|
| 1 | Drawing LT ABC |
| 2 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 3 | Dismantling(withoutdamage)onekmLT3ph4wireOHline,cross arms, insulators and stacking the conductors in rolls. |
| 4 | Dismantling(withoutdamage)onekmLTadditionalconductorline, cross arms, insulators and stacking the conductors in rolls. |
| 5 | Dismantling(withoutdamage)onekmLTSph2wireOHline,cross arms, insulators and stacking the conductors in rolls. |
| 6 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 7 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 8 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 9 | Providing Stay for LT poles incl. digging & back filling pit. |
| 10 | ProvidingoneCoilEarthusingGIearthwire,diggingseparatepitat standard distance away from the pole/structure & backfilling. |
| 11 | InstallingOneNo.4waySatelliteConnectorofsizeMain:16to95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 12 | TransportingLTABCbyhiredvehicletoadistanceupto5kmand carring up to 2 drum including loading and un loading using crane |
| 13 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 14 | Providing End Caps |
| 15 | Erection of suspension clamp for LT ABC of any size |
| 16 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 17 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 18 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 19 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 20 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 21 | Fitting of one No. pole top service connection box of standard size (up to 4 way) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height excluding giving connections |
| 22 | Installation of Insulation piercing connector for main to service line main:16-95 sqmm, Tap 16-95 sqmm |
| 23 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 24 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |