| 1 | General directions and descriptions of work and materials given in the specifications are not necessarily repeated in the Schedule of Price. |
| 2 | Currency of BidBidders are allowed to quote in currency(ies) - INR only |
| 3 | It shall be the sole responsibility of the CONTRACTOR to duly observe and perform and fulfil all obligations of all laws, rules, regulations, orders and formalities during the entire period / currency of the Contract, applicable to Good and Service Tax (GST), Customs Duty, etc. on the import, manufacture, sale and / or supply of any material(s) / equipment to the OWNER and performance of the works contract service under the Contract. The CONTRACTOR shall keep the OWNER and its Project Management Consultant (PMC) indemnified from and against any and all claims, demands, prosecutions, actions, proceedings, penalties, damages, demurrages and / or other levies whatsoever made or levied by any Court, Tribunal or the Customs or other Authorities with respect to any alleged breach, evasion or infraction of such duties, taxes, charges or levies or any breach or infraction of any applicable laws, rules, regulations, orders or formalities concerning the same and from the consequence thereof. |
| 4 | The Lumpsum Price of Works Contract Service shall be deemed to cover various factors including but not limited to cost of materials /equipment / Services, overheads, bidding cost, financing costs, profits, mobilization & demobilization cost, commissioning spares, mandatory spare, spares during O&M etc., as applicable. Unless the scope expressly excludes certain provisions from the CONTRACTOR’s scope in the Bidding document / Contract, no additional payment on any such head expressly not mentioned herein in the Bidding Document / Contract shall be entertained on a later date. |
| 5 | Bidder shall submit their Priced Bid duly filled in with prices, stamped & signed by Bidder on each page and scanned & uploaded in the respective “PRICE BID” folder only on the e-Procurement Portal as mentioned in the ITB / IFB in the following manner:I)Lumpsum EPC work Price as per FORM SP-01II) O & M prices as per FORM SP-02*for three 3 years .III) Break-up of quoted EPC Price in FORM SP-03*Prices shall be considered for evaluation on NPV basis as per Evaluation Methodology specified in Section II of the Tender.The requirement of CAMC (Comprehensive Annual Maintenance Contract) of critical equipment, as specified in the Technical Volume, shall be covered under the scope of the main EPC contract. No separate payment shall be made towards the CAMC. |
| 6 | The unpriced commercial bid shall contain the unpriced copy of price bid with the word “QUOTED” mentioned in the Price Column. Spares for start-up/commissioning and mandatory spares and any other Tools and Tackles as required are in CONTRACTOR\"s scope and are deemed to be included in their quoted Lumpsum Price, irrespective of whether such spares/items are categorically mentioned or not in the bidder’s bid. No claim on this issue shall be entertained at a later date after award of work and at any stage during the faithful execution of the contract. |
| 7 | Price must be filled strictly in the format enclosed. If price is quoted in separate typed sheets or any variation is noticed with respect to the attached format, the bid is liable to be rejected.In case any contradiction is noticed between price formats attached with bidding document and price format used in price bid submitted, description/ contents of price format attached with bidding document shall prevail. |
| 8 | Input Tax Credit (ITC) on account of GST is applicable. |