|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (a) All kinds of soil. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (a) 1:4:8 (1 Cement : 4 coarse sand(zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.(a) In cement mortar |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 7 | Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 8 | Columns, Pillars, Piers, Abutments, Posts and Struts |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. (a)Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 10 | Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in superstructure above plinth level up to floor V level (a) Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 11 | 15 mm cement plaster on the rough side of single or half brick wall of mix : (a)1:6 (1 cement: 6 fine sand) |
| 12 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 13 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : (a)Two or more coats on new work. |
| 14 | Applying priming coat : (a) With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works |
| 15 | Finishing walls with Acrylic Smooth exterior paint of required shade : (a) New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm). |
| 16 | Credit for available dimantled unserviciable materials to agency (a) Old rusted MS/GI sheet, angle, flat, Tee and the like |
| 17 | Credit for available dimantled unserviciable materials to agency (a) Old rusted MS/GI sheet, angle, flat, Tee and the like |