| 1 | vf/k’kklh vfHk;Urk] fo|qr forj.k [k.M&f}rh;] vktex<+ ds dk;Z{ks= esa ¼eq[;ea=h uxj l`tu ;kstuk o\"kZ 2024&25½ ds vUrxZr uxj iapk;r egjktxat ds vUrxZr v{k;oV csdk: pkSd] v{k;oV iapk;r Hkou ,oa uxj iapk;r vterx<+ Vkmu esa eNyh ikyu iks[kjh ds ikl ,y0Vh0 ykbu dk fuekZ.k ,oa ,y0Vh0 ohty dks ,y0Vh0 ,0ch0lh0 djus ,oaZa vU; dk;Z ¼leLr lkexzh dh ynkbZ] |
| 2 | uxj iapk;r egjktxat ds vUrxZr v{k;oV es PCC Pole 8.5 mtr, 12 Nos. A.B. Cable L.T. (3x120+1x95+1x16) Sq. mm, 1850 Mtr. Distribution Box 3 Phase, 10 Nos. Stay Insulator, 3 Nos. Cable L.T. XLPE 1x25 Sq. mm, 20 Mtr yxkdj leLr fQfVax ds lkFk ,y0Vh0 ,0ch0lh0 ykbZu fuekZ.k dk dk;ZA |
| 3 | Erection of PCC pole 8.5 long |
| 4 | Laying of L.T. ABC size 3X120 + 1X95+1x16 Sqmm |
| 5 | Fiting of 3 phase LT distribution Box Including related work |
| 6 | Fixing and grouting of Stay rod including related work |
| 7 | stay insulatour |
| 8 | Concreating ofPole as per standered specefication |
| 9 | Proviting and fixing of Hoarding Board including typing |
| 10 | DeCentralied Material |
| 11 | Distribution Box Clamp |
| 12 | Suspension Clamp |
| 13 | Eye-Hook |
| 14 | Dead End clamp |
| 15 | Connector LT Aluminium |
| 16 | MS Bolt & Nut (with 1-Washer) 1.25\"x3/8\" |
| 17 | Pearcing Connector For ABC 3x120 |
| 18 | Alluminium Lugs 25 MM |
| 19 | Stone Pad |
| 20 | L.T. Bare Neutral Connector 95 SQ. MM |
| 21 | Dead end Sealing cap |
| 22 | uxj iapk;r egjktxat ds vUrxZr csdk: pkSd es A.B. Cable L.T. (3x120+1x95+1x16) Sq. mm, 3500 Mtr. PCC Pole 8.5 mtr, 30 Nos. Distribution Box 3 Phase, 14 Nos. STP 11 Mtr, 2 No. Earth Rod 2540x20 mm, 25 Nos. G.I. wire 6 swg, 125 KG. Cable L.T. XLPE 1x25 Sq. mm, 40 mtr. yxkdj leLr fQfVax ds lkFk ,0ch0lh0 ykbZu fuekZ.k dk dk;ZA |
| 23 | Erection of PCC pole 8.5 long |
| 24 | Erection of HT pole 11 mtr long |
| 25 | Painting of HT pole |
| 26 | Laying of L.T. ABC size 3X120 + 1X95+1x16 Sqmm |
| 27 | Fiting of 3 phase LT distribution Box Including related work |
| 28 | Fixing and grouting of Stay rod including related work |
| 29 | Fixing of earth rod 2540X20 MM |
| 30 | Concreating of Pole as per standered specefication |
| 31 | Proviting and fixing of Hoarding Board including typing |
| 32 | DeCentralied Material |
| 33 | Stay Insulator |
| 34 | Stone Pad |
| 35 | Distribution Box Clamp |
| 36 | Eye-Hook |
| 37 | Suspension Clamp |
| 38 | Dead End clamp |
| 39 | Aluminium Paint |
| 40 | Pearcing Connector For ABC 3x120 |
| 41 | MS Bolt & Nut (with 1-Washer) 1.25\"x3/8\" |
| 42 | Connector LT Aluminium |
| 43 | RED Oxide Paint |
| 44 | Dead end Sealing cap |
| 45 | Alluminium Lugs 25 MM |
| 46 | L.T. Bare Neutral Connector 95 SQ. MM |
| 47 | uxj iapk;r egjktxat ds vUrxZr v{k;oV iapk;r Hkou es Distribution Box 3 Phase, 10 Nos. A.B. Cable L.T. (3x120+1x95+1x16) sq mm, 1880 mtr. PCC pole 8.5 mtr, 20 Nos.yxkdj leLr fQfVax ds lkFk ,y0Vh0 ,0ch0lh0 ykbZu fuekZ.k dk dk;ZA |
| 48 | Erection of PCC pole 8.5 long |
| 49 | Laying of L.T. ABC size 3X120 + 1X95+1x16 Sqmm |
| 50 | Fiting of 3 phase LT distribution Box Including related work |
| 51 | Fixing and grouting of Stay rod including related work |
| 52 | Fixing of earth rod 2540X20 MM |
| 53 | Concreating of Pole as per standered specefication |
| 54 | Proviting and fixing of Hoarding Board including typing |
| 55 | DeCentralied Material |
| 56 | Stay Insulator |
| 57 | Distribution Box Clamp |
| 58 | Dead End clamp |
| 59 | Suspension Clamp |
| 60 | Eye-Hook |
| 61 | Dead end Sealing cap |
| 62 | Pearcing Connector For ABC 3x120 |
| 63 | MS Bolt & Nut (with 1-Washer) 1.25\"x3/8\" |
| 64 | Alluminium Lugs 25 MM |
| 65 | Stone Pad |
| 66 | L.T. Bare Neutral Connector 95 SQ. MM |
| 67 | uxj iapk;r vterx<+ Vkmu ess eNyh ikyu iks[kjh ds ikl ACSR Weasel Condu. Old & Use, 92 KG. Distribution Box 3 Phas, 14 Nos. Cable L.T. XLPE 1x25 Sq. mm, 28 mtr. PCC Pole 8.5 mtr, 6 Nos. LT ABC Cable 3x95+1x70+1x16 sq mm, 0.460 Km. 1x240 sq. mm Aluminium Cable PVC, 40 Mtr. D.O. Fuse Set 11 KV, 1 set. yxkdj leLr fQfVax ds lkFk ,0Vh0 ykbu dks ohly ls ,y0Vh0 ,0ch0lh0 djus dk dk;ZADismentling and carrage charge to store, 1 Nos,Re-Erection of tilled pole with all fitt, 2 Nos.Dismentling of old and used, 1200 Nos. |
| 68 | Erection of PCC pole 8.5 long |
| 69 | Laying of L.T. ABC size 3X95 + 1X70+1x16 Sqmm |
| 70 | Fiting of 3 phase LT distribution Box Including related work |
| 71 | Fixing and grouting of Stay rod including related work |
| 72 | Fixing of earth rod 2540X20 MM |
| 73 | Fixing of DO Fuse set |
| 74 | ACSR WISEL CONDUCTOR O&U |
| 75 | Providing 40 MM dia G.I. Pipe and 60 feet deep boar Boaring Earthing including cost of matarial |
| 76 | Re Erection of old tilled pole at site |
| 77 | Providing 40 MM dia G.I. Pipe and 60 feet deep boar Boaring Earthing including cost of matarial |
| 78 | Laying of Aluminium cable PVC 1X240 SQMM |
| 79 | Concreating of Pole as per standered specefication |
| 80 | Proviting and fixing of Hoarding Board including typing |
| 81 | DeCentralied Material |
| 82 | Stay Insulator |
| 83 | Stay clamp 8.5 M PCC Pole |
| 84 | MS Bolt & Nut (with 1-Washer) 1.25\"x3/8\" |
| 85 | Dead end Sealing cap |
| 86 | Lug. Alu. 240 SQ MM |
| 87 | Ferrule connector 95-95 SQ. MM |
| 88 | L.T. Bare Neutral Connector 95 SQ. MM |
| 89 | Dead End Clamp with Eye Hook (Insulated) |
| 90 | Stone Pad |
| 91 | Aluminium Lug 35 MM |
| 92 | LT Protection Fuse Set |
| 93 | Suspension clamp with eyehook (Insulated |
| 94 | Piercing Connector 95-25 SQ. MM |
| 95 | Aluminium lug 120 mm |
| 96 | Distribution Box Clamp |