| 1 | Dismantling of AC sheet & AC Ridge etc.Including stacking of dismantle materialas per directed by engineer in charge etc (SI No.701) |
| 2 | Dismantling of grids, trusses and other steel work Including stacking of dismantle materialas per directed by engineer in charge etc (SI No.702) |
| 3 | Mild steel or iron work in heavy size such as grill Gate, trusses etc. wrought to required form including drilling holes riveting or welding where necessary and their fixing required for proper completion of the work. (S.I.N DSR) |
| 4 | Providing & fixing of colour coated galvanized corrugated matel roofing profile sheet in thickness of 0.5mm including supply of all material. (suprime,tata, )etc. including vertical / curved surface fixed with polymer coted J or L Hooks, bolts and nuts 8mm diater with bitumen and & G.I. |
| 5 | SAME as Item no (6) but ridge including all as above respect. ( DSR 10.1.2 2018) |
| 6 | Providing and applying two coats painting over priming coat on steel & other metal surfaces up to 10cm width or grith or smalll articks no exceeding 0.10sqmin areas with Superior synthetic enamal such as LUXOL- 3 HI GLOSS APCOLITE superlac dulux specified finishing to give an even shade & including cleaning the surface of alldirt,dust & other foreign matter sand papering and stopping including cost of all materials , labours ,tools & plans etc . required for proper completion of work.SI NO 641+642 |
| 7 | Earth work In surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge: 2.1.1 All kinds of soil. |
| 8 | Providing and laying of Cement concrete specified grade with 1:4:8 (1cement :4 course sand : 8 graded stone aggrigate nominal size under floors, including supply of all materials, labour & T&P etc. required for proper completion of the work. |
| 9 | Providing and laying of Cement concrete specified grade with 1:1.5:3 (1cement :1.5 course sand : 3 graded stone aggrigate 20 mm nominal size under floors, including supply of all materials, labour & T&P etc. required for proper completion of the work. |
| 10 | Providing and fixinf of A.C. Sheet strips under floors, including supply of all materials, labour & T&P etc. required for proper completion of the work. |
| 11 | M-150 brick work in 1:4 cement and coarse sand mortar in foundation & plinth including supply of all material, labour T&P etc. including curing complete (Sl. No. 305b) |
| 12 | 12mm thick cement plaster 1:4 cement and coarse sand(FM1.25) mortar over brickwork including supply of all materials, labour and T&P et. required for proper completion of work, (SI NO 13.4.1) |
| 13 | Applying Birla putty two coat over new plastered surface including rubbing and cleaning the surface including supply of all materials labour and T&P etc. required for proper completion of the work. |
| 14 | Finishing wall exterior paint with silicone additives of required sheds new worktwoor more coatwith cleatts applied @1.43 Ltr./10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm approved quality such as Apex, Ultima, weather coat all guard (13.47.1) |
| 15 | Earth work in cutting in trenches for levelling of space, and pipe, cable etc. in ordinary soil(Loan clay or sand) including lift up to 1.5 M lead up to50 M and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by engineerin charge with in a lead of 50 M |
| 16 | Providing and laying cement concrete 1:6:12 ( 1 cement : 6 find sand : 12 graded brick aggregate 40 mm nominal size) Including supply of all material, labour, T&P, curing, cost of formwork complete in all respect in foundation and under floors. (S.I. No.273) |
| 17 | M-150 class brick work in 1:4 cement and coarse sand of 2.25 F.M mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work. |
| 18 | Providing, laying, spreading and compactingG-2 stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheel roller 80-100 kn static roller in stage to proper grade and camber MORD specification 405.2 |
| 19 | Providing, laying, spreading and compactingG-3 stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheel roller 80-100 kn static roller in stage to proper grade and camber MORD specification 405.2 |
| 20 | Supply and laying of 80mm thick grey mechanically compressed interlocking cement concrete paver blocks manufactured by high pressure and controlled vibration machine having minimum 5 mm thick topping of cement mixed with 20% marble powder the compressive strength of concrete paver bloks shall not be less than 30MPa & 4.50 Kg an I.S.I marked as per drawing and confirming to RC-SO-63-2004 over a with 15 cm thick base concrete 1:6:12 and bed of 5.0 cm thick local fine sand including VAT etc. required for proper completion of the work. |
| 21 | 12 mm thick plaster with cement and coarse sand of 1.25 F.M mortar in proportion of 1:4 over brick work including supply of all materials, labour and T&P etc. required for proper completion of work and also including racking and washing joint as per direction of E/I. |
| 22 | Laying C.C on Boxing0.05cm thick consisting 1:2:4 cement, coarse sand and approved 2cm gauge graded stone grit over preparedincluding supply of all materials labour and T&P etc. required for proper completion of work as directed by Engineer-in- charge |
| 23 | Item No. 29 to 34 Maintenance of Second Year (@0.25%) |
| 24 | Item No. 29 to 34 Maintenance of Second Year (@0.50%) |
| 25 | Item No. 29 to 34 Maintenance of Second Year (@0.75%) |
| 26 | Item No. 29 to 34 Maintenance of Second Year (@1.00%) |