdkr),Lime(Hdkr),Ceramic Tiles 30 X 30 Cms(Hdkr),White Cement(Hdkr),Vitrified Tiles 600X600 Mm(Hdkr),Granite Sink 23Cm Thick(Hdkr),White Vitreous China Clay Flat Back Wash Basin Size 630X450mm(Hdkr),Copper Plated Brass Piller Tap 15Mm(Hdkr),Cp Brass Chain With Plug(Hdkr),Cp Brass Waste 32 Mm Of Standard Pattern(Hdkr),Brass Stop Cock(Hdkr),C.I. / M.S. Brackets For Flushing Cistern(Hdkr),Lead Or Pvc Connection Pipe 32Mm Dia (For Wash Basin)(Hdkr),Licenced Plumber With Tools(Hdkr),Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2% On Material(Hdkr),Pvc Pipe Of 4Kg/Cum,63 Mm(Hdkr)