|
| 1 | Earth work excavetion in o/s i/c 1.50m lift and 30m lead as per IRRI SOR-ch-4 S.N0-1 |
| 2 | Earth work excavetion in o/s to every additional 30m lead or part of 30m for every edditional 1.50m lift or i/c charge as per IRRI SOR-ch-4 Si.NO.(1+13) |
| 3 | P/L of P.C.C in 1:5:10 with 40mm s/g ,cement,and sand morter in all charge as per S.I No 4.1/4.1.10 |
| 4 | Brick work in i:4 cement and sand morter in complition of work As per S.I .No 6.1/6.1.1 |
| 5 | 12MM Thick plaster in 1:4 with cement and course sand morter in all comp of work S.I.No 13.1/13.4.1 |
| 6 | P/L Of R.C.C in 1:1.5:3.with 10mm s/g cement and sand morter in complition of work As per S.I.No 5.1/5.12 |
| 7 | Steel reinforcement for R.C.C work includingstraightening,cutting, bending,placing in position and binding all complete As per S.I.No 5.22 A |
| 8 | P/L of C.C. work 1:2:4 with s/g cement and Course sand in all charge As per S.I No4.1/4.1.3 |
| 9 | S/L of 40mm Brick Ballast i/c all charge as per PWD SOR ch-1 -2(1.2) |
| 10 | S/L of 20mm Greded stone grit i/c all charge as per PWD SOR CH-1(3b+cartage e.tc) |
| 11 | S/L ofCoarse sandi/c all chargeas per PWD SOR-Ch-1 (6-1.9) |
| 12 | S/L of Loose bricks on flat over coarse sand as per PWD SOR-ch-4 2-11.1 A(labour+material) |
| 13 | S/L of 110mm Dia PVC Pipe I/C All charge as per PWD SOR Ch-23 S.I no 30c |
| 14 | S/L of 140mm Dia PVC Pipe I/C All charge As perPWD SOR Ch-23 S.I no 30D |
| 15 | Transportation ofmaterial & Lowering set loading and unloadingM.I. order no921 date 06-07-2024 |
| 16 | 175 mm dia lowring Drilling i/c all charge as per M.I.SOR-order |
| 17 | S/L of 140 mm dia 6kgf /cm PVC plan pipei/c all chargeAs perPWD SOR Ch-23 S.I no 30D |
| 18 | S/L of 140 mm Dia 6kgf /cm PVC Slotedpipei/c all chargeAs perPWD SOR Ch-23 S.I no 30D |
| 19 | S/L of 140 mm Dia 6kgf /cm PVC Top/End cap i/c all chargeAs per market rate |
| 20 | Supply of Solvent cement i/c all charge as per M.I. order 921 date 06-07-2024 |
| 21 | Supply of nylon mesh i/c all chargeas per M.I. order 890 date 04-07-2024 |
| 22 | Supply of nylon dori i/c all charge as per market rate |
| 23 | Supply of 100 / 110 mm 6kgf/cm bend i/c all charge as per PWD SOR CH-1(30-16) |
| 24 | Supply of 125mm steel jalii/c all chargeas per PWD SOR CH-21(138) |
| 25 | Supply of 110 mm iron clamp i/c all charge per market rate |
| 26 | Supply of 140 gate valve i/c all charge as per market rate |
| 27 | Pea Gravel (2-4mm) filling arround the pipe Drilling Hole M.I. order no1245 date 25-02-2023 |