}

Tender For Mech-Re-Design Of Eqpt For Hsm#1, Hazira-Gujarat

Arcelor Mittal Nippon Steel India Limited has published Tender For Mech-Re-Design Of Eqpt For Hsm#1. Submission Date for this Tender is 29-04-2025. Furnace supply Tenders in Hazira Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

48799159
Tender For Mech-Re-Design Of Eqpt For Hsm#1
Open Tender
Indian
Gujarat
Hazira
29-04-2025

Tender Details

Tender For Mech-Re-Design Of Eqpt For Hsm#1 2000165878 10 10 10 BASIC ENGINEERING & DESIGN OF DIFF. SER. 1 LO Email : SANJAY.SHIROYA@AMNS.IN Contact : Name : Sanjay Shiroya Item Details : SPR FOR HSM#1 MECH-RE-DESIGN OF EQPT FOR RHF-CY-2025 A. Proposal for replacement of existing cooled type skids with non-cooled design. Info - There are 2 nos. of reheating furnaces at HSM1 supplied by M/s FIVE STEIN. The reheating furnace is a top and bottom fired walking beam furnace for slab reheating. In RHF there are TWO types of skid (moveable and fixed) used to transfer slab from charging side to discharge side. Fixed skid just at the entry of RHF is called RIDER SKID and used to transfer slab from charging table to furnace. PROBLEM STATEMENT - Frequent problem of water leakages in rider skid and post.Rider skid foundation support grouting damaged frequently. (Item: 55) in attached drg.010-65-018. IMPACT-Temp drop problem in bar Leakage water causes corrosion in RHF basement walking beam structure Increase in break down. B. Redesign the slab extractor arm to have increased operating life. Info - In RHF there are total SIX slab extractor arm to transfer slab from furnace to discharge roller table. PROBLEM STATEMENT - Frequent crack generation in arm and even arm cracked in two pieces. IMPACT- Increase in breakdown Chances of major equipment damage. VENDOR SCOPE1.Study of existing water-cooled rider skids design at reheating furnace HSM#1 Hazira along with exploring the feasibility for fitment of the recommended non-cooled rider skid design of reheating furnace at AM Florange. 2. Preparation of detail fabrication drawings of rider skids and supporting structure modification. 3. Preparation of strengthening drawing for fixed civil supports according to the non-cooled skid design. 4. Finite element analysis (FEA) for the slab extractor arm to identify the cause of failure. 5. Detail fabrication drawing of extractor arm with modification based on the FEM study. 6. Study of the finger bolt elongation issue of slab extractor arm. 7. Study report of existing rider skid design for feasibility of replacement with non-cooled rider skids design. 8. Preparation of the fabrication drawings of non-cooled rider skids and mounting frame. 9. Preparation of civil support modification / strengthening drawing. 10. 3D model and FEA of the existing slab extractor Arm. 11. Fabrication drawings of extractor Arm with suitable strengthening. 12. Study and recommendation of finger screw elongation problem. AMNS SCOPE:- 1. All required drawings of Entry side of RHF, showing the rider skid arrangement and supporting structure. 2. Civil drawings of fixed foundation area. 3. Slab extractor arrangement and related drawings. 4. Arrangement of necessary gate passes. 5. Safety induction training. Page 2 of 2 ArcelorMittal Nippon Steel India Pvt Ltd AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FTC013787 Request for Quotation Number 6000132669 Date 21.04.2025 Submission Date 29.04.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Rutvik Dudakiya Contact Email RUTVIK.DUDAKIYA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 6. Office space along with internet / LAN connectivity, access to printer, stationary items and a meeting room. 7. Arrangement of printer, plotter and those operators. 8. Emergency medical help. 9. Access to Canteen facility. 10.Personal Protective Equipment (PPE) BASIC *According to Job, Make a team of Competent Manpower with Supervisor. MSA to be followed strictly, after checking of all data SCRUM approval will release. *If New associates (competency as per MSA) to be introduced, need to inform in advance & Site in charge must ensure that their All Associates are aware of Hazards exists in HSM. *Ensure All Associates are Fit as per AMNS Guideline. *Any job must not to be started without information/intimation of AMNS Engineer Job to be start after proper TBT & WPS. *Contactor & their site in charge must monitor IN OUT time discipline of them manpower & Any person Must not continue Duty for more than 16 hours in HAZIRA. *complex & person must take weekly off (Maximum)on 9th day. *Execution Form 10 is required for Tools are to be used in case of Job work. *Don’t move to other/unknown area of HSM unnecessarily. *Original ADHAR CARD required for Gate pass process. *In case of not following any AMNS guideline, penalty will be applicable base on Consequence management policy of AMNS. *Safety 1. Violation of CHSE Policy will be dealt as per AMNS Consequence management policy and it will attract penalty accordingly. 2. Contractor must ensure safe transport of their operator and maintenance team inside plant premises. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. Road safety rules must be followed for safe movement inside plant premises. 3. Contract Owners must attend Contract Owner’s Meeting without fail as and when advised by AM/NS India. 4. Contracted Equipment should have all standard OEM safety devices and must adhere to AM/NS India Safety Device Matrix, provided along with this tender / work order. 5. Contractor shall provide the equipment and operator as per land of law (e.g., RTO Laws & Fitness) and company policies (e.g., Safety Certification & Competency Training). 6. Contractor should provide required number of relievers for safe operation. No operators will be permitted to work beyond 12 hrs and should be given weekly off regularly. 7. Penalty will be applicable for violating safety/statutory norms, mobile policy/vehicle driving policy as per AMNS consequence management policy. 8. Operator and maintenance crew will mandatorily use all necessary PPE s as per site conditions. All PPEs shall be in the scope of Vendor. 9. Contracted Equipment should have all OEM standard safety devices and as required by AM/NS India, as per table below. 10. Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass.

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail