| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. |
| 2 | Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge. |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 4 | Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump agreegates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excludingthe cost of end pieces )d) 0.90 metre x 0.60 metre nominal section |
| 5 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting,fitting etc, complete as per direction of the Engineer - in - charge.b) Mesh size 125 mm x 125 mm with 10 SWG wire |
| 6 | Cost of stone / laterite boulder at quarry site including Royalty (Royalty certificate in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty of stone/laterite boulder will be deducted from the bills of works) .Stone Bouldera) Panchami source (Each weighing 25 kg & above) |
| 7 | Labour charges for stacking unloaded boulder / shingles to make them convenient for measurement as per direction of the Engineer-in-charge.a) Boulder of size above 20 kg |
| 8 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.(iii) 15 cm av. diameterNote: Diameter of pile to be measured at a distance of 1.5m from the thicker end. |
| 9 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.(iii) 15 cm av. diameterNote: 1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end. |
| 10 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus. |
| 11 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in chargeb) Two Coat |
| 12 | Supplying, dressing and stacking at site bamboo pins above 5 cm.diameter and upto 7.5 cm. diameter. (Dia. to be measured at midlength). |
| 13 | Driving bamboo pins in standing or flowing water including scaffoldingand driving appliances.(a) Where boats are not necessary. |
| 14 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. |
| 15 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre.(a) Where boats are not necessary. |
| 16 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all means,including other incidental charges complete.Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate. |
| 17 | Labour charges for filling HDPE bags with filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum). |
| 18 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as perprofile. |
| 19 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,B) Beyond 1.00 km and upto 2.00 kmNote : Add extra rate towards compensation for earth for land owned /arranged by the contractor over rate of earthwork for land owned /arranged by the Department and for royalty charges on earth as per latest rate as mentioned in PWD Schedule. The royalty will be paid to the agency on production of necessary documents in support of payment made toward the royalty. During initial payment of bill a deduction as per considered rate may be made. As per PwD schedule compensation charge Rs.25.00 per cum and Royalty charge Rs.18.00 per cum. Final rate = Rs.(227.00+25.00+29.00+5.30) = Rs.286.30 per cum |