| 1 | Line staple 66 kvas required other than specified |
| 2 | bend staple 66kv |
| 3 | Stay clamps 66 kv |
| 4 | 66KV polymer Disc Insulator |
| 5 | Erection & tightening of Stay Set including fixing of guy insulators, digging of pits, filling and ramming complete in all respect |
| 6 | Desagging of wolfconductor |
| 7 | Carriage ofMaterial by manual and through mechanical transportation from Divisional Store to road head and then Site of Work. |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. |
| 9 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing :1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 11 | Pipe type earthing materil complete with necessary bolts , nuts and washers , salt , sand , charcole etc. to two four pole strecture in all respect as per site requirement. |
| 12 | Providing name & phase plate & applying redoxcide and aluminum paint on two four pole strecture in all respect as per site requirement. |